期刊文献+
共找到1,329篇文章
< 1 2 67 >
每页显示 20 50 100
Finite element analysis of the Taizhou Water Station Site 被引量:2
1
作者 潘建伍 淳庆 《Journal of Southeast University(English Edition)》 EI CAS 2013年第3期289-293,共5页
The Taizhou Water Station Site is an ancient masonry structure ruin built in the Southern Song Dynasty. The main structure was severely damaged. In order to understand its current structural properties and provide a s... The Taizhou Water Station Site is an ancient masonry structure ruin built in the Southern Song Dynasty. The main structure was severely damaged. In order to understand its current structural properties and provide a scientific basis for protection design nonlinear finite element analysis and parameter analysis are carried out.The crack patterns deformations and stresses of the main structure under four load cases are analyzed by nonlinear finite element analysis and the effect of the backfill bulk density and modulus on the maximum principal tensile stress and maximum compressive stress are studied by parameter analysis.The results show that the most unfavorable condition for the foundation is the combination of weight+backfill soil pressure+additional load the most unfavorable load case to the main structure is weight +backfill soil pressure +water pressure+additional heap load the maximum principal tensile stress of the main structure is very sensitive to the changes in the bulk density of the backfill soil. 展开更多
关键词 finite element analysis taizhou Water StationSite ancient masonry structure
下载PDF
Concentrations,Accumulation and Sources of PAHs in Surface Layer Sediments of Taizhou Bay
2
作者 金彬明 江锦花 《Marine Science Bulletin》 CAS 2008年第1期38-45,共8页
The concentrations, accumulation and sources of 15 polycyclic aromatic hydrocarbons (PAHs) had been studied or evaluated in the surface layer sediments of Taizhou Bay, China. It showed that the concentrations of PAH... The concentrations, accumulation and sources of 15 polycyclic aromatic hydrocarbons (PAHs) had been studied or evaluated in the surface layer sediments of Taizhou Bay, China. It showed that the concentrations of PAHs ranged from 85.4 to 167.6 ng/g (averaged 138.62 ng/g), and the highest level was found in Jiao Jiang Dock. Percentages of 2-, 3-, 4-, 5- and 6-cyclic aromatic hydrocarbons were 7.8 %, 42.1%, 33.3 %, 9.6 % and 7.2 % respectively. The accumulation indices of PAHs ranged from 532.7 to 1068.9 (averaged 807.5), and the index of Phenanthrene was the highest (122.7), while that of Benzo (a) Pyrene was the lowest (2.7) among them. In Taizhou Bay, PAHs in surface layer sediments came mainly from coal burning, partly from direct pollution of petroleum hydrocarbons. 展开更多
关键词 taizhou Bay Surface layer sediment PAHS Concentration
下载PDF
Study on Urban Forest Construction Concepts and Layouts in Taizhou City 被引量:1
3
作者 WANG Dongmi WANG Chengkuan 《Journal of Landscape Research》 2015年第2期35-39,共5页
Taizhou is an economically-developed port city on the golden coastline of China, characterized by typical coastal and combined green cores, mountains and waters, and special plants. This paper analyzed natural conditi... Taizhou is an economically-developed port city on the golden coastline of China, characterized by typical coastal and combined green cores, mountains and waters, and special plants. This paper analyzed natural conditions and city features of Taizhou, assessed current construction of local urban forests, and proposed pertinent construction concepts in view of diversifi ed needs of urban development on forest construction. On the basis of the city development, principles of urban forest layout were put forward, and the overall structure of "one core, one belt, two rings, three corridors, four groups, fi ve windows, and multiple bases" was given for the construction of urban forest in coastal landscape cities, in addition, the effect and feasibility of the layout were analyzed. 展开更多
关键词 Urban forest Construction concept Overall layout taizhou City
下载PDF
Numerical analysis on bearing capacity of middle pylon caisson foundation of Taizhou Bridge 被引量:1
4
作者 Wang Jun Shao Guojian +1 位作者 Hu Feng Gu Lijun 《Engineering Sciences》 EI 2012年第3期44-48,共5页
Because of the computation difficulty of the beating capacity of large underwater caisson foundation on thick overburden layer ground, the geotechnieal software FLAC3D was utilized in the 3D numerical analysis on the ... Because of the computation difficulty of the beating capacity of large underwater caisson foundation on thick overburden layer ground, the geotechnieal software FLAC3D was utilized in the 3D numerical analysis on the bearing capacity of middle pylon foundation. From the computational results, it is concluded that the caisson foundation has a good bearing capacity on thick overburden layer ground and the beating capacity can be improved assuming that the soil near the area of basal comer is reinforced. 展开更多
关键词 taizhou Bridge caisson foundation bearing capacity numerical analysis
下载PDF
Study in the design and manufacture process of the elastic cable anchor box in steel box girder of Taizhou Bridge 被引量:1
