Cold-rolled thin strip steel of high flatness quality undergoes multistage deformation during tension leveling. Thus, the parameters of set-up and manipulating are more difficult. With the aid of FE code MSC. MARC, th...Cold-rolled thin strip steel of high flatness quality undergoes multistage deformation during tension leveling. Thus, the parameters of set-up and manipulating are more difficult. With the aid of FE code MSC. MARC, the tension leveling process of thin strip steel was numerically simulated. Concentrating on the influence of the roll intermeshes in 2# anti-cambering on the distribution and magnitude of residual stresses in leveled strip steel, several experiments were clone with the tension leveler based on the results from the simulation. It was found from the simulation that the magnitude of longitudinal residual stresses in the cross-section of the leveled strip steel regularly presents obvious interdependence with the roll intermeshes in 2# anti-cambering. In addition, there is a steady zone as the longitudinal residual stresses of the surface layers in leveled strip steel vary with the roll intermeshes of 2# anticambering, which is of importance in the manipulation of tension levelers. It was also found that the distribution of strains and stresses across the width of strip steel is uneven during leveling or after removing the tension loaded upon the strip, from which it was found that 3D simulation could not be replaced by 2D analysis because 2D analysis in this case cannot represent the physical behavior of strip steel deformation during tension leveling.展开更多
为了解决CPE顶管机组轧制薄壁无缝管实际生产中出现的管壁拉凹问题,基于某钢管公司?114 mm CPE顶管机组的装备和工艺条件,借助于有限元分析软件Simufact,对42CrMo4钢管典型规格?111 mm×4.35 mm顶管过程的辊模力、各机架轧件出口壁...为了解决CPE顶管机组轧制薄壁无缝管实际生产中出现的管壁拉凹问题,基于某钢管公司?114 mm CPE顶管机组的装备和工艺条件,借助于有限元分析软件Simufact,对42CrMo4钢管典型规格?111 mm×4.35 mm顶管过程的辊模力、各机架轧件出口壁厚、应力应变及相对滑动速度进行了分析。结果表明,顶管过程中,减壁量较大的机架之间存在张力作用,机架减壁量越大,轧件在辊缝处壁厚减薄量越大;轧件在辊缝处所受到的轴向应力均为拉应力,在靠近轧件头部一段距离内轧件所受到的轴向拉应力较大,发生壁厚拉凹的倾向性增大。机架过大的减壁量和减壁率引起的轧件沿孔型宽度方向的严重不均匀变形、机架间大的张力及芯棒与轧件间过大的速度差引起的芯棒拽入力是顶管过程管壁拉凹缺陷产生的主要原因。展开更多
基金Item Sponsored by Korea Research Foundation (KRF-2004-005-D00111)
文摘Cold-rolled thin strip steel of high flatness quality undergoes multistage deformation during tension leveling. Thus, the parameters of set-up and manipulating are more difficult. With the aid of FE code MSC. MARC, the tension leveling process of thin strip steel was numerically simulated. Concentrating on the influence of the roll intermeshes in 2# anti-cambering on the distribution and magnitude of residual stresses in leveled strip steel, several experiments were clone with the tension leveler based on the results from the simulation. It was found from the simulation that the magnitude of longitudinal residual stresses in the cross-section of the leveled strip steel regularly presents obvious interdependence with the roll intermeshes in 2# anti-cambering. In addition, there is a steady zone as the longitudinal residual stresses of the surface layers in leveled strip steel vary with the roll intermeshes of 2# anticambering, which is of importance in the manipulation of tension levelers. It was also found that the distribution of strains and stresses across the width of strip steel is uneven during leveling or after removing the tension loaded upon the strip, from which it was found that 3D simulation could not be replaced by 2D analysis because 2D analysis in this case cannot represent the physical behavior of strip steel deformation during tension leveling.
文摘为了解决CPE顶管机组轧制薄壁无缝管实际生产中出现的管壁拉凹问题,基于某钢管公司?114 mm CPE顶管机组的装备和工艺条件,借助于有限元分析软件Simufact,对42CrMo4钢管典型规格?111 mm×4.35 mm顶管过程的辊模力、各机架轧件出口壁厚、应力应变及相对滑动速度进行了分析。结果表明,顶管过程中,减壁量较大的机架之间存在张力作用,机架减壁量越大,轧件在辊缝处壁厚减薄量越大;轧件在辊缝处所受到的轴向应力均为拉应力,在靠近轧件头部一段距离内轧件所受到的轴向拉应力较大,发生壁厚拉凹的倾向性增大。机架过大的减壁量和减壁率引起的轧件沿孔型宽度方向的严重不均匀变形、机架间大的张力及芯棒与轧件间过大的速度差引起的芯棒拽入力是顶管过程管壁拉凹缺陷产生的主要原因。