The concrete hydration heat release process of the base plate is monitored using Roman optical time domain reflectometry(ROTDR) sensing sensors. The monitoring data shows that the internal maximum temperature of the...The concrete hydration heat release process of the base plate is monitored using Roman optical time domain reflectometry(ROTDR) sensing sensors. The monitoring data shows that the internal maximum temperature of the base plate is about 54 ℃ after the concrete was cured for 120 h. The fiber Bragg grating (FBG) temperature sensors are adopted to measure the surface temperature of the concrete and the temperature results are used to compensate the data measured by the pulse-prepump Brillouin optical time-domain analyzer (PPP-BOTDA) to obtain the real concrete surface strain of the base plate. The monitoring data is analyzed to obtain a clear understanding of the strain state of the base plate under the effect of concrete hydration heat release. The monitoring results demonstrate the potential of distributed optical fibre sensing techniques as a powerful tool in real-time construction monitoring, and also provide an important insight into the design, construction and maintenance of large hydraulic structures.展开更多
In order to monitor the deformations of modern constructions a local 3D network was usually being established at the surrounding area. The centering error, of both the instrument and targets, causes significant uncert...In order to monitor the deformations of modern constructions a local 3D network was usually being established at the surrounding area. The centering error, of both the instrument and targets, causes significant uncertainties in the determination of the x, y, z coordinates of the network's points. In order to assure precise centering for both the instrument and targets, not only for the accessible but also for the inaccessible network's points, a prototype way of marking is being implied. A special semi-permanent portable metallic stand (Photo 1) was manufactured for marking the accessible points. The stand provides forced instrument centering of the order of_+0, lmm. It is light enough to carry, it accelerates and facilitates the centering and leveling of the instrument as well as it eliminates the time needed for the measurements. The applied laboratory checks in order to certify the suitability of its use and the provided accuracy are being described. For the inaccessible points special targets were used. The targets were put in permanent attachments (Photos 7-8), which were also manufactured. Useful conclusions were drawn when these special accessories were used in to a 3D network, which was established for the monitoring of a new football stadium. Two measurement phases were carried out. The first one is with the stadium empty and the second one is when it was crowded (about 32000 people) during a significant football match.展开更多
In this paper,the construction process of a cable-stayed bridge with corrugated steel webs was monitored.Moreover,the end performance of the bridge was verified by load test.Owing to the consideration of the bridge st...In this paper,the construction process of a cable-stayed bridge with corrugated steel webs was monitored.Moreover,the end performance of the bridge was verified by load test.Owing to the consideration of the bridge structure safety,it is necessary to monitor the main girder deflection,stress,construction error and safety state during construction.Furthermore,to verify whether the bridge can meet the design requirements,the static and dynamic load tests are carried out after the completion of the bridge.The results of construction monitoring show that the stress state of the structure during construction is basically consistent with the theoretical calculation and design requirements,and both meet the design and specification requirements.The final measured stress state of the structure is within the allowable range of the cable-stayed bridge,and the stress state of the structure is normal and meets the specification requirements.The results of load tests show that the measured deflection values of the mid-span section of the main girder are less than the theoretical calculation values.The maximum deflection of the girder is−20.90 mm,which is less than−22.00 mm of the theoretical value,indicating that the girder has sufficient structural stiffness.The maximum impact coefficient under dynamic load test is 1.08,which is greater than 1.05 of theoretical value,indicating that the impact effect of heavy-duty truck on this type of bridge is larger.This study can provide important reference value for construction and maintenance of similar corrugated steel web cable-stayed bridges.展开更多
To better understand the mechanical properties of marble at Jinping II hydropower station, this paper examines the changes of brittle rocks in excavation damaged zones(EDZs) before and after excavation of tunnel with ...To better understand the mechanical properties of marble at Jinping II hydropower station, this paper examines the changes of brittle rocks in excavation damaged zones(EDZs) before and after excavation of tunnel with the tunnel boring machine(TBM). The paper attempts to employ the acoustic emission(AE) to study the AE characteristics and distribution of rockburst before and after TBM-excavated tunnel. It is known that the headrace tunnel #2, excavated by the drill-and-blast(D&B) method, is ahead of the headrace tunnel #3 that is excavated by TBM method. The experimental sub-tunnel #2–1, about 2000 m in depth and 13 m in diameter, between the