With the rapid development of cloud computing,edge computing,and smart devices,computing power resources indicate a trend of ubiquitous deployment.The traditional network architecture cannot efficiently leverage these...With the rapid development of cloud computing,edge computing,and smart devices,computing power resources indicate a trend of ubiquitous deployment.The traditional network architecture cannot efficiently leverage these distributed computing power resources due to computing power island effect.To overcome these problems and improve network efficiency,a new network computing paradigm is proposed,i.e.,Computing Power Network(CPN).Computing power network can connect ubiquitous and heterogenous computing power resources through networking to realize computing power scheduling flexibly.In this survey,we make an exhaustive review on the state-of-the-art research efforts on computing power network.We first give an overview of computing power network,including definition,architecture,and advantages.Next,a comprehensive elaboration of issues on computing power modeling,information awareness and announcement,resource allocation,network forwarding,computing power transaction platform and resource orchestration platform is presented.The computing power network testbed is built and evaluated.The applications and use cases in computing power network are discussed.Then,the key enabling technologies for computing power network are introduced.Finally,open challenges and future research directions are presented as well.展开更多
As an open network architecture,Wireless Computing PowerNetworks(WCPN)pose newchallenges for achieving efficient and secure resource management in networks,because of issues such as insecure communication channels and...As an open network architecture,Wireless Computing PowerNetworks(WCPN)pose newchallenges for achieving efficient and secure resource management in networks,because of issues such as insecure communication channels and untrusted device terminals.Blockchain,as a shared,immutable distributed ledger,provides a secure resource management solution for WCPN.However,integrating blockchain into WCPN faces challenges like device heterogeneity,monitoring communication states,and dynamic network nature.Whereas Digital Twins(DT)can accurately maintain digital models of physical entities through real-time data updates and self-learning,enabling continuous optimization of WCPN,improving synchronization performance,ensuring real-time accuracy,and supporting smooth operation of WCPN services.In this paper,we propose a DT for blockchain-empowered WCPN architecture that guarantees real-time data transmission between physical entities and digital models.We adopt an enumeration-based optimal placement algorithm(EOPA)and an improved simulated annealing-based near-optimal placement algorithm(ISAPA)to achieve minimum average DT synchronization latency under the constraint of DT error.Numerical results show that the proposed solution in this paper outperforms benchmarks in terms of average synchronization latency.展开更多
Along with the increasing integration of renewable energy generation in AC-DC power networks,investigating the dynamic behaviors of this complex system with a proper equivalent model is significant.This paper presents...Along with the increasing integration of renewable energy generation in AC-DC power networks,investigating the dynamic behaviors of this complex system with a proper equivalent model is significant.This paper presents an equivalent modeling method for the AC-DC power networks with doubly-fed induction generator(DFIG)based wind farms to decrease the simulation scale and computational burden.For the AC-DC power networks,the equivalent modeling strategy in accordance with the physical structure simplification is stated.Regarding the DFIG-based wind farms,the equivalent modeling based on the sequential identification of multi-machine parameters using the improved chaotic cuckoo search algorithm(ICCSA)is conducted.In light of the MATLAB simulation platform,a two-zone four-DC interconnected power grid with wind farms is built to check the efficacy of the proposed equivalentmodelingmethod.Fromthe simulation analyses and comparative validation in different algorithms and cases,the proposed method can precisely reflect the steady and dynamic performance of the demonstrated system under N-1 and N-2 fault scenarios,and it can efficiently achieve the parameter identification of the wind farms and fulfill the equivalent modeling.Consequently,the proposed approach’s effectiveness and suitability are confirmed.展开更多
In light of the situation that the nationwide interconnection of power networks in China in the coming years will take shape, it is imperative to emphasize the importance of setting up rational power network configura...In light of the situation that the nationwide interconnection of power networks in China in the coming years will take shape, it is imperative to emphasize the importance of setting up rational power network configuration. Combined with the characteristics of regional power networks in China, problems in network planning that need to be solved are put forward in this paper, such as, the access of power plants to grid by layers and zones, the share of external power in the load of local network, the power network configuration study in-depth in planning and design stage, and enforcement of receiving-end power network trunk etc. The background of these problems and their countermeasures are also analyzed in the paper.展开更多
