Neutral beam injection (NBI) system with two neutral beam injections will be con- structed on the Experimental Advanced Superconducting Tokamak (EAST) in two stages for high power auxiliary plasmas heating and non...Neutral beam injection (NBI) system with two neutral beam injections will be con- structed on the Experimental Advanced Superconducting Tokamak (EAST) in two stages for high power auxiliary plasmas heating and non-inductive current drive. Each NBI can deliver 2-4 MW beam power with 50-80 keV beam energy in 10-100 s pulse length. Each elements of the NBI system are presented in this contribution.展开更多
Neutral beam injection is one of the main plasma heating methods in nuclear fusion devices. In order to support the scientific study of the Experimental Advanced Superconducting Tokamak (EAST), a megawatt-level high...Neutral beam injection is one of the main plasma heating methods in nuclear fusion devices. In order to support the scientific study of the Experimental Advanced Superconducting Tokamak (EAST), a megawatt-level high current ion source is designed and manufactured in the ASIPP, and the progress and preliminary test results will be presented in this paper.展开更多
In order to synchronize the elements of the EAST Neutral Beam Injector (NBI) spatially located in several places, a distributed Timing System (TS) is developed in this paper. The timing system provides a clock ref...In order to synchronize the elements of the EAST Neutral Beam Injector (NBI) spatially located in several places, a distributed Timing System (TS) is developed in this paper. The timing system provides a clock reference for synchronization and an interlock protection of the EAST NBI system. It sends timing signals to field devices, controls the pulse widths of the timing sequences, and provides a sampling clock for the Data Acquisition System (DAS). The timing system also generates analog waveforms to control power supplies and gas supplies according to the operator's configuration. The timing system is developed on a PXI (PCI eXtensions for Instrumentation) platform consisting of a LabVIEW workstation and a timing control terminal. The timing control terminal consists of a timing node and several control interface crates. Two timing nodes are configured in one beam line. Each node is responsible for the timing sequence, analog generation and feedback control for one ion source. The architecture and implementation of the timing system are presented in this paper.展开更多
Neutral beam infection has been recognized as one of the most effective means for plasma heating. According to the research plan of the EAST physics experiment, two sets of neutral beam injectors (4-8 MW, 10-100s) w...Neutral beam infection has been recognized as one of the most effective means for plasma heating. According to the research plan of the EAST physics experiment, two sets of neutral beam injectors (4-8 MW, 10-100s) were built and operated in 2014. We present the development of the EAST neutral beam injector (NBI) and the latest experiment results obtained on the test-stand about operation of ion source, beam extraction, and measurement of key parameters. Those results show that all targets reach or almost reach the design targets. All these lay a solid foundation for the achievement of plasma heating and current drive for EAST in 2014.展开更多
The long-pulse power-supply system equipped for the 4 MW beam-power ion source is comprised of three units at ASIPP(Institute of Plasma Physics, Chinese Academy of Sciences): one for the neutralbeam test stand and ...The long-pulse power-supply system equipped for the 4 MW beam-power ion source is comprised of three units at ASIPP(Institute of Plasma Physics, Chinese Academy of Sciences): one for the neutralbeam test stand and two for the EAST neutral-beam injectors(NBI-1 and NBI-2, respectively). Each power supply system consists of two low voltage and high current DC power supplies for plasma generation of the ion source, and two high voltage and high current DC power supplies for the accelerator grid system. The operation range of the NB power supply is about 80 percent of the design value, which is the safe and stable operation range. At the neutral-beam test stand, a hydrogen ion beam with a beam pulse of 150 s, beam power of 1.5 MW and beam energy of 50 ke V was achieved during the long-pulse testing experiments. The result shows that the power-supply system meets the requirements of the EAST-NBIs fully and lays a basis for achieving plasma heating.展开更多
基金supported by National Natural Science Foundation of China (No. 11075188)the Chinese Academy of Sciences Knowledge Innovation Project: the study of neutral beam steady-state operation of the key technical and physical problems
文摘Neutral beam injection (NBI) system with two neutral beam injections will be con- structed on the Experimental Advanced Superconducting Tokamak (EAST) in two stages for high power auxiliary plasmas heating and non-inductive current drive. Each NBI can deliver 2-4 MW beam power with 50-80 keV beam energy in 10-100 s pulse length. Each elements of the NBI system are presented in this contribution.
基金supported by National Natural Science Foundation of China (Nos.10875146,11075183)the Knowledge Innovation Program of the Chinese Academy of Sciences (study of the physical characteristic of arc power feedback control for the high current ion source)
文摘Neutral beam injection is one of the main plasma heating methods in nuclear fusion devices. In order to support the scientific study of the Experimental Advanced Superconducting Tokamak (EAST), a megawatt-level high current ion source is designed and manufactured in the ASIPP, and the progress and preliminary test results will be presented in this paper.
文摘In order to synchronize the elements of the EAST Neutral Beam Injector (NBI) spatially located in several places, a distributed Timing System (TS) is developed in this paper. The timing system provides a clock reference for synchronization and an interlock protection of the EAST NBI system. It sends timing signals to field devices, controls the pulse widths of the timing sequences, and provides a sampling clock for the Data Acquisition System (DAS). The timing system also generates analog waveforms to control power supplies and gas supplies according to the operator's configuration. The timing system is developed on a PXI (PCI eXtensions for Instrumentation) platform consisting of a LabVIEW workstation and a timing control terminal. The timing control terminal consists of a timing node and several control interface crates. Two timing nodes are configured in one beam line. Each node is responsible for the timing sequence, analog generation and feedback control for one ion source. The architecture and implementation of the timing system are presented in this paper.
基金Supported by the National Magnetic Confinement Fusion Science Program of China under Grant No 2013GB101001
文摘Neutral beam infection has been recognized as one of the most effective means for plasma heating. According to the research plan of the EAST physics experiment, two sets of neutral beam injectors (4-8 MW, 10-100s) were built and operated in 2014. We present the development of the EAST neutral beam injector (NBI) and the latest experiment results obtained on the test-stand about operation of ion source, beam extraction, and measurement of key parameters. Those results show that all targets reach or almost reach the design targets. All these lay a solid foundation for the achievement of plasma heating and current drive for EAST in 2014.
基金supported by the National Magnetic Confinement Fusion Science Program of China(No.2013GB101003)National Natural Science Foundation of China(No.11505225)Foundation of ASIPP(No.DSJJ-15-GC03)
文摘The long-pulse power-supply system equipped for the 4 MW beam-power ion source is comprised of three units at ASIPP(Institute of Plasma Physics, Chinese Academy of Sciences): one for the neutralbeam test stand and two for the EAST neutral-beam injectors(NBI-1 and NBI-2, respectively). Each power supply system consists of two low voltage and high current DC power supplies for plasma generation of the ion source, and two high voltage and high current DC power supplies for the accelerator grid system. The operation range of the NB power supply is about 80 percent of the design value, which is the safe and stable operation range. At the neutral-beam test stand, a hydrogen ion beam with a beam pulse of 150 s, beam power of 1.5 MW and beam energy of 50 ke V was achieved during the long-pulse testing experiments. The result shows that the power-supply system meets the requirements of the EAST-NBIs fully and lays a basis for achieving plasma heating.