期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Numerical Simulation of Independent Advance of Ore Breaking in the Non-pillar Sublevel Caving Method 被引量:21
1
作者 ZHOU Chuan-bo YAO ying-kang +3 位作者 GUO Liao-wu yin xiao-peng FAN Xiao-feng SHANG ying 《Journal of China University of Mining and Technology》 EI 2007年第2期295-300,共6页
The mechanism of stress generation and propagation by detonation loading in five separate independent ad-vance of ore breaking patterns is discussed in the paper. An elastic numerical model was developed using AN-SYS/... The mechanism of stress generation and propagation by detonation loading in five separate independent ad-vance of ore breaking patterns is discussed in the paper. An elastic numerical model was developed using AN-SYS/LS-DYNA 3D Nonlinear Dynamic Finite Element Software. In this package ANSYS is the preprocessor and LS-DYNA is the postprocessor. Numerical models in the paper to actual were 1:10 and the element mesh was dissected in scanning mode utilizing the symmetry characteristics of the numerical model. Five different advance rates were stud-ied. Parameters,such as the time required to maximum stress,the action time of the available stress,the maximum ve-locity of the nodes,the stress penetration time,the magnitude of the stress peak and the time duration for high stress were numerically simulated. The 2.2 m advance appeared optimum from an analysis of the simulation results. The re-sults from numerical simulation have been validated by tests with physical models. 展开更多
关键词 数字模拟 无立柱支撑崩落开采法 矿石阻断 独立前进 模型
下载PDF
Optimization on cut-hole of mining tunnel excavation 被引量:7
2
作者 ZHOU Chuan-bo WANG peng +1 位作者 LEI Yong-jian yin xiao-peng 《Mining Science and Technology》 EI CAS 2009年第1期70-73,共4页
The efficiency of excavation a mining tunnel is definitely linked with modes of cut-holes. According to experience and methods of engineering analogy, the double-wedge cut, the 9-hole cut and the single spiral cut wer... The efficiency of excavation a mining tunnel is definitely linked with modes of cut-holes. According to experience and methods of engineering analogy, the double-wedge cut, the 9-hole cut and the single spiral cut were determined originally by considering the production conditions and blasting environment of the mining tunnels of the-74 m horizontal in the Da-ye iron mine. Based on acquired modes of cut-holes, the effect of the cut was studied, on the one hand, by a numerical simulation method with the aid of LS-DYNA3D, a nonlinear dynamic finite element program; on the other hand, a spot experiment was carried out in the mining tunnels. Both the numerical simulation and the spot experiment demonstrated and agreed that a single spiral cut provides the optimum excavation effect. 展开更多
关键词 巷道采矿 钻孔掏槽 数值模拟 开采技术
下载PDF
数字化设计联合3D打印技术在下颌骨成釉细胞瘤术后骨缺损修复的应用 被引量:11
3
作者 克热木·阿巴司 王成刚 +3 位作者 尹小朋 方昌 帕热克江·帕塔尔 龚忠诚 《临床口腔医学杂志》 2020年第4期211-214,共4页
目的:探讨数字化设计联合3D打印模型用于下颌骨成釉细胞瘤术后骨缺损修复的治疗效果。方法:收集新疆医科大学附属口腔医院2015年1月~2019年1月接诊的30例实行下颌骨成釉细胞瘤手术切除并行腓骨瓣修复骨缺损的患者为研究对象,其中包括数... 目的:探讨数字化设计联合3D打印模型用于下颌骨成釉细胞瘤术后骨缺损修复的治疗效果。方法:收集新疆医科大学附属口腔医院2015年1月~2019年1月接诊的30例实行下颌骨成釉细胞瘤手术切除并行腓骨瓣修复骨缺损的患者为研究对象,其中包括数字化设计联合3D打印组(n=14)和传统组(n=16)。对比两种手术方法的手术效果、患者满意度等情况。结果:数字化设计联合3D打印组患者手术时间,术中出血及住院天数较传统手术组明显减少。术后半年评估患者外貌满意度,发音满意度及上下颌骨关系,数字化设计联合3D打印组均优于传统手术组患者。结论:数字化设计联合3D打印技术辅助下进行成釉细胞瘤术后骨缺损修复,不仅提高了手术的可预测性,而且减少手术时间、术中出血量及患者住院天数,同时增加了患者满意度,值得临床推广。 展开更多
关键词 成釉细胞瘤 3D打印模型 数字化设计 颌骨缺损
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部