In wastewater treatment plants (WWTPs), a secondary settler acts as a clarifier, sludge thickener, and sludge storage tank during peak flows and therefore plays an important role in the performance of the activated ...In wastewater treatment plants (WWTPs), a secondary settler acts as a clarifier, sludge thickener, and sludge storage tank during peak flows and therefore plays an important role in the performance of the activated sludge process. Sludge thickening occurs in the lower portions of secondary clarifiers during their operation. In this study, by detecting the hindered zone from the complete thickening process of activated sludge, a simple model for the sludge thickening velocity, us = aXb ( a =0.9925SSFI3.5, b = - 3.5411n( SS VI3.5 ) +12.973), describing the potential and performance of activated sludge thickening in the hindered zone was developed. However, sludge thickening in the compression zone was not studied because sludge in the compression zone showed limited thickening. This empirical model was developed using batch settling data obtained from four WWTPs and validated using measured data from a fifth WWTP to better study sludge thickening. To explore different sludge settling and thickening mechanisms, the curves of sludge thickening and sludge settling were compared. Finally, it was found that several factors including temperature, stirring, initial depth, and polymer conditioning can lead to highly concentrated return sludge and biomass in a biologic reactor.展开更多
Chinese authorities and the public have largely ignored sewer networks; however, various problems are emerging nationwide with the increase construction of new sewers. The current state of sewer network construction, ...Chinese authorities and the public have largely ignored sewer networks; however, various problems are emerging nationwide with the increase construction of new sewers. The current state of sewer network construction, administration, and maintenance in China is comprehensively reviewed in this study. Serving about 444 million people, 511,200 km of sewer lines are located in urban areas. In 2014,$7 billion was invested in sewer network construction. However, both the sewer pervasion rate and the per capita sewer length were significantly lower than those in developed countries. Sewer administrative agencies in local governments are uncoordinated. Laws, regulations, and standards are incomplete, and some practices are unscientific. The future situation of sewer maintenance is extremely grim because sewer corrosion control measures have not been launched. Moreover, inspection and rehabilitation chiefly rely on traditional approaches. In contrast, the overall market share of innovative technologies is very low owing to high cost, funds shortage, and technical limitations. Approaches such-as liner inversion cured-in-place pipe, pull-in ultraviolet light cured liners, and spiral wound lining are applied mostly in economically developed regions. According to status and problem analyses, China's top priority will be to conduct aggressive maintenance work in sewer networks in the future. New technical route, corrosion control - periodic visualized inspection - trenchless rehabilitation, could be the best option for future sewer maintenance in China. Instmctions and opportunities for applying this technical route are discussed in detail in this study. Finally.additional factors in the development of sewer networks in China are suggested.展开更多
文摘In wastewater treatment plants (WWTPs), a secondary settler acts as a clarifier, sludge thickener, and sludge storage tank during peak flows and therefore plays an important role in the performance of the activated sludge process. Sludge thickening occurs in the lower portions of secondary clarifiers during their operation. In this study, by detecting the hindered zone from the complete thickening process of activated sludge, a simple model for the sludge thickening velocity, us = aXb ( a =0.9925SSFI3.5, b = - 3.5411n( SS VI3.5 ) +12.973), describing the potential and performance of activated sludge thickening in the hindered zone was developed. However, sludge thickening in the compression zone was not studied because sludge in the compression zone showed limited thickening. This empirical model was developed using batch settling data obtained from four WWTPs and validated using measured data from a fifth WWTP to better study sludge thickening. To explore different sludge settling and thickening mechanisms, the curves of sludge thickening and sludge settling were compared. Finally, it was found that several factors including temperature, stirring, initial depth, and polymer conditioning can lead to highly concentrated return sludge and biomass in a biologic reactor.
文摘Chinese authorities and the public have largely ignored sewer networks; however, various problems are emerging nationwide with the increase construction of new sewers. The current state of sewer network construction, administration, and maintenance in China is comprehensively reviewed in this study. Serving about 444 million people, 511,200 km of sewer lines are located in urban areas. In 2014,$7 billion was invested in sewer network construction. However, both the sewer pervasion rate and the per capita sewer length were significantly lower than those in developed countries. Sewer administrative agencies in local governments are uncoordinated. Laws, regulations, and standards are incomplete, and some practices are unscientific. The future situation of sewer maintenance is extremely grim because sewer corrosion control measures have not been launched. Moreover, inspection and rehabilitation chiefly rely on traditional approaches. In contrast, the overall market share of innovative technologies is very low owing to high cost, funds shortage, and technical limitations. Approaches such-as liner inversion cured-in-place pipe, pull-in ultraviolet light cured liners, and spiral wound lining are applied mostly in economically developed regions. According to status and problem analyses, China's top priority will be to conduct aggressive maintenance work in sewer networks in the future. New technical route, corrosion control - periodic visualized inspection - trenchless rehabilitation, could be the best option for future sewer maintenance in China. Instmctions and opportunities for applying this technical route are discussed in detail in this study. Finally.additional factors in the development of sewer networks in China are suggested.