期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Early construction cost and time risk assessment and evaluation of large-scale underground cavern construction projects in Singapore
1
作者 varun maruvanchery Shao Zhe Tiong Lee Kong Robert 《Underground Space》 SCIE EI 2020年第1期53-70,共18页
The applicability of the Decision Aids for Tunneling(DAT)as an early construction cost and time predicting tool for large-scale underground cavern construction projects is investigated in this study.For this purpose,t... The applicability of the Decision Aids for Tunneling(DAT)as an early construction cost and time predicting tool for large-scale underground cavern construction projects is investigated in this study.For this purpose,three large-scale underground cavern construction projects in Singapore are presented using the proposed framework.The data from Project A,which is already completed,are used to validate the prediction outcomes.The results show that the proposed workflow can well estimate the construction cost and time at the 95%confidence level.The DAT simulation results of the other two projects,which are in the early planning stages,are compared with Project A to assess the accuracy of the predicted cost and time.The results show that the proposed workflow with the DAT as a predictor is a valuable tool in estimating construction cost and time for large-scale underground cavern projects,particularly for feasibility studies. 展开更多
关键词 Cavern construction Decision Aids for Tunneling Partial face excavation Construction cost-time prediction Risk assessment Feasibility study
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部