期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
High Efficiency to Develop in Cainan Oilfield
1
作者 Zhao Lichun sun chuansheng and chen gengwen(xinjiang petroleum administration bureau) 《China Oil & Gas》 CAS 1994年第4期40-43,共4页
There are two amazing constructions estab-lished in the desert:one is a designing,installa-tion,and production of the central treating station which have operated within one year,the other is 114 km second-class stand... There are two amazing constructions estab-lished in the desert:one is a designing,installa-tion,and production of the central treating station which have operated within one year,the other is 114 km second-class standard highway and 52 km third-class highway pass through。Therefore.wa-ter,electricity and road are all in access. 展开更多
关键词 OILFIELD MANAGEMENT Effect Surface CONSTRUCTION AUTOMATION PLANNING PROJECT
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部