期刊文献+
共找到5篇文章
< 1 >
每页显示 20 50 100
Optimization design of foundation excavation for Xiluodu super-high arch dam in China 被引量:7
1
作者 qixiang fan Shaowu Zhou Ning Yang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第2期120-135,共16页
With better understanding of the quality and physico-mechanical properties of rocks of dam foundation,and the physico-mechanical properties and structure design of arch dam in association with the foundation excavatio... With better understanding of the quality and physico-mechanical properties of rocks of dam foundation,and the physico-mechanical properties and structure design of arch dam in association with the foundation excavation of Xiluodu arch dam,the excavation optimization design was proposed for the foundation surface on the basis of feasibility study.Common analysis and numerical analysis results demonstrated the feasibility of using the weakly weathered rocks III1and III2as the foundation surface of super-high arch dam.In view of changes in the geological conditions at the dam foundation along the riverbed direction,the design of extending foundation surface excavation area and using consolidating grouting and optimizing structure of dam bottom was introduced,allowing for harmonization of the arch dam and foundation.Three-dimensional(3D)geomechanics model test and fi nite element analysis results indicated that the dam body and foundation have good overload stability and high bearing capacity.The monitoring data showed that the behaviors of dam and foundation correspond with the designed patterns in the construction period and the initial operation period. 展开更多
关键词 Super-high arch dam Foundation surface Optimization design Stability analysis
下载PDF
Unloading performances and stabilizing practices for columnar jointed basalt:A case study of Baihetan hydropower station 被引量:4
2
作者 qixiang fan Xiating Feng +2 位作者 Wenlin Weng Yilin fan Quan Jiang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2017年第6期1041-1053,共13页
The columnar jointed rock mass(CJR), composed of polygonal cross-sectional columns cut by several groups of joints in various directions, was exposed during the excavations of the Baihetan hydropower station, China. I... The columnar jointed rock mass(CJR), composed of polygonal cross-sectional columns cut by several groups of joints in various directions, was exposed during the excavations of the Baihetan hydropower station, China. In order to investigate the unloading performances and the stability conditions during excavation of the columns, an experimental field study was performed. Firstly, on-site investigations indicated that the geotechnical problems, including rock relaxation, cracking and collapse, were the most prominent for the CJR Class I that contains intensive joint network and the smallest column sizes.Comprehensive field tests, including deformation measurement by multi-point extensometers, ultrasonic wave testing, borehole television observation and stress monitoring of rock anchors, revealed that the time-dependent relaxation of the CJRs was marked. The practical excavation experiences for the Baihetan columnar jointed rock masses, such as blasting scheme, supporting time of shotcrete and rock bolts, were presented in the excavations of the diversion tunnels. These detailed investigations and practical construction experiences can provide helpful information for similar geotechnical works in jointed rock mass. 展开更多
关键词 Columnar jointed basalt Diversion tunnels Rock unloading In situ test Hydropower station
下载PDF
Monitoring result analyses of high slope of five-step ship lock in the Three Gorges Project 被引量:4
3
作者 qixiang fan Hongbing Zhu Jun Gen 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2015年第2期199-206,共8页
The construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wascommenced in 1994, the excavation of the ship lock was completed by the end of 1999, and the ship lockwas put in operation... The construction of the double-lane five-step ship lock of the Three Gorges Project (TGP) wascommenced in 1994, the excavation of the ship lock was completed by the end of 1999, and the ship lockwas put in operation in June 2003. The side slopes of the ship lock are characterized by great height(170 m), steepness (70 m in height of upright slope), and great length (over 7000 m in total length). Inassociation with the ship lock, the surrounding rocks in slope have a high potential to deform, withwhich the magnitude of deformation is restricted. Monitoring results show that the deformation of thefive-step ship lock high slopes of the TGP primarily occurred in excavation period, and deformationtended to be stable and convergent during operation period, suggesting the allowable ranges of deformation.At present, the slopes and lock chambers are stable, and the ship lock works well under normaloperation condition, enabling the social and economic benefits of the TGP. 2015 Institute of Rock and Soil Mechanics, Chinese Academy of Sciences. Production and hosting byElsevier B.V. All rights reserved. 展开更多
关键词 Three Gorges Project(TGP) Five-step ship lock SLOPE Monitoring analysis
下载PDF
Hot Corrosion Behavior of a Cr-Modified Aluminide Coating on a Ni-Based Superalloy 被引量:5
4
作者 Duoli Wu Sumeng Jiang +2 位作者 qixiang fan Jun Gong Chao Sun 《Acta Metallurgica Sinica(English Letters)》 SCIE EI CAS CSCD 2014年第4期627-634,共8页
A Cr-modified aluminide coating is prepared on a Ni-based superalloy using arc ion plating and subsequent pack cementation aluminizing.Hot corrosion behavior of the Cr-modified aluminide coating exposed to molten Na2S... A Cr-modified aluminide coating is prepared on a Ni-based superalloy using arc ion plating and subsequent pack cementation aluminizing.Hot corrosion behavior of the Cr-modified aluminide coating exposed to molten Na2SO4/K2SO4(3:1) or Na2SO4/NaCl(3:1) salts at 900 °C in static air are evaluated as well as the aluminide coating.The results indicate that compared with the aluminide coating,the anti-corrosion properties of the Cr-modified aluminide coating in the both salts are improved,which should be attributed to the beneficial effect of the Cr in the coating.The corrosion mechanism of the Cr-modified aluminide coating,especially the role of Cr in the mixture salt corrosion,is discussed. 展开更多
关键词 Arc ion plating Pack cementation aluminizing Superalloy Cr-modified aluminide coating Hot corrosion
原文传递
Technology improvements and management innovations in construction of Xiluodu hydropower station on Jinsha River 被引量:1
5
作者 qixiang fan 《Frontiers of Engineering Management》 2017年第2期231-237,共7页
Developer and owner:China Three Gorges Corporation(CTG)Engineering management:China Three Gorges Projects Development Corporation(CTGPC)Designer:Chengdu Engineering Corporation Co.,Ltd.,Power
关键词 super-high arch dam intelligent construction mass concrete temperature control structure behavior control anti-erosion concrete low-heat portland cement large-discharge and high-velocity spillway tunnels large scale underground powerhouse green hydropower station sustainable development Xiluodu hydropower station
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部