Using the method of construction, with the help of inequalities, we research the Muntz rational approximation of two kinds of special function classes, and give the corresponding estimates of approximation rates of th...Using the method of construction, with the help of inequalities, we research the Muntz rational approximation of two kinds of special function classes, and give the corresponding estimates of approximation rates of these classes under widely con- ditions. Because of the Orlicz Spaces is bigger than continuous function space and the Lp space, so the results of this paper has a certain expansion significance.展开更多
Seismic hazard analyses are mainly performed using either deterministic or probabilistic methods.However,there are still some defects in these statistical model-based approaches for regional seismic risk assessment af...Seismic hazard analyses are mainly performed using either deterministic or probabilistic methods.However,there are still some defects in these statistical model-based approaches for regional seismic risk assessment affected by the near-field of large earthquakes.Therefore,we established a deterministic seismic hazard analysis method that can characterize the entire process of ground motion propagation based on stochastic finite-fault simulation,and we chose the site of the Xiluodu dam to demonstrate the method.This method can characterize earthquake source properties more realistically than other methods and consider factors such as the path and site attenuation of seismic waves.It also has high computational efficiency and is convenient for engineering applications.We first analyzed the complexity of seismogenic structures in the Xiluodu dam site area,and then an evaluation system for ground motion parameters that considers various uncertainties is constructed based on a stochastic finitefault simulation.Finally,we assessed the seismic hazard of the dam site area comprehensively.The proposed method was able to take into account the complexity of the seismogenic structures affecting the dam site and provide multi-level parameter evaluation results corresponding to different risk levels.These results can be used to construct a dam safety assessment system of an earthquake in advance that provides technical support for rapidly and accurately assessing the post-earthquake damage state of a dam,thus determining the influence of an earthquake on dam safety and mitigating the risk of potential secondary disasters.展开更多
The distribution of water resources in China exhibits significant spatial-temporal heterogeneity.Thus,constructing large dams and reservoirs is indispensable for rationally deploying water resources to ensure China’s...The distribution of water resources in China exhibits significant spatial-temporal heterogeneity.Thus,constructing large dams and reservoirs is indispensable for rationally deploying water resources to ensure China’s water security and prevent water-related disasters.Such infrastructure is also fundamental for harnessing renewable hydropower resources to reduce carbon dioxide emissions and achieve the carbon-neutral goal.展开更多
基金supported by the National Science Foundation of China(No.11161033)Inner Mongolia Normal University Talent Project Foundation(No.RCPY-2-2012-K-036)
文摘Using the method of construction, with the help of inequalities, we research the Muntz rational approximation of two kinds of special function classes, and give the corresponding estimates of approximation rates of these classes under widely con- ditions. Because of the Orlicz Spaces is bigger than continuous function space and the Lp space, so the results of this paper has a certain expansion significance.
基金supported by the Beijing Natural Science Foundation(No.8212018)the National Key R&D Program of China(No.2017YFC0404901)the China Three Gorges Corporation Research Project(XLD/2115)。
文摘Seismic hazard analyses are mainly performed using either deterministic or probabilistic methods.However,there are still some defects in these statistical model-based approaches for regional seismic risk assessment affected by the near-field of large earthquakes.Therefore,we established a deterministic seismic hazard analysis method that can characterize the entire process of ground motion propagation based on stochastic finite-fault simulation,and we chose the site of the Xiluodu dam to demonstrate the method.This method can characterize earthquake source properties more realistically than other methods and consider factors such as the path and site attenuation of seismic waves.It also has high computational efficiency and is convenient for engineering applications.We first analyzed the complexity of seismogenic structures in the Xiluodu dam site area,and then an evaluation system for ground motion parameters that considers various uncertainties is constructed based on a stochastic finitefault simulation.Finally,we assessed the seismic hazard of the dam site area comprehensively.The proposed method was able to take into account the complexity of the seismogenic structures affecting the dam site and provide multi-level parameter evaluation results corresponding to different risk levels.These results can be used to construct a dam safety assessment system of an earthquake in advance that provides technical support for rapidly and accurately assessing the post-earthquake damage state of a dam,thus determining the influence of an earthquake on dam safety and mitigating the risk of potential secondary disasters.
基金supported by the National Key R&D Program of China (No. 2017YFC0404901)
文摘The distribution of water resources in China exhibits significant spatial-temporal heterogeneity.Thus,constructing large dams and reservoirs is indispensable for rationally deploying water resources to ensure China’s water security and prevent water-related disasters.Such infrastructure is also fundamental for harnessing renewable hydropower resources to reduce carbon dioxide emissions and achieve the carbon-neutral goal.