To solve the problem of water seepage of vertical feeding borehole for solid materials,we established the fluid-solid coupling dynamic model of groundwater flowing in rock mass adjacent to the vertical feeding borehol...To solve the problem of water seepage of vertical feeding borehole for solid materials,we established the fluid-solid coupling dynamic model of groundwater flowing in rock mass adjacent to the vertical feeding borehole.Combining with the engineering geological conditions,we built a numeral model to study the influence rule of the aquifer hydraulic pressure and seepage location of feeding borehole on the amount of seepage with fnite element numerical method.The results show that the nonlinear relationship is presented among the amount of seepage,the seepage location and aquifer hydraulic pressure.The higher the aquifer hydraulic pressure is,the closer the distance between seepage location and aquifer is,and the faster the harmful levels of aquifer will grow.In practice,we calculated the allowable seepage of feeding borehole by the optimum moisture content and natural moisture content of backflling materials,and then determined the protection zone of feeding borehole,so the moisture content of backflling materials can be controlled within the scope of optimum moisture content.展开更多
Additional displacement of the building foundations over old goaf are prone to happen under the additional loads induced by new buildings, weakening-rock mass by mining and seismic actions, which will cause serious da...Additional displacement of the building foundations over old goaf are prone to happen under the additional loads induced by new buildings, weakening-rock mass by mining and seismic actions, which will cause serious damage to the buildings. In order to analyze the safety of the building foundations safety over the old goaf, the structure characteristics of the strata over the old goaf was investigated and the instability conditions of overhanging rocks upon old goaf were also analyzed in this paper. The results indicate that the stability of overhanging rocks is remarkably decreased by the interactions of mining fractures, earthquake force and building load, in addition, the settlement of the foundations over old goaf is increased by the instability of overhanging rocks. According to the location of a new power plant in Yima Mine and its ambient conditions, we defined the influence scope of old goaf via resistivity tomography. Based on the seismic parameters of the construction site, a numerical FLAC3 dmodel of the building foundation under the seismic actions and building load was developed. The numerical results are obtained as follows: the foundation of the main power house meets the requirement of 6°seismic fortification intensity; however, under 7° seismic fortification intensity, the maximum differential settlement of foundation between the neighboring pillars is close to the maximum allowable value, while the seismic fortification intensity reaches 8°, but the safety requirements will not be satisfied.展开更多
A mechanical model to control the top-coal deformation is established in accordance with the structural characters of the gob-side entry surrounding rock for the fully-mechanic top-coal caving; the analytical solution...A mechanical model to control the top-coal deformation is established in accordance with the structural characters of the gob-side entry surrounding rock for the fully-mechanic top-coal caving; the analytical solution of top coal roof-sag curve is deduced with Winkler elastic foundation beam model. By means of a calculating and analytic program, the top coal roof-sag values are calculated under the conditions of different supporting intensities, widths of narrow pillars and stiffness of top coal; meanwhile, the relationship between the roof-sag values and supporting intensity, width of narrow pillars and stiffness of top coal is analyzed as well. With the actual situation of the gob-side entry taken into consideration, the parameters of top-coal control are determined and a supporting plan is proposed for the top-coal control,which is proved to be reliable and effective by on-site verification. Some theoretical guidance and advice are put forward for the top-coal deformation control in gob-side entry for fully mechanized top-coal caving face.展开更多
基金funded by the State Key Development Program for Basic Research of China(No.2013CB227900)the National High Technology Joint Research Program of China(No.2012BAB13B00)
文摘To solve the problem of water seepage of vertical feeding borehole for solid materials,we established the fluid-solid coupling dynamic model of groundwater flowing in rock mass adjacent to the vertical feeding borehole.Combining with the engineering geological conditions,we built a numeral model to study the influence rule of the aquifer hydraulic pressure and seepage location of feeding borehole on the amount of seepage with fnite element numerical method.The results show that the nonlinear relationship is presented among the amount of seepage,the seepage location and aquifer hydraulic pressure.The higher the aquifer hydraulic pressure is,the closer the distance between seepage location and aquifer is,and the faster the harmful levels of aquifer will grow.In practice,we calculated the allowable seepage of feeding borehole by the optimum moisture content and natural moisture content of backflling materials,and then determined the protection zone of feeding borehole,so the moisture content of backflling materials can be controlled within the scope of optimum moisture content.
基金the Funds of the State Key Development Program for Basic Research of China (Nos. 2013CB227900, 2010CB226800)the National Natural Science Foundation of China (Nos. 51108161, 51374201)+2 种基金the Open Laboratory Foundation for Deep Mine Construction of Henan Province of China (No. 2011KF-09)the Doctor Foundation in Henan Polytechnic University of China (No. Q2013-065)the Key Program for Science and Technology Research of Henan Province of China (Nos. 14A560002, 14B560021).
文摘Additional displacement of the building foundations over old goaf are prone to happen under the additional loads induced by new buildings, weakening-rock mass by mining and seismic actions, which will cause serious damage to the buildings. In order to analyze the safety of the building foundations safety over the old goaf, the structure characteristics of the strata over the old goaf was investigated and the instability conditions of overhanging rocks upon old goaf were also analyzed in this paper. The results indicate that the stability of overhanging rocks is remarkably decreased by the interactions of mining fractures, earthquake force and building load, in addition, the settlement of the foundations over old goaf is increased by the instability of overhanging rocks. According to the location of a new power plant in Yima Mine and its ambient conditions, we defined the influence scope of old goaf via resistivity tomography. Based on the seismic parameters of the construction site, a numerical FLAC3 dmodel of the building foundation under the seismic actions and building load was developed. The numerical results are obtained as follows: the foundation of the main power house meets the requirement of 6°seismic fortification intensity; however, under 7° seismic fortification intensity, the maximum differential settlement of foundation between the neighboring pillars is close to the maximum allowable value, while the seismic fortification intensity reaches 8°, but the safety requirements will not be satisfied.
基金funded by the National Natural Science Foundation of China(No.51374201,51323004)the State Key Development Program for Basic Research of China(No.2013CB227900)the College Student’s Program for Innovation of China University of Mining and Technology of China(No.201507)
文摘A mechanical model to control the top-coal deformation is established in accordance with the structural characters of the gob-side entry surrounding rock for the fully-mechanic top-coal caving; the analytical solution of top coal roof-sag curve is deduced with Winkler elastic foundation beam model. By means of a calculating and analytic program, the top coal roof-sag values are calculated under the conditions of different supporting intensities, widths of narrow pillars and stiffness of top coal; meanwhile, the relationship between the roof-sag values and supporting intensity, width of narrow pillars and stiffness of top coal is analyzed as well. With the actual situation of the gob-side entry taken into consideration, the parameters of top-coal control are determined and a supporting plan is proposed for the top-coal control,which is proved to be reliable and effective by on-site verification. Some theoretical guidance and advice are put forward for the top-coal deformation control in gob-side entry for fully mechanized top-coal caving face.