The combination of wind and pumped storage is a useful method to compensate the fluctuation of wind power generation, which would exploit the abundant wind potential and increase wind power penetration. Taiwan Power C...The combination of wind and pumped storage is a useful method to compensate the fluctuation of wind power generation, which would exploit the abundant wind potential and increase wind power penetration. Taiwan Power Company (TPC) develops renewable energy actively in recent years. Moreover, TPC has started planning a high penetration wind power system and building offshore wind farms around the coast of Zhangbin, Yunlin and Penghu. The target of the offshore wind power installed capacity is up to 3 GW by 2025. However, the integration of the large scale of wind power would give huge challenges to the system operator because wind is randomly characterized. In this study, after high penetration wind power is integrated, the impacts of system frequency and the dispatch of conventional units will be discussed. Additionally, the hybrid system combing wind power with pumped-storage will be planning to reduce the effect of system frequency.展开更多
A large-scale PV installation has a profound effect on the power quality and operation of the grid. Therefore, as installations of PV systems increase, changes to both technologies and interconnection standards are ne...A large-scale PV installation has a profound effect on the power quality and operation of the grid. Therefore, as installations of PV systems increase, changes to both technologies and interconnection standards are needed to address these high PV penetration systems. This paper investigates the main technical impacts of large-scale PV generations on power grids and associated interconnection standards. A case study by using the PSS/E software in the Kinmen power system was implemented to study the steady-state and transient characteristics for the high penetration PV systems.展开更多
This paper presents a new hybrid approach that combines Modified Priority List (MPL) with Charged System Search (CSS), termed MPL-CSS, to solve one of the most crucial power system’s operational optimization problems...This paper presents a new hybrid approach that combines Modified Priority List (MPL) with Charged System Search (CSS), termed MPL-CSS, to solve one of the most crucial power system’s operational optimization problems, known as unit commitment (UC) scheduling. The UC scheduling problem is a mixed-integer nonlinear problem, highly-dimensional and extremely constrained. Existing meta-heuristic UC solution methods have the problems of stopping at a local optimum and slow convergence when applied to large-scale, heavily-constrained UC applications. In the first step of the proposed method, initial hourly optimum solutions of UC are obtained by Modified Priority List (MPL);however, the obtained UC solution may still be possible to be further improved. Therefore, in the second step, the CSS is utilized to achieve higher quality solutions. The UC is formulated as mixed integer linear programming to ensure the tractability of the results. The proposed method is successfully applied to a popular test system up to 100 units generators for both 24-hr and 168-hr system. Computational results show that both solution cost and execution time are superior to those of published methods.展开更多
The continuation power flow method combined with the Jacobi-Davidson method is presented to trace the critical eigenvalues for power system small signal stability analysis. The continuation power flow based on a predi...The continuation power flow method combined with the Jacobi-Davidson method is presented to trace the critical eigenvalues for power system small signal stability analysis. The continuation power flow based on a predictor- corrector technique is applied to evaluate a continuum of steady state power flow solutions as system parameters change;meanwhile, the critical eigenvalues are found by the Jacobi-Davidson method, and thereby the trajectories of the critical eigenvalues, Hopf bifurcation and saddle node bifurcation points can also be found by the proposed method. The numerical simulations are studied in the IEEE 30-bus test system.展开更多
Renewable portfolio targets have been established in many regions around the world. Regional targets such as 20% renewable energy by year 2020 are not uncommon. As the levels of wind power penetration increase, there ...Renewable portfolio targets have been established in many regions around the world. Regional targets such as 20% renewable energy by year 2020 are not uncommon. As the levels of wind power penetration increase, there are many power system impacts. This work investigated possible challenges and technical requirements for high penetration of wind power systems. The main issues to discuss covers reserve determination, wind power forecasting, unit commitment with appropriate generation portfolio, wind turbine and storage system technical development, demand response management, electricity market design, and frequency stability.展开更多
Kinmen Island lacks fossil-fuel energy, However, it has rich potential for solar and wind energy resources because of its excellent climate and geographical location. Therefore, a large scale utilization of the renewa...Kinmen Island lacks fossil-fuel energy, However, it has rich potential for solar and wind energy resources because of its excellent climate and geographical location. Therefore, a large scale utilization of the renewable energy sources is favoured. In June 2004, the Kinmen County government published the Strategic Plan for the Sustainable Development of Kinmen, which focuses on maintaining the ecology of the islands. In the near future, a high penetration of renewable power can be predicted to be installed in this island. However, a large renewable energy penetration into a diesel power system would face technical and economic problems. Therefore, this study intends to discuss the system operation of the Kinmen system and investigates the original unit commitment scheduling. Based on the simulation results, a new unit commitment scheduling will be proposed in this work.展开更多
文摘The combination of wind and pumped storage is a useful method to compensate the fluctuation of wind power generation, which would exploit the abundant wind potential and increase wind power penetration. Taiwan Power Company (TPC) develops renewable energy actively in recent years. Moreover, TPC has started planning a high penetration wind power system and building offshore wind farms around the coast of Zhangbin, Yunlin and Penghu. The target of the offshore wind power installed capacity is up to 3 GW by 2025. However, the integration of the large scale of wind power would give huge challenges to the system operator because wind is randomly characterized. In this study, after high penetration wind power is integrated, the impacts of system frequency and the dispatch of conventional units will be discussed. Additionally, the hybrid system combing wind power with pumped-storage will be planning to reduce the effect of system frequency.
