Geomorphic dynamics of alluvial rivers in response to upstream damming have substantial impacts on navigation, habitat protection, and channel stability. The purpose of this study was to determine how flow and sedimen...Geomorphic dynamics of alluvial rivers in response to upstream damming have substantial impacts on navigation, habitat protection, and channel stability. The purpose of this study was to determine how flow and sediment regimes, and meander characteristics affect the morphological adjustment of bends in the Lower Jingjiang Reach(LJR) before and after the Three Gorges Project(TGP). Based on detailed field measurements and hydrological and topographic datasets from 1991 to 2016, banks and point bars morphodynamics of 12continuous bends in the LJR were comprehensively analyzed. Point bars in the LJR mainly experienced a net deposition before the TGP operation, but substantially deteriorated with a net erosion rate of 4.6 million m^(3) yr^(-1) in the post-TGP periods(2003–2016), and erosion on heads and upstream margins of point bars was a general adjustment pattern in the 12 bends.The most significant morphological changes of point bars and banks occurred in 2006–2011,indicating a delayed response of the channel evolution of the LJR to damming. Detailed observations suggested that the medium discharges(16,000–18,000 m^(3) s^(-1)) were the most contributive discharges in shaping the morphology of point bars and banks in the LJR after damming. In addition, we revealed the importance of sediment supply on meander deformation of the LJR, driven by sediment exchange over point bars, and more upstream planform deformation tended to occur in bends with high sinuosity(>2.0) in the LJR after damming.The relationship between meander deformation and sinuosity was manifested through the geometric adjustment range of point bars. The morphological adjustments of point bars in the highly curved or compound bends of the LJR were more conducive to cause flow deflections,leading to form concave-bank bars after the TGP operation.展开更多
基金Key Program of National Natural Science Foundation of China,No.U2040219National Natural Science Foundation of China,No.51579015Program of National Key Research and Development Plan of China,No.2016YFC0402108, No.2016YFC0402103。
文摘Geomorphic dynamics of alluvial rivers in response to upstream damming have substantial impacts on navigation, habitat protection, and channel stability. The purpose of this study was to determine how flow and sediment regimes, and meander characteristics affect the morphological adjustment of bends in the Lower Jingjiang Reach(LJR) before and after the Three Gorges Project(TGP). Based on detailed field measurements and hydrological and topographic datasets from 1991 to 2016, banks and point bars morphodynamics of 12continuous bends in the LJR were comprehensively analyzed. Point bars in the LJR mainly experienced a net deposition before the TGP operation, but substantially deteriorated with a net erosion rate of 4.6 million m^(3) yr^(-1) in the post-TGP periods(2003–2016), and erosion on heads and upstream margins of point bars was a general adjustment pattern in the 12 bends.The most significant morphological changes of point bars and banks occurred in 2006–2011,indicating a delayed response of the channel evolution of the LJR to damming. Detailed observations suggested that the medium discharges(16,000–18,000 m^(3) s^(-1)) were the most contributive discharges in shaping the morphology of point bars and banks in the LJR after damming. In addition, we revealed the importance of sediment supply on meander deformation of the LJR, driven by sediment exchange over point bars, and more upstream planform deformation tended to occur in bends with high sinuosity(>2.0) in the LJR after damming.The relationship between meander deformation and sinuosity was manifested through the geometric adjustment range of point bars. The morphological adjustments of point bars in the highly curved or compound bends of the LJR were more conducive to cause flow deflections,leading to form concave-bank bars after the TGP operation.