5
作者 Gu Bifeng Chen Ce Ding Lei 《Engineering Sciences》 EI 2011年第2期64-68,共5页
Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety c... Taizhou Yangtze River Highway Bridge is a large span suspension bridge with three pylons. The elastic cables are installed to connect the steel tower and the steel box girder. The constraints can increase the safety coefficient of the middle saddle, and improve the stress conditions of the middle pylon and decrease the deflection in the middle of the main girder, as well as the longitudinal displacement of the main girder caused by live loads. The anchorage boxes of the elastic cable are installed in the wind fairing outside the vertical web plate of the box girder. Two anchor boxes form a pair and are arranged parallelly. Eight anchor boxes are installed in the bridge. In this paper, the design scheme and the technical difficulties in manufacturing are briefly discussed with the precision control techniques. 展开更多
关键词 taizhou Bridge steel box girder the elastic cables DESIGN manufacture techniques
下载PDF
Wind tunnel study of aerodynamic wind loading on middle pylon of Taizhou Bridge 被引量:1
6
作者 Zhang Zhen Ma Rujin +1 位作者 Hu Xiaohong Chen Airong 《Engineering Sciences》 EI 2011年第2期69-73,共5页
Segment sectional model tests are carried out to investigate the wind loading on middle pylon of Taizhou Bridge, which has complicated three-dimensional flow due to its feature of double columns. Through the force mea... Segment sectional model tests are carried out to investigate the wind loading on middle pylon of Taizhou Bridge, which has complicated three-dimensional flow due to its feature of double columns. Through the force measuring tests, aerodynamic force coefficients of every segment of the pylon columns have been obtained. It is found that the tested aerodynamic force coefficients are much smaller than those given by codes. The interference effects of aerodynamic force coefficients between columns of pylon are discussed. The results show that the interference effect is the most evident when the yaw angle is about 30 ° from transverse direction. This kind of interference effect can be described as diminutions in transverse aerodynamic force coefficients and magnifications in longitudinal aerodynamic force coefficients of downstream columns. 展开更多
关键词 wind tunnel test aerodynamic force coefficient interference effects segment sectional model tests middle pylon taizhou Bridge
下载PDF
A Serological Survey of Contagious Caprine Pleuropneumonia in Taizhou City,Jiangsu Province
7
作者 Xingang HU Yinyun HUANG +3 位作者 Tingting XU Zhinan ZHU Yajun TIAN Yuliang XU 《Agricultural Biotechnology》 CAS 2015年第6期15-17,22,共4页
[ Objective] This study aimed to investigate the prevalence of contagious caprine pleuropneumonia in Taizhou City, Jiangsu Province. [ Method] By using indirect hemagglutination assay kits for detection of antibodies ... [ Objective] This study aimed to investigate the prevalence of contagious caprine pleuropneumonia in Taizhou City, Jiangsu Province. [ Method] By using indirect hemagglutination assay kits for detection of antibodies against Mycoplasma capricolum subsp, capripneumoniae ( Mecp), Mycoplasma mycoides subsp. capriclonum (Mmc) and Mycopalsam ovipneumonia ( Movi), 1 157 goat sera from Taizhou City of Jiangsu Province were detected. [ Result ] The average positive detection rate of Mccp and Mmc in infected goats was 51.85% and 39.81%, respectively; the average positive detection rate of Mccp and Mmc in non-infected goats was 10.52% and 5.84%, respectively, and the total positive detection rate of Mycoplasma infections was 16.37%. [ Conclusion ] Mycoplasma infections oc- cur commonly in Taizhou City. The prevention and control of Mycoplasma infections should be strengthened. 展开更多
关键词 taizhou GOAT MYCOPLASMA Contagious pleuropneumonia Serological survey
下载PDF
Epidemiological Survey on Canine Parvovirus Disease in Taizhou Region,Jiangsu Province,China
8
作者 Yuan Weifeng Liu Jing +3 位作者 Zhao Xuegang Lu Jiang Zheng Xiaoliang Zhu Hongfei 《Animal Husbandry and Feed Science》 CAS 2014年第4期173-174,179,共3页
The canine parvovirus disease is an acute infectious disease caused by canine parvovirus(CPV). It is clinically characterized by severe vomiting,hemorrhagic enteritis,significant reduction in white blood cells and myo... The canine parvovirus disease is an acute infectious disease caused by canine parvovirus(CPV). It is clinically characterized by severe vomiting,hemorrhagic enteritis,significant reduction in white blood cells and myocarditis. The disease with high incidence,highly infectious and high mortality has become one of the serious infectious diseases threatening dog raising industry in China. In this research,260 cases of canine parvovirus case from an Aite Pet Clinic in Taizhou City during January 2010 and March 2011 were analyzed. This study discloses the epidemiology of CPV in Taizhou region of Jiangsu Province,i. e.,the incidence of CPV and canine motility are closely correlated with age,breed,immune inoculation and season. This study provides useful guide for the clinical treatment of CPV in the future. 展开更多
