期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Optimal Portfolio Selection of Wind Power Plants Using a Stochastic Risk-Averse Optimization Model, Considering the Wind Complementarity of the Sites and a Budget Constraint
1
作者 Luiz A. s. Camargo Laís D. Leonel +1 位作者 pedro s. rosa Dorel s. Ramos 《Energy and Power Engineering》 2020年第8期459-476,共18页
This work focuses on the best financial resources allocation to define a wind power plant portfolio, considering a set of feasible sites. To accomplish the problem formulation and solution, the first step was to estab... This work focuses on the best financial resources allocation to define a wind power plant portfolio, considering a set of feasible sites. To accomplish the problem formulation and solution, the first step was to establish a long-term wind series reconstruction methodology for generating scenarios of wind energy, applying it to study five different locations of the Brazilian territory. Secondly, a risk-averse stochastic optimization model was implemented and used to define the optimal wind power plant selection </span><span style="font-family:Verdana;">that</span><span style="font-family:Verdana;"> maximize</span><span style="font-family:Verdana;">s</span><span style="font-family:Verdana;"> the portfolio financial results, considering an investment budget constraint. In a sequence, a case study was developed to illustrate a practical situation of applying the methodology to the portfolio selection problem, considering five wind power plant</span><span style="font-family:Verdana;">s</span><span style="font-family:Verdana;"> options. </span><span style="font-family:Verdana;">The case</span><span style="font-family:Verdana;"> study was supported by the proposed optimization model, using the scenarios of generation created by the reconstruction methodology. The obtained results show the model performance in terms of defining the best financial resources allocation considering the effect of the complementarity between sites, making it feasible to select the optimal set of wind power plants, characterizing a wind plant optimal portfolio that takes into account the budget constraint. The adopted methodology makes it possible to realize that the diversification of the portfolio depends on the investor risk aversion. Although applied to the Brazilian case, this model can be customized to solve a similar problem worldwide. 展开更多
关键词 Wind Power Plant Portfolio Selection Risk Aversion Stochastic Optimiza-tion
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部