期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Buffer Sizing Method for Constructing Stable Schedules with Duration Constraints
1
作者 piotr jaskowski slawomir biruk 《Journal of Civil Engineering and Architecture》 2010年第10期24-30,共7页
The assumption of static and deterministic conditions is common in the practice of construction project planning. However, at the construction phase, projects are subject to uncertainty. This may lead to serious sched... The assumption of static and deterministic conditions is common in the practice of construction project planning. However, at the construction phase, projects are subject to uncertainty. This may lead to serious schedule disruptions and, as a consequence, serious revisions oft.he schedule baseline. The aim of the paper is developing a method for constructing robust project schedules with a proactive procedure. Robust project scheduling allows for constructing stable schedules with time buffers introduced to cope with multiple disruptions during project execution. The method proposed by the authors, based on Monte Carlo simulation technique and mathematical programming for buffer sizing optimization, was applied to scheduling an example project. The results were compared, in terms of schedule stability, to those of the float factor heuristic procedttre. 展开更多
关键词 Construction project scheduling stable solution robust schedule BUFFERING risk management
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部