关键词 taizhou region Canine parvovirus disease Epidemiological investigation
下载PDF
Characteristics of fault structures in the south coastal zone of Taizhou based on aeromagnetic data
9
作者 Ming Wang Shengjun Liang +2 位作者 Jiaojiao Li Xiaoxing Lin Yongjun Zhang 《Applied Geophysics》 SCIE CSCD 2020年第5期719-735,901,共18页
The south coastal of Taizhou lies on the magmatic rock belt along the southeast coast of China,which has a complex regional geological structures,intense tectonic movement,and frequent magmatic activities.On the basis... The south coastal of Taizhou lies on the magmatic rock belt along the southeast coast of China,which has a complex regional geological structures,intense tectonic movement,and frequent magmatic activities.On the basis of the latest aeromagnetic data,combined with regional geology,gravity,and magnetic susceptibility information,integrated interpretation of the regional aeromagnetic anomalies and their refl ected faults was completed.According to the block features in diff erent zones of the reduction to the pole aeromagnetic data,the magnetic field characteristics and relationship with the structure division were described in detail.The different characteristics of the magnetic field are the concentrated reflection of tectonic movements,magmatic activities,and stratigraphic distributions;the fault structure,especially deep and large fault structures,was inferred and studied.The fault structures were mainly distributed in the NE,NNE,and NW directions,with approximately equal spacing between them.The magnetic anomaly is mainly characterized by the boundary,gradient zones,and beaded anomalies in a different magnetic field.The faults are not only important tectonic boundaries in this region but also tectonic belts that control the distribution of mineralization.Under the interaction of these faults,they form the basic structural pattern of the east-west zone and the north-south block.The NE faults have the largest scale and obviously control the diff erent magnetic fi elds and magmatic activities.The results can provide a reference for further study of the distribution and activity characteristics of magmatic rocks in the coastal zone. 展开更多
关键词 aeromagnetic data magnetic field characteristics fault structure features the south of taizhou the coastal zone
下载PDF
Research on overall assembling and welding process of steel box girder tuyere blocks of Taizhou Bridge
10
作者 Yan Shiguang Li Hongtao Wang Chao 《Engineering Sciences》 EI 2012年第3期21-25,共5页
This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding... This article presents in detail the assembling and welding process technique of the steel box girder tuyere blocks of Taizhou Bridge. The application of this process technique effectively solves the problem of welding stress release in tuyere block assembling and welding without increasing the number of turns of the blocks and overhead welding, thus avoiding possible structural deformation due to excessive accumulation of internal welding stress, greatly reducing the repeated deformation and correction work during assembling and welding, and ensuring the weld seam quality and overall dimensions of tuvere blocks of Taizhou Bridze. 展开更多
关键词 taizhou Bridge steel box girder TUYERE PROCESS
下载PDF
On the Translation and Introduction Strategy of Taizhou Hehe Culture
11
作者 LI Chun-feng 《Journal of Literature and Art Studies》 2019年第8期892-896,共5页
Taizhou Hehe Culture is a regional culture and core of Chinese Hehe Culture.On the circumstances of Chinese culture’s going out to world,this paper analyzes the translation and introduction strategy of Taizhou Hehe C... Taizhou Hehe Culture is a regional culture and core of Chinese Hehe Culture.On the circumstances of Chinese culture’s going out to world,this paper analyzes the translation and introduction strategy of Taizhou Hehe Culture,so as to inherit and innovate Taizhou regional culture and further promote the cultural communication between China and other countries. 展开更多
关键词 taizhou Hehe CULTURE TRANSLATION and INTRODUCTION FOREIGNIZATION DOMESTICATION
下载PDF
Technical research on control of caisson construction for the middle tower foundation of Taizhou Bridge
12
作者 Liu Jianbo Yang Yanhua Zhang Yongtao Du Song 《Engineering Sciences》 EI 2011年第2期9-13,45,共6页
The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream a... The real-time informational monitoring system is adopted in the construction of middle tower foundation of Taizhou Bridge for the first time. The geometric state of the caisson, the stress of upstream and downstream anchorage cables, underwater topography, the drag forces of the caisson cutting edge and frictional resistances of the sidewall and etc. are monitored in real time. According to the synthesized data analysis and decision-making system, the spatial states of the caisson are adjusted in time to locate and embed the deep water caisson precisely. The offset error of the caisson is less than 30 cm and the vertical error is 1/363 at the final stage. The control technology for construction of large caisson under deep water is concluded and would be helpful for the construction of bridge foundation in the future. 展开更多
