During the later period of construction of Tianshengqiao concrete faced rockfill dam(CFRD), cracks appeared in the upstream fill slope. The main reason was the nonuniform deformation. The treatment methods were: for c...During the later period of construction of Tianshengqiao concrete faced rockfill dam(CFRD), cracks appeared in the upstream fill slope. The main reason was the nonuniform deformation. The treatment methods were: for cracks with opening less than 1 cm, the cracked slope was compacted with added effort to eliminate cracks; for cracks with opening greater than 1 cm , crack grouting was carried out . The practice demonstrated the treatment was successful. Careful analysis of the relation between sectionalized filling and crack emergence is of significance in guiding the construction design and drawing out filling plan for a high CFRD.展开更多
文摘During the later period of construction of Tianshengqiao concrete faced rockfill dam(CFRD), cracks appeared in the upstream fill slope. The main reason was the nonuniform deformation. The treatment methods were: for cracks with opening less than 1 cm, the cracked slope was compacted with added effort to eliminate cracks; for cracks with opening greater than 1 cm , crack grouting was carried out . The practice demonstrated the treatment was successful. Careful analysis of the relation between sectionalized filling and crack emergence is of significance in guiding the construction design and drawing out filling plan for a high CFRD.