文摘A large-scale PV installation has a profound effect on the power quality and operation of the grid. Therefore, as installations of PV systems increase, changes to both technologies and interconnection standards are needed to address these high PV penetration systems. This paper investigates the main technical impacts of large-scale PV generations on power grids and associated interconnection standards. A case study by using the PSS/E software in the Kinmen power system was implemented to study the steady-state and transient characteristics for the high penetration PV systems.
文摘This paper presents a new hybrid approach that combines Modified Priority List (MPL) with Charged System Search (CSS), termed MPL-CSS, to solve one of the most crucial power system’s operational optimization problems, known as unit commitment (UC) scheduling. The UC scheduling problem is a mixed-integer nonlinear problem, highly-dimensional and extremely constrained. Existing meta-heuristic UC solution methods have the problems of stopping at a local optimum and slow convergence when applied to large-scale, heavily-constrained UC applications. In the first step of the proposed method, initial hourly optimum solutions of UC are obtained by Modified Priority List (MPL);however, the obtained UC solution may still be possible to be further improved. Therefore, in the second step, the CSS is utilized to achieve higher quality solutions. The UC is formulated as mixed integer linear programming to ensure the tractability of the results. The proposed method is successfully applied to a popular test system up to 100 units generators for both 24-hr and 168-hr system. Computational results show that both solution cost and execution time are superior to those of published methods.
文摘The continuation power flow method combined with the Jacobi-Davidson method is presented to trace the critical eigenvalues for power system small signal stability analysis. The continuation power flow based on a predictor- corrector technique is applied to evaluate a continuum of steady state power flow solutions as system parameters change;meanwhile, the critical eigenvalues are found by the Jacobi-Davidson method, and thereby the trajectories of the critical eigenvalues, Hopf bifurcation and saddle node bifurcation points can also be found by the proposed method. The numerical simulations are studied in the IEEE 30-bus test system.
文摘Renewable portfolio targets have been established in many regions around the world. Regional targets such as 20% renewable energy by year 2020 are not uncommon. As the levels of wind power penetration increase, there are many power system impacts. This work investigated possible challenges and technical requirements for high penetration of wind power systems. The main issues to discuss covers reserve determination, wind power forecasting, unit commitment with appropriate generation portfolio, wind turbine and storage system technical development, demand response management, electricity market design, and frequency stability.
文摘Kinmen Island lacks fossil-fuel energy, However, it has rich potential for solar and wind energy resources because of its excellent climate and geographical location. Therefore, a large scale utilization of the renewable energy sources is favoured. In June 2004, the Kinmen County government published the Strategic Plan for the Sustainable Development of Kinmen, which focuses on maintaining the ecology of the islands. In the near future, a high penetration of renewable power can be predicted to be installed in this island. However, a large renewable energy penetration into a diesel power system would face technical and economic problems. Therefore, this study intends to discuss the system operation of the Kinmen system and investigates the original unit commitment scheduling. Based on the simulation results, a new unit commitment scheduling will be proposed in this work.