关键词 taizhou Bridge caisson foundation control technology real-time monitoring system
下载PDF
On-site tests to estimate aquifer permeability of drainage area of south caisson anchorage construction of Taizhou Bridge
13
作者 Feng Zhaoxiang Zhao Yanrong 《Engineering Sciences》 EI 2011年第2期20-25,共6页
During the construction of the south caisson anchorage of Taizhou Bridge, the drainage area is located in the lower reaches of the Yangtze River and the permeability of stratums there is considerable. In order to main... During the construction of the south caisson anchorage of Taizhou Bridge, the drainage area is located in the lower reaches of the Yangtze River and the permeability of stratums there is considerable. In order to maintain progress and guarantee safety during the sinking of the caisson, water should be drained in the initial period. Subsequently, detailed information about the aquifer permeability is required to make sure that the drainage will proceed successfully, which consequently necessitates the on-site estimation of the aquifer permeability in the drainage area. Therefore, the traditional pumping test and slug test are implemented respectively on site. The comparison of computational results of these two tests indicates that they are consistent overall. Notwithstanding, as slug test can be conducted with portable facilities in a short time and the manipulation is easy and few people need to be involved, the advantages of slug test is conspicuous compared with the traditional pumping test. It could be speculated that slug test will gain a prevalent application in the measurement of aquifer permeability in the future. 展开更多
关键词 taizhou Bridge south-anchor caisson pumping test slug test
下载PDF
A Study of the system control model of caisson dewatering of the north anchorage of Taizhou Bridge
14
作者 Zhao Yanrong Zhou Zhifang Ruan Jing 《Engineering Sciences》 EI 2011年第2期26-32,共7页
A caisson foundation is applied to the north anchorage of Taizhou Yangtze River Highway Bridge of which the initial caisson sinking requires dewatering. Since the caisson foundation is quite close to nearby buildings,... A caisson foundation is applied to the north anchorage of Taizhou Yangtze River Highway Bridge of which the initial caisson sinking requires dewatering. Since the caisson foundation is quite close to nearby buildings, a system control model is established with source (sink) distribution and intensity being the object function, minimum requirements of settlement and deformation of surroundings caused by dewatering and dynamic water levels during different working procedures being constraints, and the design parameter of pumping wells being the variable,so as to lower the jeopardizing of surrounding buildings, which provides a new method for active control over settlement during dewatering. Such a method of dewatering based on system control model should be of significance for similar projects involving dewatering. 展开更多
关键词 taizhou Bridge caisson of north anchorage construction dewatering system control model
下载PDF
Design of steel box girder for Taizhou Yangtze River Highway Bridge
15
作者 Ding Lei Shan Hongwei Zhou Qing Zheng Benhui 《Engineering Sciences》 EI 2011年第2期57-63,共7页
Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technica... Taizhou Yangtze River Highway Bridge is the first three-pylon two-span suspension bridge in China. The main girder adopts flat steamline steel closed box girder which has well wind-resistant capability and is technically mature besides beautiful appearance. Straight web plates of the steel box girder in longitudinal direction are proposed in order to ensure the integrity of the steel box girder, and to keep the stress of the steel box girder continuous in the middle pylon, as well as to reduce the gradient of the middle pylon columns. The cross section of the box girder has one box with three cells. Solid-web diaphragm plate with good integrity and high torsional stiffness is adopted. The lifting lugs are utilized in the anchors of suspender cable. In this paper, selection of the cross section of the steel box girder, the general structure design, local structure design and main structure calculation results of Taizhou Yangtze River Bridge are introduced emphatically. 展开更多
关键词 taizhou Yangtze River Highway Bridge three-pylon suspension bridge steel box girder DESIGN
下载PDF
Construction techniques of super-length main cable of Taizhou Bridge
16
作者 Shen Liangcheng Liang Jinda 《Engineering Sciences》 EI 2011年第2期51-56,共6页
