期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Present Status of the KSTAR Superconducting Magnet System Development
1
作者 Keeman Kim H.K.Park +26 位作者 K.R.Park B.S.Lim S.I.Lee m.k.kim Y.Chu W.H.Chung S.H.Baek J.Y.Cho H.Yonekawa A.Chertovskikh Y.B.Chang J.S.Kim C.S.Kim D.J.Kim N.H.Song K.P.Kim Y.J.Song I.S.Woo W.S.Han D.K.Lee Y.K.Oh K.W.Cho J.S.Park G.S.Lee H.J.Lee T.K.Ko S.J.Lee 《Plasma Science and Technology》 SCIE EI CAS CSCD 2004年第5期2445-2450,共6页
The mission of Korea Superconducting Tokamak Advanced Research (KSTAR)project is to develop an advanced steady-state superconducting tokamak for establishing a scientificand technological basis for an attractive fusio... The mission of Korea Superconducting Tokamak Advanced Research (KSTAR)project is to develop an advanced steady-state superconducting tokamak for establishing a scientificand technological basis for an attractive fusion reactor. Because one of the KSTAR mission is toachieve a steady-state operation, the use of superconducting coils is an obvious choice for themagnet system. The KSTAR superconducting magnet system consists of 16 Toroidal Field (TF) coils and14 Poloidal Field (PF) coils. Internally-cooled Cable-In-Conduit Conductors (CICC) are put into usein both the TF and PF coil systems. The TF coil system provides a field of 3.5 T at the plasmacenter and the PF coil system is able to provide a flux swing of 17 V-sec. The major achievement inKSTAR magnet-system development includes the development of CICC, the development of a full-size TFmodel coil, the development of a coil system for background magnetic-field generation , theconstruction of a large-scale superconducting magnet and CICC test facility. TF and PF coils are inthe stage of fabrication to pave the way for the scheduled completion of KSTAR by the end of 2006. 展开更多
关键词 superconducting magnet KSTAR CICC
下载PDF
水库泥沙淤积空间分布的长期估价
2
作者 T.H.YOON m.k.kim 俞瑞堂 《水利水电快报》 1998年第7期23-25,共3页
为估计八堂水库建坝后库内的河床演变及随之产生的库容减少,开发了三维输沙模型和拟三维水工模型。模拟的河床演变总的情况与该水库在大坝建成后16a中实测的河床演变十分吻合。八堂水库的地形变化导致了泥沙净淤积,模拟结果的总精... 为估计八堂水库建坝后库内的河床演变及随之产生的库容减少,开发了三维输沙模型和拟三维水工模型。模拟的河床演变总的情况与该水库在大坝建成后16a中实测的河床演变十分吻合。八堂水库的地形变化导致了泥沙净淤积,模拟结果的总精度表明,该模型可用来作为估计浅水河床演变的一个工具。 展开更多
关键词 水库淤积 河道演变 水工模型试验 淤积计算
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部