It always adopts the direct hierarchy analysis to value the exploitation conditions of surface mining areas. This way has some unavoidable shortcomings because it is mainly under the aid of experts and it is affected ...It always adopts the direct hierarchy analysis to value the exploitation conditions of surface mining areas. This way has some unavoidable shortcomings because it is mainly under the aid of experts and it is affected by the subjective thinking of the experts. This paper puts forwards a new approach that divides the whole exploitation conditions into sixteen subsidiary systems and each subsidiary system forms a neural network system. The whole decision system of exploitation conditions of surface mining areas is composed of sixteen subsidiary neural network systems. Each neural network is practiced with the data of the worksite, which is reasonable and scientific. This way will be a new decision approach for exploiting the surface mining areas.展开更多
To understand the resource features and geology in the deep Jinchuan nickel deposit, difficult geological conditions were systematically analyzed, including high stress, fragmentized ore rock, prevalent deformation, d...To understand the resource features and geology in the deep Jinchuan nickel deposit, difficult geological conditions were systematically analyzed, including high stress, fragmentized ore rock, prevalent deformation, difficult tunnel support, complicated rock mechanics, and low mining recovery. An integrated technology package was built for safe, efficient, and continuous mining in a deep, massive, and complex nickel and cobalt mine. This was done by the invention of a large-area continuous mining method with honeycomb drives; the establishment of ground control theory and a technology package for high-stress and fragmented ore rock: and the development of a new type of backfilling cement material, along with a deep backfilling technology that comprises the pipeline transport of high-density slurry with coarse aggregates. In this way, good solutions to existing problems were found to permit the efficient exploitation and comprehensive utilization of the resources in the deep Jinchuan nickel mine. In addition, a technological demonstration in an underground mine was performed using the cemented undercut-and-fill mining method for stressful, frag- mented, and rheological rock.展开更多
文摘It always adopts the direct hierarchy analysis to value the exploitation conditions of surface mining areas. This way has some unavoidable shortcomings because it is mainly under the aid of experts and it is affected by the subjective thinking of the experts. This paper puts forwards a new approach that divides the whole exploitation conditions into sixteen subsidiary systems and each subsidiary system forms a neural network system. The whole decision system of exploitation conditions of surface mining areas is composed of sixteen subsidiary neural network systems. Each neural network is practiced with the data of the worksite, which is reasonable and scientific. This way will be a new decision approach for exploiting the surface mining areas.
文摘To understand the resource features and geology in the deep Jinchuan nickel deposit, difficult geological conditions were systematically analyzed, including high stress, fragmentized ore rock, prevalent deformation, difficult tunnel support, complicated rock mechanics, and low mining recovery. An integrated technology package was built for safe, efficient, and continuous mining in a deep, massive, and complex nickel and cobalt mine. This was done by the invention of a large-area continuous mining method with honeycomb drives; the establishment of ground control theory and a technology package for high-stress and fragmented ore rock: and the development of a new type of backfilling cement material, along with a deep backfilling technology that comprises the pipeline transport of high-density slurry with coarse aggregates. In this way, good solutions to existing problems were found to permit the efficient exploitation and comprehensive utilization of the resources in the deep Jinchuan nickel mine. In addition, a technological demonstration in an underground mine was performed using the cemented undercut-and-fill mining method for stressful, frag- mented, and rheological rock.