期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Dual-resource integrated scheduling method of AGV and machine in intelligent manufacturing job shop 被引量:3
1
作者 YUAN Ming-hai LI Ya-dong +1 位作者 pei feng-que GU Wen-bin 《Journal of Central South University》 SCIE EI CAS CSCD 2021年第8期2423-2435,共13页
In view of the fact that traditional job shop scheduling only considers a single factor, which affects the effect of resource allocation, the dual-resource integrated scheduling problem between AGV and machine in inte... In view of the fact that traditional job shop scheduling only considers a single factor, which affects the effect of resource allocation, the dual-resource integrated scheduling problem between AGV and machine in intelligent manufacturing job shop environment was studied. The dual-resource integrated scheduling model of AGV and machine was established by comprehensively considering constraints of machines, workpieces and AGVs. The bidirectional single path fixed guidance system based on topological map was determined, and the AGV transportation task model was defined. The improved A* path optimization algorithm was used to determine the optimal path, and the path conflict elimination mechanism was described. The improved NSGA-Ⅱ algorithm was used to determine the machining workpiece sequence, and the competition mechanism was introduced to allocate AGV transportation tasks. The proposed model and method were verified by a workshop production example, the results showed that the dual resource integrated scheduling strategy of AGV and machine is effective. 展开更多
关键词 dual resource integrated scheduling improved A* algorithm improved NSGA-Ⅱ algorithm competition mechanism
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部