In 6G era,service forms in which computing power acts as the core will be ubiquitous in the network.At the same time,the collaboration among edge computing,cloud computing and network is needed to support edge computi...In 6G era,service forms in which computing power acts as the core will be ubiquitous in the network.At the same time,the collaboration among edge computing,cloud computing and network is needed to support edge computing service with strong demand for computing power,so as to realize the optimization of resource utilization.Based on this,the article discusses the research background,key techniques and main application scenarios of computing power network.Through the demonstration,it can be concluded that the technical solution of computing power network can effectively meet the multi-level deployment and flexible scheduling needs of the future 6G business for computing,storage and network,and adapt to the integration needs of computing power and network in various scenarios,such as user oriented,government enterprise oriented,computing power open and so on.展开更多
At present, lightning is one of the 10 natural disasters, and it is also the top environmental factor of power interruption. It often causes huge losses to the electric system. The Wuhan High Voltage Institute of the ...At present, lightning is one of the 10 natural disasters, and it is also the top environmental factor of power interruption. It often causes huge losses to the electric system. The Wuhan High Voltage Institute of the State Grid Corporation of China and Huazhong University of Science and Technology have been researching and developing lightning location systems (LLSs) since the late 1980s. In the mid-1990s, a lightning detection network was created in 29 provinces and cities in China. It is primarily applied to rapidly find lightning accidents, which greatly reduces power interruption. Also, it ensures high efficiency and safe operation of the electricity system. Remarkable benefit is achieved. China's LLS went through an "orientation positioning - time difference positioning - integrated positioning" development process. The positioning precision, detection efficiency, degree of automation, practicability and applied range are improved. Also, a lightning information system plan of the national network has been implemented, which services the whole society.展开更多
Unified Power Quality Controller(UPQC) was proposed to comprehensively improve power quality of coal mine power network and its basic structure and operation principle was introduced. In order to overcome time lag o...Unified Power Quality Controller(UPQC) was proposed to comprehensively improve power quality of coal mine power network and its basic structure and operation principle was introduced. In order to overcome time lag of Active Power Filter(APF) in compensating harmonic and reactive current, a novel method based on gray system theory was proposed to predict harmonic current and other distortion component. The mathematical model of component to be compensated was constructed by data sequence of distortion component, which could exactly forecast compensation signal of next period. The optimal control strategy was selected according to the principle of output signal approaching component to be compensated as near as possible. Before predicating each time the oldest data was eliminated while the latest data was added to data sequence. Then new predication model was established once again. The results show that the method can always construct mathematical model with variation of system parameters, reflect the latest state of system and not increase calculation quantity. The feasible and effective control strategy can improve power quality of coal mine power network.展开更多
This paper introduces the selection and scheme demonstration of higher voltage class in Northwest ChinaPower Network, and conclusions made by main research institutes and experts’ comments.[
This paper introduces the development of technology and its measures for city power network in China, looks forward to the prospect of development in forthcoming decade and the technical principles to be adopted.
Rural power network planning is a complicated nonlinear optimized combination problem which based on load forecasting results, and its actual load is affected by many uncertain factors, which influenced optimization r...Rural power network planning is a complicated nonlinear optimized combination problem which based on load forecasting results, and its actual load is affected by many uncertain factors, which influenced optimization results of rural power network planning. To solve the problems, the interval algorithm was used to modify the initial search method of uncertainty load mathematics model in rural network planning. Meanwhile, the genetic/tabu search combination algorithm was adopted to optimize the initialized network. The sample analysis results showed that compared with the certainty planning, the improved method was suitable for urban medium-voltage distribution network planning with consideration of uncertainty load and the planning results conformed to the reality.展开更多
In view of the serious reactive power loss in the rural network, improved ant colony optimization algorithm (ACOA) was used to optimize the reactive power compensation for the rural distribution system. In this stud...In view of the serious reactive power loss in the rural network, improved ant colony optimization algorithm (ACOA) was used to optimize the reactive power compensation for the rural distribution system. In this study, the traditional ACOA was improved in two aspects: one was the local search strategy, and the other was pheromone mutation and re-initialization strategies. The reactive power optimization for a county's distribution network showed that the improved ACOA was practicable.展开更多