Taizhou Bridge is a highway three-pylon two-span bridge with span arrangement of 1 080 m + 1 080 m and the length of the main cable is more than 3 100 m. It is the longest cable in China. As the erection of the main c... Taizhou Bridge is a highway three-pylon two-span bridge with span arrangement of 1 080 m + 1 080 m and the length of the main cable is more than 3 100 m. It is the longest cable in China. As the erection of the main cable needs to cross over three towers and the cables undulate acutely, general problems like the twist, spread and swell of strands and shedding of the zinc coating are prone to arise, which make it difficult to guarantee the quantity of cable traction construction. In this paper, the hauling, shaping and saddling of strands and sag adjusting are illustrated in detail and how to execute the refined construction control to guarantee the erection quality is also covered. 展开更多
关键词 taizhou Bridge super-length main cable CONSTRUCTION
下载PDF
Comparison of seismic capacity/demand ratios of two kinds of foundation schemes of Taizhou Bridge
17
作者 Zhao Yi Peng Tianbo Han Lei 《Engineering Sciences》 EI 2012年第3期26-32,共7页
Pile group foundation and caisson foundation are two common foundation schemes of long-span bridges, and the seismic performances of the two kinds of foundations are different. Taking Taizhou Bridge as an example, whi... Pile group foundation and caisson foundation are two common foundation schemes of long-span bridges, and the seismic performances of the two kinds of foundations are different. Taking Taizhou Bridge as an example, which is the first kilometer level three-pylon two-span suspension bridge in the world, two foundation schemes are designed for the middle pylon, and two whole bridge models with two different foundation schemes of the middle pylon are established respectively in this paper. The effects of foundation-soil interaction are simulated by equivalent linear soil springs whose stiffnesses are calculated according to m method. Seismic capacity/demand ratios of the two models are calculated. The following conclusions can be drawn: the weak positions of the two schemes are not the same; if caisson foundation is adopted for the middle pylon, the weak position is the bearing capacity of the middle pylon foundation, while if pile group foundation is adopted for the middle pylon, the weak position is the bearing capacity of the side pylon foundation. 展开更多
关键词 taizhou Bridge FOUNDATION capacity/demand ratio
下载PDF
Research on subsidence method aided by water injection and its engineering application for the north anchor of Taizhou Bridge
18
作者 Ruan Jing Zhou Zhifang Zhao Yanrong 《Engineering Sciences》 EI 2011年第2期33-38,共6页
The north anchorage caisson of Taizhou Bridge encountered some difficulties during the sinking process for the large sidewall frictional resistances. To solve this problem, a new concept and method called subsidence m... The north anchorage caisson of Taizhou Bridge encountered some difficulties during the sinking process for the large sidewall frictional resistances. To solve this problem, a new concept and method called subsidence method aided by water injection is proposed. Numeral analysis is adopted to simulate the effects of this method for the north anchor of Taizhou Bridge, which confirmed the feasibility and validity. Finally, the method is applied to the north anchor caisson during the caisson sinking procedure and helps the caisson sink and embed to the designed position smoothly. 展开更多
关键词 ANCHORAGE SINK taizhou Bridge subsidence method aided by water injection
下载PDF
A Study on Improving the Financing Environment of Small and Micro Enterprises-Based on Taizhou Model
19
作者 Jieping Cai Aijia Wang 《Proceedings of Business and Economic Studies》 2022年第1期20-26,共7页
China’s small and micro enterprises have always had the typical characteristics of“five,six,seven,eight,nine,”which are important supports to expand employment and improve people’s livelihood.However,the current p... China’s small and micro enterprises have always had the typical characteristics of“five,six,seven,eight,nine,”which are important supports to expand employment and improve people’s livelihood.However,the current proportion of these enterprises in obtaining bank loans does not commensurate with the proportion of small,medium,and micro enterprises in the total economic aggregate.The financing dilemma of small and micro enterprises still exists.In consideration of the financing status of small and micro enterprises,this study analyzes the constraints of small and micro enterprises in financing,such as the difficulty in mortgage,difficulty in obtaining loans,and difficulty in guaranteeing.This study sorts out Taizhou’s practical experience and links its operation mechanism of“two platforms,one fund,and one index.”Finally,by learning from its successful experience,how to utilize the environment and the trend of big data will be further discussed,so as to form a scalable and sustainable financing method and path.This will provide a reference for improving the financing environment of small and micro enterprises. 展开更多
关键词 Small and micro enterprises FINANCING taizhou “Two platforms one fund and one index” Financing environment
下载PDF
Education Gathering Steam-An Interview with Yang Renzheng, Mayor of Taizhou City
20
《China Today》 2000年第10期15-15,共1页
关键词 In Mayor of taizhou City Education Gathering Steam-An Interview with Yang Renzheng
下载PDF
上一页 1 2 67 下一页 到第
使用帮助 返回顶部