期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Introduction of New Method on Engineering Risk Assessment:Engineering Errors and Effects Analysis(3EA)
1
作者 mohammad mahdi izadi 《Management Studies》 2018年第6期527-530,共4页
Construction and commissioning accidents investigation shows that engineer’s errors in basic and detailed phases are the main causes.It will be gained more efficiency of investment when a relevant method is applied f... Construction and commissioning accidents investigation shows that engineer’s errors in basic and detailed phases are the main causes.It will be gained more efficiency of investment when a relevant method is applied for error identification and risk assessment in basic and detailed phases.Most of risk assessment methods are related to construction phase,meanwhile hidden risks that were happen in previous phases cannot be found by these methods.Although HAZOP study can be applied in detail phase but it can help to find process defections.Importance of identifying risks in basic and detailed phases is to apply preventive actions against birth and grows risks.This risk assessment method can reduce costs and improve environmental protection,safety,and reliability of designs.The main purpose of this study is to identify engineer’s errors and analyse their HSE effects.The method is applied in seven oil and gas engineering projects in Iran,raising the level of engineer’s attention to safety precautions and environmentally-friendly design,reducing the cost of improving the level of safety and environmental protection,improving environmental protection,safety,and design reliability,and improving procedures related to design process and control have been achieved. 展开更多
关键词 ENGINEERING ERRORS and EFFECTS Analysis(3EA) ENGINEERING error detailed EFFECTIVENESS control risk assessment
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部