期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
The design of double line five step ship lock of Three Gorges Project 被引量:3
1
作者 niu xinqiang tong di song weibang 《Engineering Sciences》 EI 2011年第3期74-81,共8页
The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-sca... The general design and layout of the double-line five-step ship-lock,the water delivery technique for high head ship-lock,the key technical problems of fully lined ship-lock and the monitoring techniques for large-scale miter gates and hoisting equipment under complicated operation conditions of Three Gorges Project (TGP) are introduced.Since the operation of ship-lock in 2003,the operation practice has proved that the design techniques are advanced,rational and reliable.The design and construction of the fully lined ship-lock promotes the development of design theory and practice of ship-lock projects,which makes the construction technology of ship-lock in the world reach a new level. 展开更多
关键词 Three Gorges Project double-line five-step design of ship-lock
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部