Based on the well water level data in Majiagou Mine in Tangshan City since 2000,it is suggested that the water level rise from 2008-2014 is possibly associated with reduced infiltration caused by less precipitation,to...Based on the well water level data in Majiagou Mine in Tangshan City since 2000,it is suggested that the water level rise from 2008-2014 is possibly associated with reduced infiltration caused by less precipitation,together with the effect of less groundwater exploitation. However,the water level rise from 1992-1998 cannot be interpreted properly if we extend the data source back to 1991. After comparing the data with long-term water level data of five wells with different hydro-geological units in Tangshan and Qinhuangdao, the study indicates that the long-term water level variation cannot be only attributed to the effect of less precipitation and the control of groundwater exploitation,but also with the influence of regional stress field change.With the support of regional geological and tectonic information,combined with the comprehensive analysis of CBM data obtained from the coal field,new understandings of the dynamic characteristics of annual variation are obtained.展开更多
The water level rising rate of Tangshan mine well significantly accelerated in 2010,and the ascensional range was obviously higher than that of the same period in previous years.From the view of groundwater dynamics a...The water level rising rate of Tangshan mine well significantly accelerated in 2010,and the ascensional range was obviously higher than that of the same period in previous years.From the view of groundwater dynamics and loading effects,and based on the water pumping( pouring) water test model and semi-infinite elastic space theory model under uniform load,the effects of grouting and loading of nearby building construction on the well water level were analyzed. Results show that grouting at a distance of 200 ~ 700 m to the well,with amount of 2500m3 per day and duration of 270 d,can cause an 8 ~ 11 m rise of well water level; and loading of large-area building construction can cause about a 4m rise of well water level. Through the analysis of these factors,we find that the water level anomalous rising of Tangshan mine well was relevant to grouting and loading of the nearby building construction. This study provides a scientific basis for anomalous rising analysis of water level of Tangshan mine well.展开更多
基金sponsored by the Key Project of Spark Program of Earthquake Sciences of Hebei Province Tectonic Characteristics of the Northern Section of Tangshan Fault and Its Relation with Earthquakes(DZ20190424079)。
文摘Based on the well water level data in Majiagou Mine in Tangshan City since 2000,it is suggested that the water level rise from 2008-2014 is possibly associated with reduced infiltration caused by less precipitation,together with the effect of less groundwater exploitation. However,the water level rise from 1992-1998 cannot be interpreted properly if we extend the data source back to 1991. After comparing the data with long-term water level data of five wells with different hydro-geological units in Tangshan and Qinhuangdao, the study indicates that the long-term water level variation cannot be only attributed to the effect of less precipitation and the control of groundwater exploitation,but also with the influence of regional stress field change.With the support of regional geological and tectonic information,combined with the comprehensive analysis of CBM data obtained from the coal field,new understandings of the dynamic characteristics of annual variation are obtained.
基金funded by the Earthquake Tracking Contract Orientated Task,CEA(2011020303)Science and Technology Project of Hebei Province(13275407D)
文摘The water level rising rate of Tangshan mine well significantly accelerated in 2010,and the ascensional range was obviously higher than that of the same period in previous years.From the view of groundwater dynamics and loading effects,and based on the water pumping( pouring) water test model and semi-infinite elastic space theory model under uniform load,the effects of grouting and loading of nearby building construction on the well water level were analyzed. Results show that grouting at a distance of 200 ~ 700 m to the well,with amount of 2500m3 per day and duration of 270 d,can cause an 8 ~ 11 m rise of well water level; and loading of large-area building construction can cause about a 4m rise of well water level. Through the analysis of these factors,we find that the water level anomalous rising of Tangshan mine well was relevant to grouting and loading of the nearby building construction. This study provides a scientific basis for anomalous rising analysis of water level of Tangshan mine well.