Microgrids have presented themselves as an effective concept to guarantee a reliable,efficient and sustainable electricity delivery during the current transition era from passive to active distribution networks.Moreov...Microgrids have presented themselves as an effective concept to guarantee a reliable,efficient and sustainable electricity delivery during the current transition era from passive to active distribution networks.Moreover,microgrids could offer effective ancillary services(AS)to the power utility,although this will not be possible before the traditional planning and operation methodologies are updated.Hence,a probabilistic multi-objective microgrid planning(POMMP)methodology is proposed in this paper to contemplate the large number of variables,multiple objectives,and different constraints and uncertainties involved in the microgrid planning.The planning methodology is based on the optimal size and location of energy distributed resources with the goal of minimizing the mismatch power in islanded mode,while the residual power for AS provision and the investment and operation costs of the microgrid in grid-connected mode are maximized and minimized,respectively.For that purpose,probabilistic models and a true multi-objective optimization problem are implemented in the methodology.The methodology is tested in an adapted PG&E 69-bus distribution system and the non-dominated sorting genetic algorithmⅡ(NSGA-Ⅱ)optimization method and an analytic hierarchy process for decision-making are used to solve the optimization problem.展开更多
文摘Microgrids have presented themselves as an effective concept to guarantee a reliable,efficient and sustainable electricity delivery during the current transition era from passive to active distribution networks.Moreover,microgrids could offer effective ancillary services(AS)to the power utility,although this will not be possible before the traditional planning and operation methodologies are updated.Hence,a probabilistic multi-objective microgrid planning(POMMP)methodology is proposed in this paper to contemplate the large number of variables,multiple objectives,and different constraints and uncertainties involved in the microgrid planning.The planning methodology is based on the optimal size and location of energy distributed resources with the goal of minimizing the mismatch power in islanded mode,while the residual power for AS provision and the investment and operation costs of the microgrid in grid-connected mode are maximized and minimized,respectively.For that purpose,probabilistic models and a true multi-objective optimization problem are implemented in the methodology.The methodology is tested in an adapted PG&E 69-bus distribution system and the non-dominated sorting genetic algorithmⅡ(NSGA-Ⅱ)optimization method and an analytic hierarchy process for decision-making are used to solve the optimization problem.