While hydropower is generally considered a clean energy source, it is important to recognize that their waste can still contribute to greenhouse gas emissions (GHG). The purpose of this study is to assess the carbon f...While hydropower is generally considered a clean energy source, it is important to recognize that their waste can still contribute to greenhouse gas emissions (GHG). The purpose of this study is to assess the carbon footprint associated with the waste sector throughout the operational phase of the Nam Theun 2 hydropower plant in Laos. Understanding the environmental impact of the waste sector is crucial for ensuring the plant’s sustainability. This study utilizes the theoretical estimation method recommended in the 2019 Refinement to the 2006 IPCC Guidelines for National Greenhouse Gas Inventories, as well as the Requirements for Specification with guidance at the organization level for quantification and reporting of GHG emissions and removals. We emphasize the significance of implementing sustainable waste management practices to reduce GHG emissions and minimize the environmental impact of hydropower operations. By conducting a comprehensive analysis, this paper also provides insights into the environmental implications of waste management in hydropower plants and identifies strategies to mitigate the carbon footprint in the waste sector. The findings contribute to a better understanding of the environmental sustainability of hydropower plants and provide valuable guidance for policymakers, energy producers, and environmental practitioners involved in hydropower plant design and operation.展开更多
The application of floating photovoltaics (PVs) in hydropower plants has gained increasing interest in forming hybrid energy systems (HESs). It enhances the operational benefits of the existing hydropower plants. Howe...The application of floating photovoltaics (PVs) in hydropower plants has gained increasing interest in forming hybrid energy systems (HESs). It enhances the operational benefits of the existing hydropower plants. However, uncertainties of PV and load powers can present great challenges to scheduling HESs. To address these uncertainties, this paper proposes a novel two-stage optimization approach that combines distributionally robust chance-constrained (DRCC) and robust-stochastic optimization (RSO) approaches to minimize the operational cost of an HES. In the first stage, the scheduling of each device is obtained via the DRCC approach considering the PV power and load forecast errors. The second stage provides a robust near real time energy dispatch according to different scenarios of PV power and load demand. The solution of the RSO problem is obtained via a novel double-layer particle swarm optimization algorithm. The performance of the proposed approach is compared to the traditional stochastic and robust-stochastic approaches. Simulation results de- monstrate the superiority of the proposed two-stage approach and its solution method in terms of operational cost and execution time.展开更多
文摘While hydropower is generally considered a clean energy source, it is important to recognize that their waste can still contribute to greenhouse gas emissions (GHG). The purpose of this study is to assess the carbon footprint associated with the waste sector throughout the operational phase of the Nam Theun 2 hydropower plant in Laos. Understanding the environmental impact of the waste sector is crucial for ensuring the plant’s sustainability. This study utilizes the theoretical estimation method recommended in the 2019 Refinement to the 2006 IPCC Guidelines for National Greenhouse Gas Inventories, as well as the Requirements for Specification with guidance at the organization level for quantification and reporting of GHG emissions and removals. We emphasize the significance of implementing sustainable waste management practices to reduce GHG emissions and minimize the environmental impact of hydropower operations. By conducting a comprehensive analysis, this paper also provides insights into the environmental implications of waste management in hydropower plants and identifies strategies to mitigate the carbon footprint in the waste sector. The findings contribute to a better understanding of the environmental sustainability of hydropower plants and provide valuable guidance for policymakers, energy producers, and environmental practitioners involved in hydropower plant design and operation.
文摘The application of floating photovoltaics (PVs) in hydropower plants has gained increasing interest in forming hybrid energy systems (HESs). It enhances the operational benefits of the existing hydropower plants. However, uncertainties of PV and load powers can present great challenges to scheduling HESs. To address these uncertainties, this paper proposes a novel two-stage optimization approach that combines distributionally robust chance-constrained (DRCC) and robust-stochastic optimization (RSO) approaches to minimize the operational cost of an HES. In the first stage, the scheduling of each device is obtained via the DRCC approach considering the PV power and load forecast errors. The second stage provides a robust near real time energy dispatch according to different scenarios of PV power and load demand. The solution of the RSO problem is obtained via a novel double-layer particle swarm optimization algorithm. The performance of the proposed approach is compared to the traditional stochastic and robust-stochastic approaches. Simulation results de- monstrate the superiority of the proposed two-stage approach and its solution method in terms of operational cost and execution time.