Research on Cost Overrun Risk of Construction Phase of Vietnam Highway International Contracting Project
1
作者 Hong Anh Vu Jianqiong Wang +2 位作者 Lianxing Min sy hung mai Hong Phong Nguyen 《Engineering(科研)》 2016年第3期86-98,共13页
Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the c... Recently, the highway construction projects increase rapidly in Vietnam and most of them are international contracting projects. It results serious negative influence on the local government and enterprises that the common cost overrun of projects, and the risk factors of it is different in the different countries, different stages and projects types. So in this paper, we generate an evaluation index system of highway construction projects cost overrun risk in Vietnam in the perspective of different project participants, and also evaluate the effects of these factors in method of regression analysis. The empirical results confirmed 7 main factors that have aggravated cost overrun risk in construction stages, e.g. survey and design scheme risk. In final, the corresponding suggestions are proposed to reduce the project cost overrun risk. 展开更多
关键词 HIGHWAY CONSTRUCTION Cost Overrun Risk Management VIETNAM
下载PDF
Prediction of Flash Flood Susceptibility of Hilly Terrain Using Deep Neural Network:A Case Study of Vietnam 被引量:2
2
作者 Huong Thi Thanh Ngo Nguyen Duc Dam +7 位作者 Quynh-Anh Thi Bui Nadhir Al-Ansari Romulus Costache Hang Ha Quynh Duy Bui sy hung mai Indra Prakash Binh Thai Pham 《Computer Modeling in Engineering & Sciences》 SCIE EI 2023年第6期2219-2241,共23页
Flash floods are one of the most dangerous natural disasters,especially in hilly terrain,causing loss of life,property,and infrastructures and sudden disruption of traffic.These types of floods are mostly associated w... Flash floods are one of the most dangerous natural disasters,especially in hilly terrain,causing loss of life,property,and infrastructures and sudden disruption of traffic.These types of floods are mostly associated with landslides and erosion of roads within a short time.Most of Vietnamis hilly and mountainous;thus,the problem due to flash flood is severe and requires systematic studies to correctly identify flood susceptible areas for proper landuse planning and traffic management.In this study,three Machine Learning(ML)methods namely Deep Learning Neural Network(DL),Correlation-based FeatureWeighted Naive Bayes(CFWNB),and Adaboost(AB-CFWNB)were used for the development of flash flood susceptibility maps for hilly road section(115 km length)of National Highway(NH)-6 inHoa Binh province,Vietnam.In the proposedmodels,88 past flash flood events were used together with 14 flash floods affecting topographical and geo-environmental factors.The performance of themodels was evaluated using standard statisticalmeasures including Receiver Operating Characteristic(ROC)Curve,Area Under Curve(AUC)and Root Mean Square Error(RMSE).The results revealed that all the models performed well(AUC>0.80)in predicting flash flood susceptibility zones,but the performance of the DL model is the best(AUC:0.972,RMSE:0.352).Therefore,the DL model can be applied to develop an accurate flash flood susceptibility map of hilly terrain which can be used for proper planning and designing of the highways and other infrastructure facilities besides landuse management of the area. 展开更多
关键词 Flash flood deep learning neural network(DL) machine learning(ML) receiver operating characteristic curve(ROC) VIETNAM
下载PDF
Research on Subcontractor Risk of EPC Hydropower Project in Vietnam 被引量:1
3
作者 Dinh Bui sy hung mai Huu Hai Vu 《World Journal of Engineering and Technology》 2019年第1期54-67,共14页
Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects.?The EPC general contractors in Vietnam have been coped w... Engineering, procurement and construction (EPC) contracts are becoming the most popular form to undertake construction works on large-scale hydropower projects.?The EPC general contractors in Vietnam have been coped with lots of difficulties during the construction phase of hydropower projects, resulting in significant schedule delays and cost overrun. One of the reasons is poor Subcontractors capacity.?In order to overcome above, the current study attempts?to research on identification and control Subcontractors risks of delay process of EPC hydropower project in Vietnam.?Through summarizing international research achievements of previous researches relating on EPC hydropower projects combining with analysis characteristics of developing construction of EPC hydropower projects in Vietnam, the current study pointed out all kinds of subcontractor risk of delay process of EPC hydropower project in Vietnam;?a questionnaire with 18 risk elements was designed and then delivered to experts in EPC hydropower project management area. Based on the risk model, 11 main risk elements were identified which can be categorized into 3 groups.?Lastly, the current study proposed suggestions to reduce or avoid risks as well as approach to control risks.?Furthermore, the findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environment to Vietnam to get their EPC construction project completed on schedule, thus ensuring the benefits to the government, the investor, the contractor, and the parties involved. 展开更多
关键词 EPC HYDROPOWER Project RISK Analysis and Evaluation RISK Control Prevent RISKS
下载PDF
Research on Quality Risk of EPC Hydropower Projects in Vietnam 被引量:1
4
作者 sy hung mai Jianqiong Wang 《World Journal of Engineering and Technology》 2017年第2期299-308,共10页
Engineering, procurement and construction (EPC) contracts are on the way to become the most usual form of contracting applied by the private sector to undertake construction works on large scale Hydropower projects. I... Engineering, procurement and construction (EPC) contracts are on the way to become the most usual form of contracting applied by the private sector to undertake construction works on large scale Hydropower projects. If EPC contract management is not implemented and controlled properly. Quality is the first important factor for any contractors who involve in the hydropower project execution. The purpose of this study is to investigate and evaluate risks causing not good quality of EPC hydropower projects in Vietnam. In addition, the study also provided the recommendations for project practitioners to mitigate the impacts of those identified risks. The findings of this study can be a good managerial reference for project management teams who are working in other countries that have similar economic and investment environments to Vietnam to get their EPC construction project completed on quality, thus will ensuring the benefits to the government, the investors, the contractors, and the parties involved. 展开更多
关键词 EPC HYDROPOWER Project RISK Analysis and Evaluation RISK Control PREVENT RISKS
下载PDF