期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
德国高速铁路岩溶隧道工程经验和施工方法
1
作者 rudolf pottler 《现代隧道技术》 EI 2004年第z2期189-200,共12页
在德国新高速铁路线Nuremberg至Ingolstadt段的工程中,修建了总长约15 km的若干座隧道,最长的是7 250 m的Irlahüu隧道.该隧道是在喀斯特地质条件下开挖的.当时没想到喀斯特地质现象分布范围如此广泛,迫使业主、设计人员和承包商对... 在德国新高速铁路线Nuremberg至Ingolstadt段的工程中,修建了总长约15 km的若干座隧道,最长的是7 250 m的Irlahüu隧道.该隧道是在喀斯特地质条件下开挖的.当时没想到喀斯特地质现象分布范围如此广泛,迫使业主、设计人员和承包商对该工程采取了一些新对策.他们研制了一些不同的机具来应付现场发生的问题.同时不得不增加了一些现场勘查工作以查清隧道附近的喀斯特现象.为确保该隧道的稳定性和服务能力,还必须找到一种新的确定施工事故概率的新方法.根据德国高速铁路Nuremberg至Ingolstadt段的隧道施工经验,本文将对两种隧道施工方法:钻爆法(或新奥法)和TBM法进行讨论. 展开更多
关键词 高速铁路 铁路隧道 岩溶隧道 设计 施工
下载PDF
High- Speed railway lines in Germany:Experience in Tunnelling in Karstic Geology and Discussion Of Tunnel Driving Methods 被引量:1
2
作者 rudolf pottler 《现代隧道技术》 EI 2004年第z2期201-216,共16页
In the course of Deutsche Bahn's new high - speed railway line between Nuremberg and Ingolstadt, a number of tunnels are being constructed, with a total length of about 15 km. One of the longest tunnel is the 7,25... In the course of Deutsche Bahn's new high - speed railway line between Nuremberg and Ingolstadt, a number of tunnels are being constructed, with a total length of about 15 km. One of the longest tunnel is the 7,250 m long Irlahüll tunnel.The tunnel was driven in karst geology. It was not expected that karst phenomena would be so widespread. This forced client, designer and contractor to take a new approach to the project. Different tools were developed to handle the problems on site. Additional site investigations had to be performed to identify karst phenomena in the vicinity of the tunnel. For validating the stability and serviceability of the tunnel, a new way of defining the probability of failure of the construction had to be found. Based on the experience of the tunnel driving at the high - speed railway line in Germany between Nuremberg and Ingolstadt, two different methods of tunnelling are discussed: Drill and blast ( New Austrian Tunnelling Method: NATM) and the use of tunnel boring machines (TBM). 展开更多
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部