In the view of staff shortages and the huge inventory of products in the current market, we put forward a personnel scheduling model in the target of closing to the delivery date considering the parallelism. Then we d...In the view of staff shortages and the huge inventory of products in the current market, we put forward a personnel scheduling model in the target of closing to the delivery date considering the parallelism. Then we designed a scheduling algorithm based on genetic algorithm and proposed a flexible parallel decoding method which take full use of the personal capacity. Case study results indicate that the flexible personnel scheduling considering the order-shop scheduling, machine automatic capabilities and personnel flexible in the target of closing to the delivery date optimize the allocation of human resources, then maximize the efficiency.展开更多
In flexible job-shop batch scheduling problem, the optimal lot-size of different process is not always the same because of different processing time and set-up time. Even for the same process of the same workpiece, th...In flexible job-shop batch scheduling problem, the optimal lot-size of different process is not always the same because of different processing time and set-up time. Even for the same process of the same workpiece, the choice of machine also affects the optimal lot-size. In addition, different choices of lot-size between the constrained processes will impact the manufacture efficiency. Considering that each process has its own appropriate lot-size, we put forward the concept of scheduling with lot-splitting based on process and set up the scheduling model of lot-splitting to critical path process as the core. The model could update the set of batch process and machine selection strategy dynamically to determine processing route and arrange proper lot-size for different processes, to achieve the purpose of optimizing the makespan and reducing the processing batches effectively. The experiment results show that, comparing with lot-splitting scheduling scheme based on workpiece, this model optimizes the makespan and improves the utilization efficiency of the machine. It also greatly decreases the machined batches (42%) and reduces the complexity of shop scheduling production management.展开更多
The construction of high-filled loess project has some engineering and technical challenges, such as excavation of earth and backfilling of earth are both large, complex construction environment, variety of influence ...The construction of high-filled loess project has some engineering and technical challenges, such as excavation of earth and backfilling of earth are both large, complex construction environment, variety of influence factors. According to this situation, this paper presents a dynamic 3D visualization method for high-filled project based on volume rendering. Through comparative analysis and visual analysis, realized at different times of the Loess fill internal detection data visualization and analysis presented. The results show that this visualization method can directly and accurately display the construction process, help decision makers master construction information and process.展开更多
基金Supported by Anhui Provincial Natural Science Foundation (1308085MF102)Fundamental Research Funds for the Central Universities(2012HGBZ0195)
文摘In the view of staff shortages and the huge inventory of products in the current market, we put forward a personnel scheduling model in the target of closing to the delivery date considering the parallelism. Then we designed a scheduling algorithm based on genetic algorithm and proposed a flexible parallel decoding method which take full use of the personal capacity. Case study results indicate that the flexible personnel scheduling considering the order-shop scheduling, machine automatic capabilities and personnel flexible in the target of closing to the delivery date optimize the allocation of human resources, then maximize the efficiency.
基金Supported by National Key Technology R&D Program(No.2013BAJ06B)
文摘In flexible job-shop batch scheduling problem, the optimal lot-size of different process is not always the same because of different processing time and set-up time. Even for the same process of the same workpiece, the choice of machine also affects the optimal lot-size. In addition, different choices of lot-size between the constrained processes will impact the manufacture efficiency. Considering that each process has its own appropriate lot-size, we put forward the concept of scheduling with lot-splitting based on process and set up the scheduling model of lot-splitting to critical path process as the core. The model could update the set of batch process and machine selection strategy dynamically to determine processing route and arrange proper lot-size for different processes, to achieve the purpose of optimizing the makespan and reducing the processing batches effectively. The experiment results show that, comparing with lot-splitting scheduling scheme based on workpiece, this model optimizes the makespan and improves the utilization efficiency of the machine. It also greatly decreases the machined batches (42%) and reduces the complexity of shop scheduling production management.
基金Supported by Science and Technology Project of Anhui Province(No.1401b042009)the National Key Technology R&D Program(No.2013BAJ06B)
文摘The construction of high-filled loess project has some engineering and technical challenges, such as excavation of earth and backfilling of earth are both large, complex construction environment, variety of influence factors. According to this situation, this paper presents a dynamic 3D visualization method for high-filled project based on volume rendering. Through comparative analysis and visual analysis, realized at different times of the Loess fill internal detection data visualization and analysis presented. The results show that this visualization method can directly and accurately display the construction process, help decision makers master construction information and process.