期刊文献+
共找到2篇文章
< 1 >
每页显示 20 50 100
Phase Identification of Low-voltage Distribution Network Based on Stepwise Regression Method
1
作者 Yingqi Yi Siliang Liu +3 位作者 Yongjun Zhang Ying Xue wenyang deng Qinhao Li 《Journal of Modern Power Systems and Clean Energy》 SCIE EI CSCD 2023年第4期1224-1234,共11页
Accurate information for consumer phase connectivity in a low-voltage distribution network(LVDN)is critical for the management of line losses and the quality of customer service.The wide application of smart meters pr... Accurate information for consumer phase connectivity in a low-voltage distribution network(LVDN)is critical for the management of line losses and the quality of customer service.The wide application of smart meters provides the data basis for the phase identification of LVDN.However,the measurement errors,poor communication,and data distortion have significant impacts on the accuracy of phase identification.In order to solve this problem,this paper proposes a phase identification method of LVDN based on stepwise regression(SR)method.First,a multiple linear regression model based on the principle of energy conservation is established for phase identification of LVDN.Second,the SR algorithm is used to identify the consumer phase connectivity.Third,by defining a significance correction factor,the results from the SR algorithm are updated to improve the accuracy of phase identification.Finally,an LVDN test system with 63 consumers is constructed based on the real load.The simulation results prove that the identification accuracy achieved by the proposed method is higher than other phase identification methods under the influence of various errors. 展开更多
关键词 Phase identification low-voltage distribution network(LVDN) stepwise regression smart meter data-driven method
原文传递
Optimal Day-ahead Scheduling of Islanded Microgrid Considering Risk-based Reserve Decision 被引量:2
2
作者 Zehuai Liu Siliang Liu +3 位作者 Qinhao Li Yongjun Zhang wenyang deng Lai Zhou 《Journal of Modern Power Systems and Clean Energy》 SCIE EI CSCD 2021年第5期1149-1160,共12页
Due to the lack of support from the main grid,the intermittency of renewable energy sources(RESs)and the fluctuation of load will derive uncertainties to the operation of islanded microgrids(IMGs).It is crucial to all... Due to the lack of support from the main grid,the intermittency of renewable energy sources(RESs)and the fluctuation of load will derive uncertainties to the operation of islanded microgrids(IMGs).It is crucial to allocate appropriate reserve capacity for the economic and reliable operation of IMGs.With the high penetration of RESs,it faces both economic and environmental challenges if we only use spinning reserve for reserve support.To solve these problems,a multi-type reserve scheme for IMGs is proposed according to different operation characteristics of generation,load,and storage.The operation risk due to reserve shortage is modeled by the conditional value-at-risk(CVaR)method.The correlation of input variables is considered for the forecasting error modeling of RES and load,and Latin hypercube sampling(LHS)is adopted to generate the random scenarios of the forecasting error,so as to avoid the dimension disaster caused by conventional large-scale scenario sampling approaches.Furthermore,an optimal day-ahead scheduling model of joint energy and reserve considering riskbased reserve decision is established to coordinate the security and economy of the operation of IMGs.Finally,the comparison of numerical results of different schemes demonstrate the rationality and effectiveness of the proposed scheme and model. 展开更多
关键词 Day-ahead scheduling risk-based reserve decision conditional value-at-risk(CVaR) renewable energy source(RES) islanded microgrids
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部