CMOS image sensors produced by the existing CMOS manufacturing process usually have difficulty achieving complete charge transfer owing to the introduction of potential barriers or Si/SiO_(2)interface state traps in t...CMOS image sensors produced by the existing CMOS manufacturing process usually have difficulty achieving complete charge transfer owing to the introduction of potential barriers or Si/SiO_(2)interface state traps in the charge transfer path,which reduces the charge transfer efficiency and image quality.Until now,scholars have only considered mechanisms that limit charge transfer from the perspectives of potential barriers and spill back effect under high illumination condition.However,the existing models have thus far ignored the charge transfer limitation due to Si/SiO_(2)interface state traps in the transfer gate channel,particularly under low illumination.Therefore,this paper proposes,for the first time,an analytical model for quantifying the incomplete charge transfer caused by Si/SiO_(2)interface state traps in the transfer gate channel under low illumination.This model can predict the variation rules of the number of untransferred charges and charge transfer efficiency when the trap energy level follows Gaussian distribution,exponential distribution and measured distribution.The model was verified with technology computer-aided design simulations,and the results showed that the simulation results exhibit the consistency with the proposed model.展开更多
In view of the uncertainty in the location selection of logistics distribution center for the fresh agricultural products,the present study established a robust model based on the maximization of principal component s...In view of the uncertainty in the location selection of logistics distribution center for the fresh agricultural products,the present study established a robust model based on the maximization of principal component score taking budget cost parameters as an example.In the process of model solving,the interval form of the uncertain set was used to clarify the constraint conditions,to transform into a certain 0-1 integer linear programming model,so as to solve with the aid of LINGO software.Finally,through studying the location selection of logistics distribution center for fresh agricultural products in the Beijing-Tianjin-Hebei region,it analyzed the application of the robust model and tested the validity of the model.展开更多
基金supported by the National Natural Science Foundation of China(62171172).
文摘CMOS image sensors produced by the existing CMOS manufacturing process usually have difficulty achieving complete charge transfer owing to the introduction of potential barriers or Si/SiO_(2)interface state traps in the charge transfer path,which reduces the charge transfer efficiency and image quality.Until now,scholars have only considered mechanisms that limit charge transfer from the perspectives of potential barriers and spill back effect under high illumination condition.However,the existing models have thus far ignored the charge transfer limitation due to Si/SiO_(2)interface state traps in the transfer gate channel,particularly under low illumination.Therefore,this paper proposes,for the first time,an analytical model for quantifying the incomplete charge transfer caused by Si/SiO_(2)interface state traps in the transfer gate channel under low illumination.This model can predict the variation rules of the number of untransferred charges and charge transfer efficiency when the trap energy level follows Gaussian distribution,exponential distribution and measured distribution.The model was verified with technology computer-aided design simulations,and the results showed that the simulation results exhibit the consistency with the proposed model.
基金Supported by Student Innovation and Entrepreneurship Training Program Project of Hebei Agricultural University(2020102).
文摘In view of the uncertainty in the location selection of logistics distribution center for the fresh agricultural products,the present study established a robust model based on the maximization of principal component score taking budget cost parameters as an example.In the process of model solving,the interval form of the uncertain set was used to clarify the constraint conditions,to transform into a certain 0-1 integer linear programming model,so as to solve with the aid of LINGO software.Finally,through studying the location selection of logistics distribution center for fresh agricultural products in the Beijing-Tianjin-Hebei region,it analyzed the application of the robust model and tested the validity of the model.