期刊文献+
共找到4篇文章
< 1 >
每页显示 20 50 100
Discussion on Power Market Mode of Central China
1
作者 He Zhaocheng ye qing(译) 《Electricity》 2007年第2期31-33,41,共4页
Central China power system is one of the large regional power grids carrying out power market demonstrative project.Because of lacking power market experience,a lot of problems need to be thoroughly discussed.
关键词 中国 能源模式 电力网 电力市场
下载PDF
“3+1”—To Create a New Power Pattern in Northeast China
2
作者 Yu Laifu Fan Wei ye qing(译) 《Electricity》 2007年第2期29-30,共2页
Northeast region was an old industrial base of China,but after three economic flourishing areas newly arose in Zhujiang River Delta,Changjiang River Delta and Beijing-Tianjin-Tangshan Region,this old industrial base h... Northeast region was an old industrial base of China,but after three economic flourishing areas newly arose in Zhujiang River Delta,Changjiang River Delta and Beijing-Tianjin-Tangshan Region,this old industrial base has been economically stagnated,paced haltingly. 展开更多
关键词 中国 能源模式 经济性 能源传输
下载PDF
Annoyances in Growing Up
3
作者 Peng Yuanchang ye qing(译) 《Electricity》 2007年第2期15-17,共3页
Annoyances in growing up seem to be unavoidable. Many problems still face the Chinese power industry just climbing onto a new level of 600-GW installed capacity. It has to search practicable solutions for problems wit... Annoyances in growing up seem to be unavoidable. Many problems still face the Chinese power industry just climbing onto a new level of 600-GW installed capacity. It has to search practicable solutions for problems with the significant themes including structure optimization, efficiency improvement and environment protection. 展开更多
关键词 中国 能源工业 能源利用 环境保护
下载PDF
40 GW Created “Datang's Speed”
4
作者 Huang Yuan Yang Liu +1 位作者 ye qing(译) Zhang Yan(审校) 《Electricity》 2006年第2期33-35,共3页
As the unit No. 1 of Wangtan Power Plant, Hebei Datang International, completed 168-hour trial operation successively and was delivered to operation on December 7^th, 2005, the power installed capacity of China Datang... As the unit No. 1 of Wangtan Power Plant, Hebei Datang International, completed 168-hour trial operation successively and was delivered to operation on December 7^th, 2005, the power installed capacity of China Datang Corporation (CDT) reached 40.2496 GW. It indicated CDT, of which the installed capacity breaks 40 GW level, had become the second power generation group in China. In the meantime, it has also been the power generation group with most power units commissioned at a fastest speed since three years of power institutional reform. The yearly commissioned capacity reached 13.6406 GW. 展开更多
关键词 大唐电信 电力工业 河北 发展速度
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部