two tunnels is scheduled. In the experimental sub-tunnel #2–1, a large number of experimental boreholes are arranged, and AE sensors are installed within 10 m apart from the wall of the headrace tunnel #3. By tracking the microseismic signals in rocks, the location, frequency, quantity, scope and intensity of the microseismic signals are basically identifed. It is observed that the AE signals mainly occur within 5 m around the rock wall, basically lasting for one day before tunnel excavation and a week after excavation. Monitoring results indicate that the rockburst signals are closely related to rock stress adjustment. The rock structure has a rapid self-adjustment capacity before and after a certain period of time during tunneling. The variations of rock stresses would last for a long time before reaching a fnal steady state. Based on this, the site-specifc support parameters for the deep tunnels can be accordingly optimized.展开更多
Gonghe bridge is a double level cable-stayed concrete bridge with a single-cable-plane of single cable tower. Its span is 114+120 m and a whole length of 236 m. The gliding scaffold equipment is used for the first tim...Gonghe bridge is a double level cable-stayed concrete bridge with a single-cable-plane of single cable tower. Its span is 114+120 m and a whole length of 236 m. The gliding scaffold equipment is used for the first time in the long span cable-stayed bridge construction to reduce the construction time limit. In the process of construction, to make sure a safe connection among concrete objects with different ages, the single-supporting and single-suspension system is adopted before the concrete pouring. While the double-supporting and single-suspension system is applied after con- crete pouring. These construction systems with gliding scaffold equipment are first introduced in long span ca- ble-stayed bridge and presented in detail[1]. The practice shows that these gliding scaffold systems have many advan- tages over the traditional ones.展开更多
The spiral assembly steel structure, a newly developed retaining wall for the rapid excavation of small-sized foundation pits in unsaturated soil, is presented. This new type of retaining structure is prefabricated in...The spiral assembly steel structure, a newly developed retaining wall for the rapid excavation of small-sized foundation pits in unsaturated soil, is presented. This new type of retaining structure is prefabricated in the factory and is assembled on site in the excavation of a pit. This retaining structure is composed of several prefabricated steel structural units, in which the adjacent steel structural units are joined with connectors. Each steel structural unit has one steel pipe in the radial direction and is welded to a single piece of steel plate. After full installation in situ, the retaining structure becomes a cylindrical steel structure. With the protection afforded by this new type of retaining structure, excavation work can be completed within 24 h to a depth up to 5 m. In order to verify the reliability and effectiveness of this new retaining structure, field construction tests were conducted in Beijing, China. The test construction was monitored. The monitoring program included measuring stress in the structure, lateral earth pressure, and lateral deformation of the surrounding soil. The monitoring data from the field test were compared with the theoretical results. The results show that the proposed new structure is reliable and effective.展开更多
With the fast development of consumer-level RGB-D cameras, real-world indoor three-dimensional(3 D) scene modeling and robotic applications are gaining more attention. However, indoor 3 D scene modeling is still chall...With the fast development of consumer-level RGB-D cameras, real-world indoor three-dimensional(3 D) scene modeling and robotic applications are gaining more attention. However, indoor 3 D scene modeling is still challenging because the structure of interior objects may be complex and the RGB-D data acquired by consumer-level sensors may have poor quality. There is a lot of research in this area. In this survey, we provide an overview of recent advances in indoor scene modeling methods, public indoor datasets and libraries which can facilitate experiments and evaluations, and some typical applications using RGB-D devices including indoor localization and emergency evacuation.展开更多
基金The National Key Technology R&D Program during the 12th Five-Year Plan Period(No.2012BAK10B05)the State Key Program of National Natural Science of China(No.41427801)
文摘The concrete hydration heat release process of the base plate is monitored using Roman optical time domain reflectometry(ROTDR) sensing sensors. The monitoring data shows that the internal maximum temperature of the base plate is about 54 ℃ after the concrete was cured for 120 h. The fiber Bragg grating (FBG) temperature sensors are adopted to measure the surface temperature of the concrete and the temperature results are used to compensate the data measured by the pulse-prepump Brillouin optical time-domain analyzer (PPP-BOTDA) to obtain the real concrete surface strain of the base plate. The monitoring data is analyzed to obtain a clear understanding of the strain state of the base plate under the effect of concrete hydration heat release. The monitoring results demonstrate the potential of distributed optical fibre sensing techniques as a powerful tool in real-time construction monitoring, and also provide an important insight into the design, construction and maintenance of large hydraulic structures.
