A complex seepage flow field with unknown free surface was formed in the Shanghai Laogang Municipal Solid Waste (MSW) Landfill by the perimeter cut-off wall around the landfill site and the Prefabricated Vertical Dr...A complex seepage flow field with unknown free surface was formed in the Shanghai Laogang Municipal Solid Waste (MSW) Landfill by the perimeter cut-off wall around the landfill site and the Prefabricated Vertical Drains (PVD) in the foundation of landfill. First, the equivalent vertical permeability was presented based on the drainage mechanism of PVD and the related calculation method was studied to macroscopically reflect the impact of PVD on the seepage flow status of the landfill foundation. With the influence of the cut-off wall and the PVD on the infiltration of groundwater, the total inflow was classified into two parts: the lateral inflow through the cut-off wall outside the landfill, and the upward infiltration through the PVD from the foundation of the landfill. Seepage analysis was conducted using the finite element method according to the actual scenario of Laogang Landfill, and the lateral infiltration and the upward infiltration were calculated, respectively. The results show that the total inflow into the landfill area was mostly supplied by the upward infiltration through the PVD and the perimeter cut-off wall was significantly effective to depressurize the seepage pressure and to reduce the flow rate.展开更多
基金Project supported by the National Natural Science Foundation of China (Grant No: 40201024)
文摘A complex seepage flow field with unknown free surface was formed in the Shanghai Laogang Municipal Solid Waste (MSW) Landfill by the perimeter cut-off wall around the landfill site and the Prefabricated Vertical Drains (PVD) in the foundation of landfill. First, the equivalent vertical permeability was presented based on the drainage mechanism of PVD and the related calculation method was studied to macroscopically reflect the impact of PVD on the seepage flow status of the landfill foundation. With the influence of the cut-off wall and the PVD on the infiltration of groundwater, the total inflow was classified into two parts: the lateral inflow through the cut-off wall outside the landfill, and the upward infiltration through the PVD from the foundation of the landfill. Seepage analysis was conducted using the finite element method according to the actual scenario of Laogang Landfill, and the lateral infiltration and the upward infiltration were calculated, respectively. The results show that the total inflow into the landfill area was mostly supplied by the upward infiltration through the PVD and the perimeter cut-off wall was significantly effective to depressurize the seepage pressure and to reduce the flow rate.