The autotransformer(AT)neutral current ratio method is widely used for fault location in the AT traction power network.With the development of high-speed electrified railways,a large number of data show that the relat...The autotransformer(AT)neutral current ratio method is widely used for fault location in the AT traction power network.With the development of high-speed electrified railways,a large number of data show that the relation between the AT neutral current ratio and the distance from the beginning of the fault AT section to the fault point(Q-L relation)is mostly nonlinear.Therefore,the linear Q-L relation in the traditional fault location method always leads to large errors.To solve this problem,a large number of load-related current data that can be used to describe the Q-L relation are obtained through the load test of the electric multiple unit(EMU).Thus,an improved fault location method based on the back propagation(BP)neural network is proposed in this paper.On this basis,a comparison between the improved method and the traditional method shows that the maximum absolute error and the average absolute error of the improved method are 0.651 km and 0.334 km lower than those of the traditional method,respectively,which demonstrates that the improved method can effectively eliminate the influence of nonlinear factors and greatly improve the accuracy of fault location for the AT traction power network.Finally,combined with a shortcircuit test,the accuracy of the improved method is verified.展开更多
Along with the further development of science and technology, computer hardware and the Intemet are in a rapid development, and information technology has been widely used in all fields so that complex problems are si...Along with the further development of science and technology, computer hardware and the Intemet are in a rapid development, and information technology has been widely used in all fields so that complex problems are simply solved. Because of the needs for the development, software starts to mutually integrate with complex power network, making the scale of software increase greatly. Such a growing trend of software promotes soft-ware development to go beyond a general understanding and control and thus a complex system is formed. It is necessary to strengthen the research of complex network theory, and this is a new way to help people study the complexity of software systems. In this paper, the development course of complex dynamic network is introduced simply and the use of complex power network in the software engineering is summarized. Hopefully, this paper can help the crossover study of complex power network and software engineering in the future.展开更多
This paper describes briefly the results of construction and retrofit of rural power networks in West China's 12 provinces (regions). A large number of power lines and sub stations were newly built and updated. Th...This paper describes briefly the results of construction and retrofit of rural power networks in West China's 12 provinces (regions). A large number of power lines and sub stations were newly built and updated. The rate of power penetration of townships, villages and peasant households was grown significantly. The rate of line loss dropped great ly. Power-supply reliability was improved clearly. The 'same network, same price' of urban and rural residential con sumption was brought about, and sales price to peasant households lowered substantially.展开更多
This paper presents the modelling, simulation and analysis of the dynamic behaviour of a mixed power network of 2.78 GW including hydro, thermal and wind power plants. The modelling of each power plant is described. T...This paper presents the modelling, simulation and analysis of the dynamic behaviour of a mixed power network of 2.78 GW including hydro, thermal and wind power plants. The modelling of each power plant is described. The set of parameters of the turbine speed governor of the hydroelectric power plant is determined with a specific identification procedure to achieve stable operation for different cases such as interconnected, isolated or islanded operation. The analysis of the stability of the entire mixed islanded power plant is investigated through time domain simulations for different sets of controllers parameters and for different disturbances (load rejection and turbulent wind speed profile).展开更多
基金supported by the National Science Foundation of China under Grant 62271062 and 62071063by the Zhijiang Laboratory Open Project Fund 2020LCOAB01。
文摘With the rapid development of cloud computing,edge computing,and smart devices,computing power resources indicate a trend of ubiquitous deployment.The traditional network architecture cannot efficiently leverage these distributed computing power resources due to computing power island effect.To overcome these problems and improve network efficiency,a new network computing paradigm is proposed,i.e.,Computing Power Network(CPN).Computing power network can connect ubiquitous and heterogenous computing power resources through networking to realize computing power scheduling flexibly.In this survey,we make an exhaustive review on the state-of-the-art research efforts on computing power network.We first give an overview of computing power network,including definition,architecture,and advantages.Next,a comprehensive elaboration of issues on computing power modeling,information awareness and announcement,resource allocation,network forwarding,computing power transaction platform and resource orchestration platform is presented.The computing power network testbed is built and evaluated.The applications and use cases in computing power network are discussed.Then,the key enabling technologies for computing power network are introduced.Finally,open challenges and future research directions are presented as well.
基金supported by the National Natural Science Foundation of China under Grant 62272391in part by the Key Industry Innovation Chain of Shaanxi under Grant 2021ZDLGY05-08.
