High-speed landslide is a catastrophic geological disaster in the mountainous area of southwest China. To predict the movement process of landslide reactivation in Chenjiaba town, Beichuan county, Sichuan province, Ch...High-speed landslide is a catastrophic geological disaster in the mountainous area of southwest China. To predict the movement process of landslide reactivation in Chenjiaba town, Beichuan county, Sichuan province, China, we simulated the movement process of two landslide failures in Chenjiaba via rapid mass movement simulation and unmanned aerial vehicle images(UAV), and obtained the movement characteristic parameters of the landslides. According to a back analysis, the most remarkable fitting rheological parameters were friction coefficient(μ=0.18) and turbulence(). The parameter of landslide pressure was applied as the zoning index of landslide hazard to obtain the influence zone and hazard zoning map of the Chenjiaba landslide. Results show that the Duba River was blocked quickly with a landslide accumulation at the maximum height of 44.14 mwhen the Chenjiaba deposits lost stability. The hazard zoning map indicated that the landslide hazard degree is positively correlated with the slope.This landslide assessment is a quantitative hazard assessment method based on a landslide movement process and is suitable for high-speed landslide. Such method can provide a scientific basis for urban construction and planning in the landslide hazard area to avoid hazards effectively.展开更多
A Ms 8.0 large earthquake occurred in Sichuan,China on May 12,2008(hereafter called 5.12 Earthquake),and then a large debris flow happened in the quake-hit Qingping Township of Mianzhu county on August 13,2008(here...A Ms 8.0 large earthquake occurred in Sichuan,China on May 12,2008(hereafter called 5.12 Earthquake),and then a large debris flow happened in the quake-hit Qingping Township of Mianzhu county on August 13,2008(hereafter called 8.13 Debris Flow).The influence of two disasters on the changes in land use were analyzed by using highresolution aerial photos and satellite remote sensing images taken before and after the 5.12 Earthquake and 8.13 Debris Flow,the selection of suitable construction land were studied by learning experiences and lessons from the selection of resettlement areas and through field surveys and with land use transfer model and analytical model in combination with RS and GIS.The results showed that the influence of the 5.12 Earthquake on ecological environment was far greater than that of the 8.13 Debris Flow;there were more salient conflicts between population and land after the earthquake.Sites for post-disaster reconstruction should not be in disaster-prone areas or in gully-facing areas.Suitable land for settlement construction in I-1~I-5 low-hazard zones is optimal settlement areas for post-disaster reconstruction.展开更多
基金the support of Institute of Exploration Technology, Chinese Academy of Geological Sciences in helping us conduct the field surveysupported by the Sichuan Youth Science and Technology Foundation (2017JQ0051)+1 种基金the National Natural Science Foundation of China (41371185 and 41401195)the Social Science Research Foundation of Ministry of Education (Engineering and Technology Training Research) (15JDGC019)
文摘High-speed landslide is a catastrophic geological disaster in the mountainous area of southwest China. To predict the movement process of landslide reactivation in Chenjiaba town, Beichuan county, Sichuan province, China, we simulated the movement process of two landslide failures in Chenjiaba via rapid mass movement simulation and unmanned aerial vehicle images(UAV), and obtained the movement characteristic parameters of the landslides. According to a back analysis, the most remarkable fitting rheological parameters were friction coefficient(μ=0.18) and turbulence(). The parameter of landslide pressure was applied as the zoning index of landslide hazard to obtain the influence zone and hazard zoning map of the Chenjiaba landslide. Results show that the Duba River was blocked quickly with a landslide accumulation at the maximum height of 44.14 mwhen the Chenjiaba deposits lost stability. The hazard zoning map indicated that the landslide hazard degree is positively correlated with the slope.This landslide assessment is a quantitative hazard assessment method based on a landslide movement process and is suitable for high-speed landslide. Such method can provide a scientific basis for urban construction and planning in the landslide hazard area to avoid hazards effectively.
基金supported by the Directional Project (Grant No. KZCX2-EW-317)Western Light Project (Grant No. 09R2340340) of Chinese Academy of SciencesNational Natural Science Funds (Grant No. 41071350,41101552)
文摘A Ms 8.0 large earthquake occurred in Sichuan,China on May 12,2008(hereafter called 5.12 Earthquake),and then a large debris flow happened in the quake-hit Qingping Township of Mianzhu county on August 13,2008(hereafter called 8.13 Debris Flow).The influence of two disasters on the changes in land use were analyzed by using highresolution aerial photos and satellite remote sensing images taken before and after the 5.12 Earthquake and 8.13 Debris Flow,the selection of suitable construction land were studied by learning experiences and lessons from the selection of resettlement areas and through field surveys and with land use transfer model and analytical model in combination with RS and GIS.The results showed that the influence of the 5.12 Earthquake on ecological environment was far greater than that of the 8.13 Debris Flow;there were more salient conflicts between population and land after the earthquake.Sites for post-disaster reconstruction should not be in disaster-prone areas or in gully-facing areas.Suitable land for settlement construction in I-1~I-5 low-hazard zones is optimal settlement areas for post-disaster reconstruction.