The slow control system in the CSR External-target Experiment(CEE)aims to implement the monitoring of the spectrometer status,then further to record the operating parameters and realize the remote control of the diffe...The slow control system in the CSR External-target Experiment(CEE)aims to implement the monitoring of the spectrometer status,then further to record the operating parameters and realize the remote control of the different devices.Based on the development carried out last year,the detailed design review was completed in March 2022,and the project summary review is in progress.Joint testing between the slow control and other systems will be completed by October 2023.We will continue to improve and optimize the system functions and performance this year.展开更多
文摘The slow control system in the CSR External-target Experiment(CEE)aims to implement the monitoring of the spectrometer status,then further to record the operating parameters and realize the remote control of the different devices.Based on the development carried out last year,the detailed design review was completed in March 2022,and the project summary review is in progress.Joint testing between the slow control and other systems will be completed by October 2023.We will continue to improve and optimize the system functions and performance this year.