期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Filtration Features in the Base of the Bratsk HPP (Hydroelectric Power Station) Concrete Dam
1
作者 mark a. sadovich Tatyana F. Shlyakhtina +2 位作者 anna M. Kuritsyna anastasia a. Shkuleva Irina S. Semenova 《Journal of Civil Engineering and Architecture》 2018年第8期543-549,共7页
The design protection of the base of the Bratsk HPP (Hydroelectric Power Station) dam from filtration coming from the water reservoir included the arrangement of several cement-grout curtains and the system of drain... The design protection of the base of the Bratsk HPP (Hydroelectric Power Station) dam from filtration coming from the water reservoir included the arrangement of several cement-grout curtains and the system of drainage holes in the 2nd and 4th columns. During operation, increased hydrostatic back pressure at the base of the dam was found, which indicated the low efficiency of the base design protection. To reduce back pressure B. E. Vedeneev Hydro Technic Institute proposed the device of “advanced” drainage holes from the cement-grout gallery near the upstream face. The implementation of the proposal in a number of sections of the dam has led to a decrease in back pressure, but affected filtration in the drainage system, increasing it significantly. The article examines filtration features of “advanced” drainage holes and their dependence on the severity of winters. The spread of the practice of “advanced” drainage in other sections of the dam requires caution and further investigations of the nature of filtration. 展开更多
关键词 Cement-grout curtain base drainage back pressure “advanced” drainage BOREHOLE seepage discharge filtration mode.
下载PDF
Current State of High 120 m Concrete Dam Bratsk Hydroelectric Power Plant
2
作者 mark a. sadovich Tatyana F. Shlyakhtina +1 位作者 Sofia M. Ginzburg alexander M. Yudelevich 《Journal of Civil Engineering and Architecture》 2017年第3期222-231,共10页
The research object was high 120 m concrete gravity dam of the Angara Bratsk hydroelectric power plant. The state of the concrete dam is estimated based on the results of continuous supervision performed by site perso... The research object was high 120 m concrete gravity dam of the Angara Bratsk hydroelectric power plant. The state of the concrete dam is estimated based on the results of continuous supervision performed by site personnel as well as periodic monitoring. According to the classification of the interrelations in the system "concrete-environment", there were selected some important parts of dams and a comprehensive analysis of concrete was executed on these parts. Concerning the complex research of concrete, a combination of full-scale tests with core-sampling has been proposed. Core samples tests had an object to study the deep concrete layers and to determine the specific indicators such as strength, density, porosity, comparative diameter of capillary pores, CaO content in cement stone and others. Obtained findings and recommended criteria can be applied when selecting technologies for constructing dams that guarantee their durability in the north. 展开更多
关键词 Concrete gravity dam hydroelectric power plant monitoring.
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部