In this study, wind characteristics and wind power potential are analyzed for three meteorological stations in the Sudanese zone of Chad for the period of 35 years (from 1975 to 2010). Assessment of the wind power pot...In this study, wind characteristics and wind power potential are analyzed for three meteorological stations in the Sudanese zone of Chad for the period of 35 years (from 1975 to 2010). Assessment of the wind power potential was carried out using the two parameters of Weibull distribution. Results of the study shows that the average annual wind speeds at 10 m above ground for Moundou, Pala and Sarh are 2.69, 2.33 and 1.91 m/s, respectively. The mean annual value of the Weibull shape parameter k and scale parameter c range from 2.376 to 3.255 and 2.099 to 3.007, respectively. The maximum annual power density of 204.85 W/m2 was obtained at Moundou. Results of this study further shows that the selected locations are not suitable for large-scale wind energy production at 10 m altitude. However, by extrapolation, assessment of wind speed at 67 m altitude combines with wind turbine Vestas 2 MW/80 that adapts to the Sudanese local conditions, and the wind power potential can be exploited for water pumping, heating and production of electricity.展开更多
Preventive Maintenance Programme consists of actions that improve the condition of system elements for performance optimization and aversion of unintended system failure or collapse. It involves inspection, servicing,...Preventive Maintenance Programme consists of actions that improve the condition of system elements for performance optimization and aversion of unintended system failure or collapse. It involves inspection, servicing, repairing or replacing physical components of machineries, plant and equipment by following the prescribed schedule. It is commonly agreed nowadays that preventive maintenance programme can be very successful in improving equipment reliability while minimizing maintenance related costs. The availability of a complex system, such as steam turbine power plant is strongly associated with its parts reliability and maintenance policy. That policy not only has influence on the parts’ repair time but also on the parts’ reliability affecting the system integrity, degradation and availability. The objective of this paper is to study the effects of Preventive Maintenance Programme (PMP) implementation on the performance of the Egbin 1320 MW thermal power plant in Nigeria. This paper considers the reliability and availability of the 6 x 220 MW steam turbine units installed in the power station. The reliability and availability of the turbines are computed based on a five-year failure database. The availability analysis of available data from 2005 to 2009 shows different results for each unit and variation in availability for different year: availability of unit1 varies between 59.11 to 91.76%;unit 2, 64.02 to 94.53%;unit 3, 28.79 to 91.57%;unit 4, 80.31 to 92.76% and unit 5, 73.38 to 87.76%. Unit 6 was out of service for the past 2 to 3 years. This indicates differences in their systems installation maintenance and operation.展开更多
文摘In this study, wind characteristics and wind power potential are analyzed for three meteorological stations in the Sudanese zone of Chad for the period of 35 years (from 1975 to 2010). Assessment of the wind power potential was carried out using the two parameters of Weibull distribution. Results of the study shows that the average annual wind speeds at 10 m above ground for Moundou, Pala and Sarh are 2.69, 2.33 and 1.91 m/s, respectively. The mean annual value of the Weibull shape parameter k and scale parameter c range from 2.376 to 3.255 and 2.099 to 3.007, respectively. The maximum annual power density of 204.85 W/m2 was obtained at Moundou. Results of this study further shows that the selected locations are not suitable for large-scale wind energy production at 10 m altitude. However, by extrapolation, assessment of wind speed at 67 m altitude combines with wind turbine Vestas 2 MW/80 that adapts to the Sudanese local conditions, and the wind power potential can be exploited for water pumping, heating and production of electricity.
文摘Preventive Maintenance Programme consists of actions that improve the condition of system elements for performance optimization and aversion of unintended system failure or collapse. It involves inspection, servicing, repairing or replacing physical components of machineries, plant and equipment by following the prescribed schedule. It is commonly agreed nowadays that preventive maintenance programme can be very successful in improving equipment reliability while minimizing maintenance related costs. The availability of a complex system, such as steam turbine power plant is strongly associated with its parts reliability and maintenance policy. That policy not only has influence on the parts’ repair time but also on the parts’ reliability affecting the system integrity, degradation and availability. The objective of this paper is to study the effects of Preventive Maintenance Programme (PMP) implementation on the performance of the Egbin 1320 MW thermal power plant in Nigeria. This paper considers the reliability and availability of the 6 x 220 MW steam turbine units installed in the power station. The reliability and availability of the turbines are computed based on a five-year failure database. The availability analysis of available data from 2005 to 2009 shows different results for each unit and variation in availability for different year: availability of unit1 varies between 59.11 to 91.76%;unit 2, 64.02 to 94.53%;unit 3, 28.79 to 91.57%;unit 4, 80.31 to 92.76% and unit 5, 73.38 to 87.76%. Unit 6 was out of service for the past 2 to 3 years. This indicates differences in their systems installation maintenance and operation.