文摘As an open network architecture,Wireless Computing PowerNetworks(WCPN)pose newchallenges for achieving efficient and secure resource management in networks,because of issues such as insecure communication channels and untrusted device terminals.Blockchain,as a shared,immutable distributed ledger,provides a secure resource management solution for WCPN.However,integrating blockchain into WCPN faces challenges like device heterogeneity,monitoring communication states,and dynamic network nature.Whereas Digital Twins(DT)can accurately maintain digital models of physical entities through real-time data updates and self-learning,enabling continuous optimization of WCPN,improving synchronization performance,ensuring real-time accuracy,and supporting smooth operation of WCPN services.In this paper,we propose a DT for blockchain-empowered WCPN architecture that guarantees real-time data transmission between physical entities and digital models.We adopt an enumeration-based optimal placement algorithm(EOPA)and an improved simulated annealing-based near-optimal placement algorithm(ISAPA)to achieve minimum average DT synchronization latency under the constraint of DT error.Numerical results show that the proposed solution in this paper outperforms benchmarks in terms of average synchronization latency.
基金supported by the Science and Technology Project of Central China Branch of State Grid Corporation of China under 5214JS220010.
文摘Along with the increasing integration of renewable energy generation in AC-DC power networks,investigating the dynamic behaviors of this complex system with a proper equivalent model is significant.This paper presents an equivalent modeling method for the AC-DC power networks with doubly-fed induction generator(DFIG)based wind farms to decrease the simulation scale and computational burden.For the AC-DC power networks,the equivalent modeling strategy in accordance with the physical structure simplification is stated.Regarding the DFIG-based wind farms,the equivalent modeling based on the sequential identification of multi-machine parameters using the improved chaotic cuckoo search algorithm(ICCSA)is conducted.In light of the MATLAB simulation platform,a two-zone four-DC interconnected power grid with wind farms is built to check the efficacy of the proposed equivalentmodelingmethod.Fromthe simulation analyses and comparative validation in different algorithms and cases,the proposed method can precisely reflect the steady and dynamic performance of the demonstrated system under N-1 and N-2 fault scenarios,and it can efficiently achieve the parameter identification of the wind farms and fulfill the equivalent modeling.Consequently,the proposed approach’s effectiveness and suitability are confirmed.
文摘In light of the situation that the nationwide interconnection of power networks in China in the coming years will take shape, it is imperative to emphasize the importance of setting up rational power network configuration. Combined with the characteristics of regional power networks in China, problems in network planning that need to be solved are put forward in this paper, such as, the access of power plants to grid by layers and zones, the share of external power in the load of local network, the power network configuration study in-depth in planning and design stage, and enforcement of receiving-end power network trunk etc. The background of these problems and their countermeasures are also analyzed in the paper.
基金This work was supported by the National Key R&D Program of China No.2019YFB1802800.
文摘In 6G era,service forms in which computing power acts as the core will be ubiquitous in the network.At the same time,the collaboration among edge computing,cloud computing and network is needed to support edge computing service with strong demand for computing power,so as to realize the optimization of resource utilization.Based on this,the article discusses the research background,key techniques and main application scenarios of computing power network.Through the demonstration,it can be concluded that the technical solution of computing power network can effectively meet the multi-level deployment and flexible scheduling needs of the future 6G business for computing,storage and network,and adapt to the integration needs of computing power and network in various scenarios,such as user oriented,government enterprise oriented,computing power open and so on.
文摘At present, lightning is one of the 10 natural disasters, and it is also the top environmental factor of power interruption. It often causes huge losses to the electric system. The Wuhan High Voltage Institute of the State Grid Corporation of China and Huazhong University of Science and Technology have been researching and developing lightning location systems (LLSs) since the late 1980s. In the mid-1990s, a lightning detection network was created in 29 provinces and cities in China. It is primarily applied to rapidly find lightning accidents, which greatly reduces power interruption. Also, it ensures high efficiency and safe operation of the electricity system. Remarkable benefit is achieved. China's LLS went through an "orientation positioning - time difference positioning - integrated positioning" development process. The positioning precision, detection efficiency, degree of automation, practicability and applied range are improved. Also, a lightning information system plan of the national network has been implemented, which services the whole society.
