期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Determination of rock mass integrity coefficient using a non-invasive geophysical approach 被引量:1
1
作者 Muhammad Hasan yanjun shang +2 位作者 Xuetao Yi Peng Shao Meng He 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2023年第6期1426-1440,共15页
Determination of rock mechanical parameters is the most important step in rock mass quality evaluation and has significant impacts on geotechnical engineering practice.Rock mass integrity coefficient(KV)is one of the ... Determination of rock mechanical parameters is the most important step in rock mass quality evaluation and has significant impacts on geotechnical engineering practice.Rock mass integrity coefficient(KV)is one of the most efficient parameters,which is conventionally determined from boreholes.Such approaches,however,are time-consuming and expensive,offer low data coverage of point measurements,require heavy equipment,and are hardly conducted in steep topographic sites.Hence,borehole approaches cannot assess the subsurface thoroughly for rock mass quality evaluation.Alternatively,use of geophysical methods is non-invasive,rapid and economical.The proposed geophysical approach makes useful empirical correlation between geophysical and geotechnical parameters.We evaluated the rock mass quality via integration between KV measured from the limited boreholes and inverted resistivity obtained from electrical resistivity tomography(ERT).The borehole-ERT correlation provided KV along various geophysical profiles for more detailed 2D/3D(two-/three-dimensional)mapping of rock mass quality.The subsurface was thoroughly evaluated for rock masses with different engineering qualities,including highly weathered rock,semi-weathered rock,and fresh rock.Furthermore,ERT was integrated with induced polarization(IP)to resolve the uncertainty caused by water/clay content.Our results show that the proposed method,compared with the conventional approaches,can reduce the ambiguities caused by inadequate data,and give more accurate insights into the subsurface for rock mass quality evaluation. 展开更多
关键词 Geotechnical engineering Rock mass integrity coefficient Rock mechanical parameters Geophysical parameters Electrical resistivity tomography(ERT) Induced polarization(IP)
下载PDF
From the new Austrian tunneling method to the geoengineering condition evaluation and dynamic controlling method 被引量:1
2
作者 yanjun shang Kun Li +1 位作者 Wantong He Chunbo Sheng 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2014年第4期366-372,共7页
The new Austrian tunneling method (NATM) is widely applied in design and construction of underground engineering projects. When the type and distribution of unfavorable geological bodies (UGBs) associated with the... The new Austrian tunneling method (NATM) is widely applied in design and construction of underground engineering projects. When the type and distribution of unfavorable geological bodies (UGBs) associated with their influences on geoengineering are complicated or unfortunately are overlooked, we should pay more attentions to internal features of rocks grades IV and V (even in local but mostly controlling zones). With increasing attentions to the characteristics, mechanism and influences of engineering construction-triggered geohazards, it is crucial to fully understand the disturbance of these geohazards on project construction. A reasonable determination method in construction procedure, i.e. the shape of working face, the type of engineering support and the choice of feasible procedure, should be considered in order to mitigate the construction-triggered geohazards. Due to their high sensitivity to groundwater and in-situ stress, various UGBs exhibit hysteretic nature and failure modes. To give a complete understanding on the internal causes, the emphasis on advanced comprehensive geological forecasting and overall reinforcement treatment is therefore of more practical significance. Compre- hensive evaluation of influential factors, identification of UGB, and measures of discontinuity dynamic controlling comprises the geoengineering condition evaluation and dynamic controlling method. In a case of a cut slope, the variations of UGBs and the impacts of key environmental factors are presented, where more severe construction-triggered geohazards emerged in construction stage than those predicted in design and field investigation stages. As a result, the weight ratios of different influential factors with respect to field investigation, design and construction are obtained. 展开更多
关键词 Unfavorable geological body (UGB)Multi-factor interaction matrix Discontinuity dynamic controlling (DDC)Cut slope Geoengineering condition evaluation and dynamic controlling (GEDC) method
下载PDF
Identification of weathered troughs in granites for tunneling at Daya Bay reactor-neutrino experiment site 被引量:1
3
作者 yanjun shang Yongyue Shi +3 位作者 Weijun Jin Daming Lin Fengbo Wu Wei Zhang 《Journal of Rock Mechanics and Geotechnical Engineering》 2012年第2期177-182,共6页
Weathered troughs are frequently encountered in granites. They can cause problems to tunneling in the rocks and have to be properly addressed. The structures or spatial shapes of weathered troughs were seldom clarifie... Weathered troughs are frequently encountered in granites. They can cause problems to tunneling in the rocks and have to be properly addressed. The structures or spatial shapes of weathered troughs were seldom clarified in the past. In this paper, four weathered troughs are identified by means of geophysical exploration, core drilling, logging, and in-situ stress measurement at Daya Bay reactor-neutrino experiment site in Shenzhen, China. The weathered troughs are exposed on the ground or partially covered by grass and soils, which will threaten the safety of horizontal tunneling at a shallow depth. High electrical resistivity (HER) method is adopted for its feasibility and practicality, in combination with field geological observation, ultrasonic televiewer in boreholes and in-situ stress measurement. By comparing the HER values of completely decomposed to fresh rocks, it is indicated that the HER values of weathered troughs in natural state are 0.4-100 D.m, and the in-situ stress is abnormally lower than those at upper and lower layers. Field investigations show that the depths of the four weathered troughs are 30-182 m, with bottom elevation over 10 m. The volume of each weathered trough is mostly over lx l 0^6 m3 in inverted conic form. The weathered troughs often occur in various kinds of landforms, such as ridges, gullies or gently dipping dish-like depression areas. Faults and boundaries of different granitic plutons as well as joints govern the formation, locations and strikes of these troughs under development. 展开更多
关键词 GRANITE Daya Bay reactor-neutrino experiment TUNNELING weathered trough
下载PDF
Back analysis of long-term stability of a 92 m span ancient quarrying cavern
4
作者 yanjun shang Lihui Li +3 位作者 Wantong He Luqing Zhang Tianbin Li Zhifa Yang 《Journal of Rock Mechanics and Geotechnical Engineering》 SCIE CSCD 2017年第2期350-363,共14页
Long-term stability of large-span caverns is a challenging issue for design and construction of underground rock engineering.The Heidong cavern group consisting of 21 caverns was constructed about 1400 years ago for q... Long-term stability of large-span caverns is a challenging issue for design and construction of underground rock engineering.The Heidong cavern group consisting of 21 caverns was constructed about 1400 years ago for quarrying in massive Cretaceous tuff.The cavern No.5 of the Heidong cavern group is characterized by an unsupported span up to 92 m,with the overburden thickness of only 3-25 m.To analyze its long-term stability,a detailed investigation was conducted to obtain its geometry and rock mass characteristics,and to monitor surrounding rock displacements.Based on field survey and laboratory tests,numerical simulations were performed using the finite difference code FLAC;.The analysis results revealed that for the long-term stability of the cavern No.5,some major factors should be carefully considered,such as cavern excavation method in hard massive rocks,site investigation using trial pits,tools like short iron chisel and hammer for manual excavation,geometric dome roof,and waste rocks within abutment or on the floor.The highlights of the technologies obtained from this large-scale ancient underground project can provide reference for other similar project excavations in practice. 展开更多
关键词 Cretaceous tuff Heidong quarry Largest span Long-term stability Manual excavation
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部