A V/Ce conversion coating was deposited in the surface of AZ31B magnesium alloy in a solution containing vanadate and cerium nitrate.The coating composition and morphology were examined.The conversion coating appears ...A V/Ce conversion coating was deposited in the surface of AZ31B magnesium alloy in a solution containing vanadate and cerium nitrate.The coating composition and morphology were examined.The conversion coating appears to consist of a thin and cracked coating with a scattering of spherical particles.The corrosion behavior of the substrate and conversion coating was studied by potentiodynamic polarization and electrochemical impedance spectroscopy (EIS).Compared with AZ31B magnesium alloy,the corrosion current density of the conversion coating is decreased by two orders of magnitude.The total impedance of the V/Ce conversion coating rise to 1.6×10^(3)Ω·cm^(2)in contrast with2.2×10^(2)Ω·cm^(2)of the bare AZ31B.In addition,the electrical conductivity of the coating was assessed by conductivity meter and Mott-Schottky measurement.The results reveal a high dependence of the conductivity of the coating on the semiconductor properties of the phase compositions.展开更多
Centralized delivery has become the main operation mode under the scaled development of wind power.Transmission channels are usually the guarantee of out-delivered wind power for large-scale wind base.The configuratio...Centralized delivery has become the main operation mode under the scaled development of wind power.Transmission channels are usually the guarantee of out-delivered wind power for large-scale wind base.The configuration of transmission capacity,which has the features of low utilization and poor economy,is hardly matching correctly due to the volatility and low energy density of wind.The usage of energy storage can mitigate wind power fluctuations and reduce the requirement of out-delivery transmission capacity,but facing the issue of energy storage cost recovery.Therefore,it is necessary to optimize the allocation of energy storage while considering the problem of wind power transmission.This paper studies the joint optimization of large-scale wind power transmission capacity and energy storage,reveals the mechanism of energy storage in order to reduce the power fluctuation of wind power base and slow down the demand of transmission.Then,analyze the multi-functional cost-sharing mode of energy storage,improve the efficiency of energy storage cost recovery.Constructs the coordination optimization configuration model to deal with the problem of large-scale wind power transmission capacity and energy storage,and realizes the transmission capacity optimization coordination and optimization with energy storage.The proposed method is verified by a wind base located in Northeast China.展开更多
基金financially supported by the National Key Research and Development Program of China (Nos. 2016YFB0301105 and 2017YFB0702100)。
文摘A V/Ce conversion coating was deposited in the surface of AZ31B magnesium alloy in a solution containing vanadate and cerium nitrate.The coating composition and morphology were examined.The conversion coating appears to consist of a thin and cracked coating with a scattering of spherical particles.The corrosion behavior of the substrate and conversion coating was studied by potentiodynamic polarization and electrochemical impedance spectroscopy (EIS).Compared with AZ31B magnesium alloy,the corrosion current density of the conversion coating is decreased by two orders of magnitude.The total impedance of the V/Ce conversion coating rise to 1.6×10^(3)Ω·cm^(2)in contrast with2.2×10^(2)Ω·cm^(2)of the bare AZ31B.In addition,the electrical conductivity of the coating was assessed by conductivity meter and Mott-Schottky measurement.The results reveal a high dependence of the conductivity of the coating on the semiconductor properties of the phase compositions.
基金supported by the National Key Research and Development Program(2016YFB0900100)。
文摘Centralized delivery has become the main operation mode under the scaled development of wind power.Transmission channels are usually the guarantee of out-delivered wind power for large-scale wind base.The configuration of transmission capacity,which has the features of low utilization and poor economy,is hardly matching correctly due to the volatility and low energy density of wind.The usage of energy storage can mitigate wind power fluctuations and reduce the requirement of out-delivery transmission capacity,but facing the issue of energy storage cost recovery.Therefore,it is necessary to optimize the allocation of energy storage while considering the problem of wind power transmission.This paper studies the joint optimization of large-scale wind power transmission capacity and energy storage,reveals the mechanism of energy storage in order to reduce the power fluctuation of wind power base and slow down the demand of transmission.Then,analyze the multi-functional cost-sharing mode of energy storage,improve the efficiency of energy storage cost recovery.Constructs the coordination optimization configuration model to deal with the problem of large-scale wind power transmission capacity and energy storage,and realizes the transmission capacity optimization coordination and optimization with energy storage.The proposed method is verified by a wind base located in Northeast China.