The construction efficiency and quality of tunnel boring machines(TBMs)is largely determined by the service life of cutting tools,which is the result of contact loads in the crushed zone between cutter ring and rock.I...The construction efficiency and quality of tunnel boring machines(TBMs)is largely determined by the service life of cutting tools,which is the result of contact loads in the crushed zone between cutter ring and rock.In this paper,a series of rock breaking tests were conducted with a 216 mm diameter disc cutter and concrete samples.Based on the superposition principle,the distribution of contact loads between disc cutter and rock were obtained by using the truncated singular value decomposition(TSVD).The results show that both the peak value and the whole numerical distribution of the radial strains on the cutter ring increase with the increase of the penetration.The distribution curves of the contact loads show an approximate parabola going downwards,which indicates contact loads are more concentrated.The front non-loading area with a ratio from 1.8%to 5.4%shows an increasing trend with the increase of penetration.However,the change of rear non-loading area is not obvious.It is believed that the conclusions have guidance for the study of rock breaking mechanism and manufacturing process of the disc cutter.展开更多
The layout of the buckets for tunnel boring machine(TBM)directly affects the muck removal efficiency of cutterhead during excavation.In order to improve the muck removal performance for TBM,the optimal design of bucke...The layout of the buckets for tunnel boring machine(TBM)directly affects the muck removal efficiency of cutterhead during excavation.In order to improve the muck removal performance for TBM,the optimal design of bucket layout was investigated.The whole muck transfer process was simulated by discrete-element method(DEM),including the muck falling,colliding,pilling up,shoveling and transferring into the hopper.The muck model was established based on size distribution analysis of muck samples from the water-supply tunnel project in Jilin Province,China.Then,the influence of the bucket number and the interval angle between buckets on muck removal performance was investigated.The results indicated that,as the number of buckets increased from four to eight,the removed muck increased by 29%and the residual volume decreased by 40.5%,and the process became steadier.Different interval angles between buckets were corresponding to different removed muck irregularly,but the residual muck number increased generally with the angles.The optimal layout of buckets for the cutterhead in this tunnel project was obtained based on the simulation results,and the muck removal performance of the TBM was verified by the actual data in the engineering construction.展开更多
基金Project(51475478)supported by the National Natural Science Foundation of ChinaProject(2013CB035401)supported by the National Basic Research Program of China
文摘The construction efficiency and quality of tunnel boring machines(TBMs)is largely determined by the service life of cutting tools,which is the result of contact loads in the crushed zone between cutter ring and rock.In this paper,a series of rock breaking tests were conducted with a 216 mm diameter disc cutter and concrete samples.Based on the superposition principle,the distribution of contact loads between disc cutter and rock were obtained by using the truncated singular value decomposition(TSVD).The results show that both the peak value and the whole numerical distribution of the radial strains on the cutter ring increase with the increase of the penetration.The distribution curves of the contact loads show an approximate parabola going downwards,which indicates contact loads are more concentrated.The front non-loading area with a ratio from 1.8%to 5.4%shows an increasing trend with the increase of penetration.However,the change of rear non-loading area is not obvious.It is believed that the conclusions have guidance for the study of rock breaking mechanism and manufacturing process of the disc cutter.
基金Project(51475478)supported by the National Natural Science Foundation of ChinaProject(2012AA041801)supported by the National High Technology Research and Development Program of China+1 种基金Project(2014FJ1002)supported by the Science and Technology Major Project of Hunan Province,ChinaProject(2013CB035401)supported by the National Basic Research Program of China。
文摘The layout of the buckets for tunnel boring machine(TBM)directly affects the muck removal efficiency of cutterhead during excavation.In order to improve the muck removal performance for TBM,the optimal design of bucket layout was investigated.The whole muck transfer process was simulated by discrete-element method(DEM),including the muck falling,colliding,pilling up,shoveling and transferring into the hopper.The muck model was established based on size distribution analysis of muck samples from the water-supply tunnel project in Jilin Province,China.Then,the influence of the bucket number and the interval angle between buckets on muck removal performance was investigated.The results indicated that,as the number of buckets increased from four to eight,the removed muck increased by 29%and the residual volume decreased by 40.5%,and the process became steadier.Different interval angles between buckets were corresponding to different removed muck irregularly,but the residual muck number increased generally with the angles.The optimal layout of buckets for the cutterhead in this tunnel project was obtained based on the simulation results,and the muck removal performance of the TBM was verified by the actual data in the engineering construction.