期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
基于ALE算法的水射流破土特性 被引量:3
1
作者 杨志鹏 刘剑 +2 位作者 蓝雄东 王观石 罗嗣海 《科学技术与工程》 北大核心 2023年第15期6378-6384,共7页
为探究水射流破土过程中射流参数对破土特性的影响,通过拉格朗日-欧拉方法(Arbitrary Lagrange-Euler, ALE)流固耦合算法建立了淹没状态下水射流破土的数值模型,开展水射流破土的室内试验验证了数值计算结果的准确性。基于数值模型分析... 为探究水射流破土过程中射流参数对破土特性的影响,通过拉格朗日-欧拉方法(Arbitrary Lagrange-Euler, ALE)流固耦合算法建立了淹没状态下水射流破土的数值模型,开展水射流破土的室内试验验证了数值计算结果的准确性。基于数值模型分析不同射流速度和靶距下冲蚀深度与体积的变化特征,探讨射流参数对破土特性的影响机制。研究结果表明:水射流破土形成的冲蚀深度随着射流速度的增大而逐渐变大,且随着射流时间的增加会呈现线性增长、缓慢稳定增长和稳定三个阶段;靶距越大冲蚀深度越小,但冲蚀体积受射流速度的影响较大,在低速时冲蚀体积随靶距的减小而增大,而在高速时冲蚀体积则会先减小后增大再减小;基于试验结果分析敏感性可知射流速度对冲蚀深度与体积的影响程度要大于靶距。 展开更多
关键词 ALE算法 水射流破土 数值模拟 靶距
下载PDF
Detection and treatment of water inflow in karst tunnel:A case study in Daba tunnel 被引量:7
2
作者 LI Xiang-hui ZHANG Qing-song +3 位作者 ZHANG Xiao lan xiong-dong DUAN Chong-hao LIU Jian-guo 《Journal of Mountain Science》 SCIE CSCD 2018年第7期1585-1596,共12页
In a karst tunnel, fissures or cracks that are filled with weathered materials are a type of potential water outlet as they are easily triggered and converted into groundwater outlets under the influence of high groun... In a karst tunnel, fissures or cracks that are filled with weathered materials are a type of potential water outlet as they are easily triggered and converted into groundwater outlets under the influence of high groundwater pressure. A terrible water inrush caused by potential water outlets can seriously hinder the project construction. Potential water outlets and water sources that surrounding the tunnel must be detected before water inflow can be treated. This paper provides a successful case of the detection and treatment of water inflow in a karst tunnel and proposes a potential water outlet detection(PWOD) method in which heavy rainfall(>50 mm/d) is considered a trigger for a potential water outlet. The Daba tunnel located in Hunan province, China, has been constructed in a karst stratum where the rock mass has been weathered intensely by the influence of two faults. Heavy rain triggered some potential water outlets, causing a serious water inrush. The PWOD method was applied in this project for the treatment of water inflow, and six potential water outlets in total were identified through three heavy rains. Meanwhile, a geophysical prospecting technique was also used to detect water sources. The connections between water outlets and water sources were identified with a 3-D graphic that included all of them. According to the distribution of water outlets and water sources, the detection area was divided into three sections and separately treated by curtain grouting. 展开更多
关键词 Karst tunnel Water inrush Potential water outlet detection Geophysical prospecting technique Water inflow GROUTING
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部