Due to pollution in second water supply system (SWSS),nine renovation alternative plans were proposed and com-prehensive evaluations of different plan based on Analytical Hierarchy Process (AHP) were presented in this...Due to pollution in second water supply system (SWSS),nine renovation alternative plans were proposed and com-prehensive evaluations of different plan based on Analytical Hierarchy Process (AHP) were presented in this paper. Comparisons of advantages and disadvantages among the plans of SWSS renovations provided solid foundation for selecting the most appro-priate plan for engineering projects. In addition,a mathematical model of the optimal combination of renovation plans has been set up and software Lingo was used to solve the model. As a case study,the paper analyzed 15 buildings in Tianjin City. After simulation of the SWSS renovation system,an optimal scheme was obtained,the result of which indicates that 10 out of those 15 buildings need be renovated in priority. The renovation plans selected for each building are the ones ranked higher in the com-prehensive analysis. The analysis revealed that the optimal scheme,compared with two other randomly calculated ones,increased the percentage of service population by 19.6% and 13.6% respectively,which significantly improved social and economical benefits.展开更多
Objective: To evaluate the efficacy and safety of Chinese medicine(CM) plus Western medicine(WM) in the treatment of pediatric patients with severe hand, foot and mouth disease(HFMD) by conducting a prospective, contr...Objective: To evaluate the efficacy and safety of Chinese medicine(CM) plus Western medicine(WM) in the treatment of pediatric patients with severe hand, foot and mouth disease(HFMD) by conducting a prospective, controlled, and randomized trial. Methods: A total of 451 pediatric patients with severe HFMD were randomly assigned to receive WM therapy alone(224 cases, WM therapy group) or CM [Reduning Injection(热毒宁注射液) or Xiyanping Injection(喜炎平注射液)] plus WM therapy(227 cases, CM plus WM therapy group) for 7–10 days, according to a web-based randomization system. The primary outcome was fever clearance time, which was presented as temperature decreased half-life time. The secondary outcomes included the rate of rash/herpes disappearance within 120 h, as well as the rate for cough, runny nose, lethargy and weakness, agitation or irritability, and vomiting clearance within 120 h. The drug-related adverse events were also recorded. Results: The temperature decreased half-life time was 40.4 h in the WM therapy group, significantly longer than 27.2 h in the CM plus WM therapy group(P<0.01). Moreover, the rate for rash/herpes disappearance within 120 h was 43.6%(99/227) in the CM plus WM therapy group, significantly higher than 29.5%(66/224) in the WM therapy group(P<0.01). In addition, the rate for cough, lethargy and weakness, agitation or irritability disappearance within 120 h was 32.6%(74/227) in the CM plus WM therapy group, significantly higher than 19.2%(43/224) in the WM therapy group(P<0.01). No drug-related adverse events were observed during the course of the study. Conclusions: The combined CM and WM therapy achieved a better therapeutic efficacy in treating severe HFMD than the WM therapy alone. Reduning or Xiyanping Injections may become an important complementary therapy to WM for relieving the symptoms of severe HFMD.展开更多
In this article, based on river quality simulation and system optimization, a water quality model was established for scenic river after rainfall discharge in flood season, with the target of making water pollutants m...In this article, based on river quality simulation and system optimization, a water quality model was established for scenic river after rainfall discharge in flood season, with the target of making water pollutants meet the standard in priority and saving expenditure on pollution control. With the principle of reducing sewage from combined sewage pumping station and heavily polluted initial rainwater, a mathematical multiobjective planning model was constructed for rain sewage pollution control in flood season, and one scenic river in a northern city was taken for simulation example. The results show that: the optimization result meets the requirements of planning, among which, sewage reduction from the combined pumping station accounts for 17.38% in the total reduction of rain sewage, and the reduction in the heavily polluted rain water accounts for 77.24% in the total reduction of rainwater pumping station. The planning scheme can provide theoretical basis for pollution control of scenic river in flood season, and for rational reconstruction and layout of outfalls along two banks of the river.展开更多
基金Project (No.033113111) supported by Tianjin Science Association Key Project,China
文摘Due to pollution in second water supply system (SWSS),nine renovation alternative plans were proposed and com-prehensive evaluations of different plan based on Analytical Hierarchy Process (AHP) were presented in this paper. Comparisons of advantages and disadvantages among the plans of SWSS renovations provided solid foundation for selecting the most appro-priate plan for engineering projects. In addition,a mathematical model of the optimal combination of renovation plans has been set up and software Lingo was used to solve the model. As a case study,the paper analyzed 15 buildings in Tianjin City. After simulation of the SWSS renovation system,an optimal scheme was obtained,the result of which indicates that 10 out of those 15 buildings need be renovated in priority. The renovation plans selected for each building are the ones ranked higher in the com-prehensive analysis. The analysis revealed that the optimal scheme,compared with two other randomly calculated ones,increased the percentage of service population by 19.6% and 13.6% respectively,which significantly improved social and economical benefits.