文摘Unified Power Quality Controller(UPQC) was proposed to comprehensively improve power quality of coal mine power network and its basic structure and operation principle was introduced. In order to overcome time lag of Active Power Filter(APF) in compensating harmonic and reactive current, a novel method based on gray system theory was proposed to predict harmonic current and other distortion component. The mathematical model of component to be compensated was constructed by data sequence of distortion component, which could exactly forecast compensation signal of next period. The optimal control strategy was selected according to the principle of output signal approaching component to be compensated as near as possible. Before predicating each time the oldest data was eliminated while the latest data was added to data sequence. Then new predication model was established once again. The results show that the method can always construct mathematical model with variation of system parameters, reflect the latest state of system and not increase calculation quantity. The feasible and effective control strategy can improve power quality of coal mine power network.
文摘This paper introduces the selection and scheme demonstration of higher voltage class in Northwest ChinaPower Network, and conclusions made by main research institutes and experts’ comments.[
文摘This paper introduces the development of technology and its measures for city power network in China, looks forward to the prospect of development in forthcoming decade and the technical principles to be adopted.
文摘Rural power network planning is a complicated nonlinear optimized combination problem which based on load forecasting results, and its actual load is affected by many uncertain factors, which influenced optimization results of rural power network planning. To solve the problems, the interval algorithm was used to modify the initial search method of uncertainty load mathematics model in rural network planning. Meanwhile, the genetic/tabu search combination algorithm was adopted to optimize the initialized network. The sample analysis results showed that compared with the certainty planning, the improved method was suitable for urban medium-voltage distribution network planning with consideration of uncertainty load and the planning results conformed to the reality.
基金Supported by China Postdoctoral Science Foundation(20090460873)
文摘In view of the serious reactive power loss in the rural network, improved ant colony optimization algorithm (ACOA) was used to optimize the reactive power compensation for the rural distribution system. In this study, the traditional ACOA was improved in two aspects: one was the local search strategy, and the other was pheromone mutation and re-initialization strategies. The reactive power optimization for a county's distribution network showed that the improved ACOA was practicable.
基金supported by the National Key Research and Development Program of China(No.2021YFB2601500)the Natural Science Foundation of Sichuan Province(No.2022NSFSC0405)。
文摘The autotransformer(AT)neutral current ratio method is widely used for fault location in the AT traction power network.With the development of high-speed electrified railways,a large number of data show that the relation between the AT neutral current ratio and the distance from the beginning of the fault AT section to the fault point(Q-L relation)is mostly nonlinear.Therefore,the linear Q-L relation in the traditional fault location method always leads to large errors.To solve this problem,a large number of load-related current data that can be used to describe the Q-L relation are obtained through the load test of the electric multiple unit(EMU).Thus,an improved fault location method based on the back propagation(BP)neural network is proposed in this paper.On this basis,a comparison between the improved method and the traditional method shows that the maximum absolute error and the average absolute error of the improved method are 0.651 km and 0.334 km lower than those of the traditional method,respectively,which demonstrates that the improved method can effectively eliminate the influence of nonlinear factors and greatly improve the accuracy of fault location for the AT traction power network.Finally,combined with a shortcircuit test,the accuracy of the improved method is verified.
文摘Along with the further development of science and technology, computer hardware and the Intemet are in a rapid development, and information technology has been widely used in all fields so that complex problems are simply solved. Because of the needs for the development, software starts to mutually integrate with complex power network, making the scale of software increase greatly. Such a growing trend of software promotes soft-ware development to go beyond a general understanding and control and thus a complex system is formed. It is necessary to strengthen the research of complex network theory, and this is a new way to help people study the complexity of software systems. In this paper, the development course of complex dynamic network is introduced simply and the use of complex power network in the software engineering is summarized. Hopefully, this paper can help the crossover study of complex power network and software engineering in the future.
文摘This paper describes briefly the results of construction and retrofit of rural power networks in West China's 12 provinces (regions). A large number of power lines and sub stations were newly built and updated. The rate of power penetration of townships, villages and peasant households was grown significantly. The rate of line loss dropped great ly. Power-supply reliability was improved clearly. The 'same network, same price' of urban and rural residential con sumption was brought about, and sales price to peasant households lowered substantially.
文摘This paper presents the modelling, simulation and analysis of the dynamic behaviour of a mixed power network of 2.78 GW including hydro, thermal and wind power plants. The modelling of each power plant is described. The set of parameters of the turbine speed governor of the hydroelectric power plant is determined with a specific identification procedure to achieve stable operation for different cases such as interconnected, isolated or islanded operation. The analysis of the stability of the entire mixed islanded power plant is investigated through time domain simulations for different sets of controllers parameters and for different disturbances (load rejection and turbulent wind speed profile).