期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Subsea Maintenance Service Delivery:Mapping Factors Influencing Scheduled Service Duration
1
作者 Efosa Emmanue tore markeset 《International Journal of Automation and computing》 EI 2010年第2期167-172,共6页
The oil and gas (O&G) industry on the Norwegian continental shelf (NCS) leads the world in terms of the number of subsea O&G installations. Ensuring the dependability of these assets is critical. Non-intrusive... The oil and gas (O&G) industry on the Norwegian continental shelf (NCS) leads the world in terms of the number of subsea O&G installations. Ensuring the dependability of these assets is critical. Non-intrusive inspection, maintenance and repair (IMR) services are therefore needed to reduce risks. These services are planned and executed using a mono-hull offshore vessel complete with remotely operated vehicles (ROVs), a module handling system and an active heave compensated crane. Vessel time is shared between competing jobs, using a prioritized forward-looking schedule. Extension in planned job duration may have an impact on O&G production, service costs and health, safety, and environmental (HSE) risks. This paper maps factors influencing the job schedule efficiency. The influence factors are identified through reviews of literature as well as interviews with experts in one of the large IMR subsea service providers active on the Norwegian Continental Shelf. The findings show that the most obvious factors are weather disruption and water depth. Other factors include job complexity, job uncertainty, IMR equipment availability, as well as the mix of job complexity. 展开更多
关键词 维修服务 影响因素 期限 预定 测绘 交付 水下 天然气
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部