期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Forced Compressed Air Cooling System for a 300 MW Steam Turbine in Waigaoqiao Power Plant
1
作者 sun shixiong hua hong shanghai waigaoqiao thermal power plant 《Electricity》 1996年第4期22-24,共3页
The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storag... The 300 MW steam turbine installed in Waigaoqiao Power Plant with combined HPIP cylinders of double casing structure is a product of the Shanghai Turbine Works utilizing licensed technology. It has a large heat storage capacity and good thermal insulation, so the metal temperature of first stage of HP cylinder (FSMTI) may reach 400-450℃ after shut down and it takes 7-8 days to cool to 150℃ by natural cooling, Now with a forced cooling system the cooling time may be reduced to 40 hours, so that the turbine may be opened for repair work in about 5-6 days. The cooling system for #2 unit and test procedure are briefly described below. 展开更多
关键词 der Forced Compressed Air Cooling System for a 300 MW Steam Turbine in Waigaoqiao Power Plant ITI 认认 TEST 司卜 月卜 HP IP 一基
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部