期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
全面完成2002年度三峡工程建设任务——2002年总公司工作会议工程建设部分工作报告
1
作者 贺恭 《中国三峡建设》 2002年第2期13-15,52,共3页
The year 2001 was the first one of three years at crucial stage for the second-phase construction of the Three Gorges proect. The year 2002 will be a turning point. From now on, the reservoir will be water filled afte... The year 2001 was the first one of three years at crucial stage for the second-phase construction of the Three Gorges proect. The year 2002 will be a turning point. From now on, the reservoir will be water filled after 18 months and the first unit will be commissioned after 22 months. The master milestones on the construction schedule in 2002 are as follows: upstream water will be allowed through the upstream cofferdam in May and the downstream cofferdam in July; the shiplock will be tested and regulated without and with water in July and October, respectively; and the open diversion channel will be closed in November. 展开更多
关键词 中国三峡总公司 2002年 会议报告 船闸
下载PDF
开拓创新尽快建成世界一流的水电企业——在中国三峡总公司2002年工作会议上的讲话
2
作者 郭树言 《中国三峡建设》 2002年第2期3-5,22,共4页
The Three Gorges project will be the biggest water control project in the world and a great cause throughout the ages for the Chinese nation. With the construction progress, the outlook of the dam has reached the desi... The Three Gorges project will be the biggest water control project in the world and a great cause throughout the ages for the Chinese nation. With the construction progress, the outlook of the dam has reached the design targets and the dam has rested stably on the Yangtze river. By the end of November 200l, a total of 4l8000 people had removed out from the reservoir area. In 200l, RMB 5.27 billion was put into the transmission and distributionworks for the Three Gorges project. The China Three Gorges Project Corporation (CTGPC), as the owner of theGezhouba and Three Gorges projects and facing the opportunities for development of cascade hydro projects along theupstream reach of the Yangtze river, has totally favorable conditions to be formed a first-rate leading hydro utility inthe world. 展开更多
关键词 中国三峡总公司 会议讲话 水电企业 2002年
下载PDF
积极推进总公司改革和发展——在中国三峡总公司2002年工作会议上的讲话
3
作者 李永安 《中国三峡建设》 2002年第2期8-12,51,共5页
In accordance with the work meeting 2001, a feasibility in the reform of the corporation was studied thoroughly last year. As pointed out by Vice-premier Wu Bangguo, the CTGPC will be reformed to become a main investm... In accordance with the work meeting 2001, a feasibility in the reform of the corporation was studied thoroughly last year. As pointed out by Vice-premier Wu Bangguo, the CTGPC will be reformed to become a main investment utility authorized by the state that can make decisions by itself to finance the major capital construction projects, and can be as a major enterprise group running business mainly including development and operation of water andhydro resources. The Corporation will be entitled as an investor on behalf of the government, including enjoying legally rights in capital benefits, business operation, arrangement of equity, decision-making on key items and selection ofmanagement teams, as well investment and construction of other major projects. For the industrial pattern, the Corporation will continuously stick to as the main business the development and operation of water resource on the upper andmiddle reaches of the Yangtze river. and optimize the energy structure through development, acquisition, joint stock,holding. And meantime, based on the own advantages and the strategy of relative multi-oriented development to promote the development of the superior industries and new growing points, the Corporation will become a more competi-tive and attractive group corp. 展开更多
关键词 中国三峡总公司 会议讲话 2002年 水利资源
下载PDF
上一页 1 下一页 到第
使用帮助 返回顶部