期刊文献+
共找到1篇文章
< 1 >
每页显示 20 50 100
Construction technology on pile foundation of No.6 main pier in Dashengguan Yangtze Bridge
1
作者 Hongbin YU zeping lian 《Frontiers of Structural and Civil Engineering》 SCIE EI 2009年第3期339-343,共5页
Based on pile foundation construction of No.6 main pier,deep mudstone geological foundation and deep-water construction in Nanjing-Dashengguan Yangtze Bridge,the method of super-large-diameter bored pile in deep water... Based on pile foundation construction of No.6 main pier,deep mudstone geological foundation and deep-water construction in Nanjing-Dashengguan Yangtze Bridge,the method of super-large-diameter bored pile in deep water is studied.The spread drill,application of PHP mud,and choice of machine are solved by adopting two machines of KTY4000 and KPG300A.Besides,the airlift reversing circulation is selected in slag discharge.The results show that this method can ensure successfully the construction of pier foundation to satisfy the demands of codes. 展开更多
关键词 PHP slurry KTY4000 drilling machine KPG3000A drilling machine spread drill
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部