文摘In order to monitor the deformations of modern constructions a local 3D network was usually being established at the surrounding area. The centering error, of both the instrument and targets, causes significant uncertainties in the determination of the x, y, z coordinates of the network's points. In order to assure precise centering for both the instrument and targets, not only for the accessible but also for the inaccessible network's points, a prototype way of marking is being implied. A special semi-permanent portable metallic stand (Photo 1) was manufactured for marking the accessible points. The stand provides forced instrument centering of the order of_+0, lmm. It is light enough to carry, it accelerates and facilitates the centering and leveling of the instrument as well as it eliminates the time needed for the measurements. The applied laboratory checks in order to certify the suitability of its use and the provided accuracy are being described. For the inaccessible points special targets were used. The targets were put in permanent attachments (Photos 7-8), which were also manufactured. Useful conclusions were drawn when these special accessories were used in to a 3D network, which was established for the monitoring of a new football stadium. Two measurement phases were carried out. The first one is with the stadium empty and the second one is when it was crowded (about 32000 people) during a significant football match.
基金We would like to express our deep gratitude to the 2021 Liaoning Province Doctoral Research Start-Up Fund Project(2021-BS-168)for financial support.
文摘In this paper,the construction process of a cable-stayed bridge with corrugated steel webs was monitored.Moreover,the end performance of the bridge was verified by load test.Owing to the consideration of the bridge structure safety,it is necessary to monitor the main girder deflection,stress,construction error and safety state during construction.Furthermore,to verify whether the bridge can meet the design requirements,the static and dynamic load tests are carried out after the completion of the bridge.The results of construction monitoring show that the stress state of the structure during construction is basically consistent with the theoretical calculation and design requirements,and both meet the design and specification requirements.The final measured stress state of the structure is within the allowable range of the cable-stayed bridge,and the stress state of the structure is normal and meets the specification requirements.The results of load tests show that the measured deflection values of the mid-span section of the main girder are less than the theoretical calculation values.The maximum deflection of the girder is−20.90 mm,which is less than−22.00 mm of the theoretical value,indicating that the girder has sufficient structural stiffness.The maximum impact coefficient under dynamic load test is 1.08,which is greater than 1.05 of theoretical value,indicating that the impact effect of heavy-duty truck on this type of bridge is larger.This study can provide important reference value for construction and maintenance of similar corrugated steel web cable-stayed bridges.
文摘To better understand the mechanical properties of marble at Jinping II hydropower station, this paper examines the changes of brittle rocks in excavation damaged zones(EDZs) before and after excavation of tunnel with the tunnel boring machine(TBM). The paper attempts to employ the acoustic emission(AE) to study the AE characteristics and distribution of rockburst before and after TBM-excavated tunnel. It is known that the headrace tunnel #2, excavated by the drill-and-blast(D&B) method, is ahead of the headrace tunnel #3 that is excavated by TBM method. The experimental sub-tunnel #2–1, about 2000 m in depth and 13 m in diameter, between the two tunnels is scheduled. In the experimental sub-tunnel #2–1, a large number of experimental boreholes are arranged, and AE sensors are installed within 10 m apart from the wall of the headrace tunnel #3. By tracking the microseismic signals in rocks, the location, frequency, quantity, scope and intensity of the microseismic signals are basically identifed. It is observed that the AE signals mainly occur within 5 m around the rock wall, basically lasting for one day before tunnel excavation and a week after excavation. Monitoring results indicate that the rockburst signals are closely related to rock stress adjustment. The rock structure has a rapid self-adjustment capacity before and after a certain period of time during tunneling. The variations of rock stresses would last for a long time before reaching a fnal steady state. Based on this, the site-specifc support parameters for the deep tunnels can be accordingly optimized.
