Vortex-induced vibration is quite common during the operation of offshore risers or umbilical cables,commonly leading to serious damage to risers and reduced service life.Vortex-induced vibration of the offshore riser...Vortex-induced vibration is quite common during the operation of offshore risers or umbilical cables,commonly leading to serious damage to risers and reduced service life.Vortex-induced vibration of the offshore risers could be effectively suppressed by fairing devices.In this paper,a newly developed vortex-induced vibration fairing and large eddy simulation model of the FLUENT software were used for numerical analysis,experimental research and stimulating vortex-induced vibration at 0.1–2 ms^-1.The data of the numerical model with fairing was compared and analyzed to study the vortex shedding frequency at different Reynolds numbers and changes in drag and lift coefficients.The displacement state of 12 in risers with and without fairing was experimentally tested using a five degree-of-freedom balance.The vortex-induced vibration effect of the fairing was tested at different velocities.The result shows the drag reduction effect of the fairing is more obvious when the flow velocity is 0.4–1.2 ms^-1 and the maximum drag reduction reaches 55.6%when the flow velocity is 0.6 ms^-1.Additionally,the drag reduction effect was obvious when the flow velocity was greater than 1.3 ms^-1 and less than 0.3.The result indicates that the developed 12 in fairing,with good potential in engineering applications,has good vortex-induced vibration-suppression effects.展开更多
The first floating platform concept design work for South China Sea is undergoing in DMAR's office now. This tension leg platform has potential to become the first advanced floating production platform project. Pr...The first floating platform concept design work for South China Sea is undergoing in DMAR's office now. This tension leg platform has potential to become the first advanced floating production platform project. Project execution is always a challenge for floating system. This paper focuses on the critical elements of project execution for tension leg platform,and studies potential implications to future oil and gas exploration in South China Sea. There are many factors affecting successful execution of floating system project,including technical issues, engineering management,interface management,etc. There are also failure examples of project execution in the industry. The author has participated 28 large detailed projects and has gained extensive experience on floating projects,with ample hands-on project experiences. A detailed tension leg platform project study example and discussions in depth are presented for future project execution in China deepwater development.展开更多
This paper focuses on potential development models of future oil and gas exploration in South China Sea. A detailed study of current development models worldwide is performed through some examples of industry installe...This paper focuses on potential development models of future oil and gas exploration in South China Sea. A detailed study of current development models worldwide is performed through some examples of industry installed/ongoing projects and major technical issues encountered during these practice. Key technologies are discussed for the success of field development. Some of the technologies and field development experience can be used for South China Sea project. Several models are studied in field development for different scenarios,including marginal field,large oil field and gas field. With the massive investment activities,continued improved technologies,and rapidly growing pool of professionals,the offshore industry in China will soon encounter a golden period.展开更多
The paper provided an updated status of technology for deepwater field development, demonstrated the importance of its application through actual project example, and discussed some future technical development trends...The paper provided an updated status of technology for deepwater field development, demonstrated the importance of its application through actual project example, and discussed some future technical development trends. The focus was on the floating structures. By reviewing some of the engineering aspects of the project, the technology advancement, innovations and challenges in offshore engineering were discussed and demonstrated. The author’s view of technical challenges facing deepwater forwarding was discussed, which covered water depth limitations, new material application, installation methods, riser development and operational issues. An overview of technologies that will enable deepwater projects to be extended into new frontiers was presented.展开更多
基金financially supported by the 7th Generation Ultra Deep-Water Drilling Unit Innovation Projectthe National Key Research and Development Plan(No.2016YFC0303400)+2 种基金the Fundamental Research Funds for the Central Universities(No.17CX02013A)the Natural Foundation of Shandong Province(Nos.ZR2017BEE031,ZR2017LEE032)the National Natural Science Foundation of China(No.51609201)
文摘Vortex-induced vibration is quite common during the operation of offshore risers or umbilical cables,commonly leading to serious damage to risers and reduced service life.Vortex-induced vibration of the offshore risers could be effectively suppressed by fairing devices.In this paper,a newly developed vortex-induced vibration fairing and large eddy simulation model of the FLUENT software were used for numerical analysis,experimental research and stimulating vortex-induced vibration at 0.1–2 ms^-1.The data of the numerical model with fairing was compared and analyzed to study the vortex shedding frequency at different Reynolds numbers and changes in drag and lift coefficients.The displacement state of 12 in risers with and without fairing was experimentally tested using a five degree-of-freedom balance.The vortex-induced vibration effect of the fairing was tested at different velocities.The result shows the drag reduction effect of the fairing is more obvious when the flow velocity is 0.4–1.2 ms^-1 and the maximum drag reduction reaches 55.6%when the flow velocity is 0.6 ms^-1.Additionally,the drag reduction effect was obvious when the flow velocity was greater than 1.3 ms^-1 and less than 0.3.The result indicates that the developed 12 in fairing,with good potential in engineering applications,has good vortex-induced vibration-suppression effects.
文摘The first floating platform concept design work for South China Sea is undergoing in DMAR's office now. This tension leg platform has potential to become the first advanced floating production platform project. Project execution is always a challenge for floating system. This paper focuses on the critical elements of project execution for tension leg platform,and studies potential implications to future oil and gas exploration in South China Sea. There are many factors affecting successful execution of floating system project,including technical issues, engineering management,interface management,etc. There are also failure examples of project execution in the industry. The author has participated 28 large detailed projects and has gained extensive experience on floating projects,with ample hands-on project experiences. A detailed tension leg platform project study example and discussions in depth are presented for future project execution in China deepwater development.
文摘This paper focuses on potential development models of future oil and gas exploration in South China Sea. A detailed study of current development models worldwide is performed through some examples of industry installed/ongoing projects and major technical issues encountered during these practice. Key technologies are discussed for the success of field development. Some of the technologies and field development experience can be used for South China Sea project. Several models are studied in field development for different scenarios,including marginal field,large oil field and gas field. With the massive investment activities,continued improved technologies,and rapidly growing pool of professionals,the offshore industry in China will soon encounter a golden period.
文摘The paper provided an updated status of technology for deepwater field development, demonstrated the importance of its application through actual project example, and discussed some future technical development trends. The focus was on the floating structures. By reviewing some of the engineering aspects of the project, the technology advancement, innovations and challenges in offshore engineering were discussed and demonstrated. The author’s view of technical challenges facing deepwater forwarding was discussed, which covered water depth limitations, new material application, installation methods, riser development and operational issues. An overview of technologies that will enable deepwater projects to be extended into new frontiers was presented.