基金Supported by the Research Project of State Administration of Traditional Chinese Medicine,China(No.200907001-3)
文摘Objective: To evaluate the efficacy and safety of Chinese medicine(CM) plus Western medicine(WM) in the treatment of pediatric patients with severe hand, foot and mouth disease(HFMD) by conducting a prospective, controlled, and randomized trial. Methods: A total of 451 pediatric patients with severe HFMD were randomly assigned to receive WM therapy alone(224 cases, WM therapy group) or CM [Reduning Injection(热毒宁注射液) or Xiyanping Injection(喜炎平注射液)] plus WM therapy(227 cases, CM plus WM therapy group) for 7–10 days, according to a web-based randomization system. The primary outcome was fever clearance time, which was presented as temperature decreased half-life time. The secondary outcomes included the rate of rash/herpes disappearance within 120 h, as well as the rate for cough, runny nose, lethargy and weakness, agitation or irritability, and vomiting clearance within 120 h. The drug-related adverse events were also recorded. Results: The temperature decreased half-life time was 40.4 h in the WM therapy group, significantly longer than 27.2 h in the CM plus WM therapy group(P<0.01). Moreover, the rate for rash/herpes disappearance within 120 h was 43.6%(99/227) in the CM plus WM therapy group, significantly higher than 29.5%(66/224) in the WM therapy group(P<0.01). In addition, the rate for cough, lethargy and weakness, agitation or irritability disappearance within 120 h was 32.6%(74/227) in the CM plus WM therapy group, significantly higher than 19.2%(43/224) in the WM therapy group(P<0.01). No drug-related adverse events were observed during the course of the study. Conclusions: The combined CM and WM therapy achieved a better therapeutic efficacy in treating severe HFMD than the WM therapy alone. Reduning or Xiyanping Injections may become an important complementary therapy to WM for relieving the symptoms of severe HFMD.
基金Project supported by the National Natural Science Foundation of China (Grant No. 50178046)the Science and Technology Innovation Special Foundation of Tianjin (GrantNo.06FZZDSH00900).
文摘In this article, based on river quality simulation and system optimization, a water quality model was established for scenic river after rainfall discharge in flood season, with the target of making water pollutants meet the standard in priority and saving expenditure on pollution control. With the principle of reducing sewage from combined sewage pumping station and heavily polluted initial rainwater, a mathematical multiobjective planning model was constructed for rain sewage pollution control in flood season, and one scenic river in a northern city was taken for simulation example. The results show that: the optimization result meets the requirements of planning, among which, sewage reduction from the combined pumping station accounts for 17.38% in the total reduction of rain sewage, and the reduction in the heavily polluted rain water accounts for 77.24% in the total reduction of rainwater pumping station. The planning scheme can provide theoretical basis for pollution control of scenic river in flood season, and for rational reconstruction and layout of outfalls along two banks of the river.