文摘Gonghe bridge is a double level cable-stayed concrete bridge with a single-cable-plane of single cable tower. Its span is 114+120 m and a whole length of 236 m. The gliding scaffold equipment is used for the first time in the long span cable-stayed bridge construction to reduce the construction time limit. In the process of construction, to make sure a safe connection among concrete objects with different ages, the single-supporting and single-suspension system is adopted before the concrete pouring. While the double-supporting and single-suspension system is applied after con- crete pouring. These construction systems with gliding scaffold equipment are first introduced in long span ca- ble-stayed bridge and presented in detail[1]. The practice shows that these gliding scaffold systems have many advan- tages over the traditional ones.
基金Project(41202220)supported by the National Natural Science Foundation of ChinaProject(20120022120003)supported by the Research Fund for the Doctoral Program of Higher Education,China+1 种基金Project(2652012065)supported by the Fundamental Research Funds for the Central Universities of ChinaProject(2013006)supported by the Research Fund for Key Laboratory on Deep Geo Drilling Technology,Ministry of Land and Resources,China
文摘The spiral assembly steel structure, a newly developed retaining wall for the rapid excavation of small-sized foundation pits in unsaturated soil, is presented. This new type of retaining structure is prefabricated in the factory and is assembled on site in the excavation of a pit. This retaining structure is composed of several prefabricated steel structural units, in which the adjacent steel structural units are joined with connectors. Each steel structural unit has one steel pipe in the radial direction and is welded to a single piece of steel plate. After full installation in situ, the retaining structure becomes a cylindrical steel structure. With the protection afforded by this new type of retaining structure, excavation work can be completed within 24 h to a depth up to 5 m. In order to verify the reliability and effectiveness of this new retaining structure, field construction tests were conducted in Beijing, China. The test construction was monitored. The monitoring program included measuring stress in the structure, lateral earth pressure, and lateral deformation of the surrounding soil. The monitoring data from the field test were compared with the theoretical results. The results show that the proposed new structure is reliable and effective.
基金Project supported by the National Natural Science Foundation of China (Nos. 71901147, 41801392, 41901329, 41971354, and 41971341)the Research Program of Shenzhen S&T Innovation Committee,China (No. JCYJ20180305125131482)+5 种基金the Open Fund of Key Laboratory of Urban Land Resources Monitoring and Simulation,MNR,China (Nos. KF-2019-04-010, KF-2019-04-014, and KF-2018-03-066)the Natural Science Foundation of Guangdong Province,China (Nos. 2019A1515010748 and 2019A1515011872)the Foundation of High-Level University Phase II,China (No. 000002110335)the Foundation of Shenzhen University for New Researchers,China (No. 2019056)the Innovation Team Program of Department Education of Guangdong Province,China (No. 2017KCXTD028)the Guangdong Science and Technology Strategic Innovation Fund (the Guangdong–Hong Kong–Macao Joint Laboratory Program)(No. 2020B1212030009)。
文摘With the fast development of consumer-level RGB-D cameras, real-world indoor three-dimensional(3 D) scene modeling and robotic applications are gaining more attention. However, indoor 3 D scene modeling is still challenging because the structure of interior objects may be complex and the RGB-D data acquired by consumer-level sensors may have poor quality. There is a lot of research in this area. In this survey, we provide an overview of recent advances in indoor scene modeling methods, public indoor datasets and libraries which can facilitate experiments and evaluations, and some typical applications using RGB-D devices including indoor localization and emergency evacuation.