In 2015, the service time of the two on-line ion sources of HIRFL-CSR accelerator facility, SECRAL and LECR3, is 3 335.5 and 3 168.5 h, respectively, amouting to 6 504 h. Except 26Mg7+, which was required by the accel...In 2015, the service time of the two on-line ion sources of HIRFL-CSR accelerator facility, SECRAL and LECR3, is 3 335.5 and 3 168.5 h, respectively, amouting to 6 504 h. Except 26Mg7+, which was required by the accelerator but failed to be produced due the oxidation of the material, 20 kinds of ion beams have been delivered successfull.The failure time is 49 h this year, mainly attributed to the breakdown of the cryostat system.展开更多
文摘In 2015, the service time of the two on-line ion sources of HIRFL-CSR accelerator facility, SECRAL and LECR3, is 3 335.5 and 3 168.5 h, respectively, amouting to 6 504 h. Except 26Mg7+, which was required by the accelerator but failed to be produced due the oxidation of the material, 20 kinds of ion beams have been delivered successfull.The failure time is 49 h this year, mainly attributed to the breakdown of the cryostat system.