Substituted plan in the environmental impact assessment (EIA) mainly means the treatment technology and the substituted site of plant, and it also includes the many kinds of environment protection measures. This paper...Substituted plan in the environmental impact assessment (EIA) mainly means the treatment technology and the substituted site of plant, and it also includes the many kinds of environment protection measures. This paper will make detailed analysis on the treatment technology, the substituted site of plant, the purpose of discharged water and the dispose of sludge in the Yongchuan wastewater treatment project.展开更多
In arid regions, large-scale water diversion from rivers leads to significant changes in river flow regimes, which may have large impacts on ecological water uses of river-dependent ecosystems, such as river, lake, we...In arid regions, large-scale water diversion from rivers leads to significant changes in river flow regimes, which may have large impacts on ecological water uses of river-dependent ecosystems, such as river, lake, wetland, and riparian ecosystems. To assess the integrated impact of water diversion on ecological water uses, we proposed a hierarchy evaluation model composed of four layers representing the evaluation goal, sub-areas of the influenced region, evaluation criteria, and water diversion schemes, respectively. The evaluation criteria for different types of ecological water uses were proposed, and the analytical hierarchy process was used for the integrated assessment. For a river ecosystem, the percentage of mean annual flow was used to define the grade of environmental flow. For a lake ecosystem, water recharge to the lake to compensate the lake water losses was used to assess the ecological water use of a lake. The flooding level of the wetland and the groundwater level in the riparian plain were used to assess the wetland and riparian ecological water uses, respectively. The proposed model was applied to a basin in northern Xinjiang in northwest China, where both water diversion and inter-basin water transfer projects were planned to be carried out. Based on assessment results for the whole study area and two sub-areas, an appropriate scheme was recommended from four planning schemes. With the recommended scheme, ecological water uses of the influenced ecosystems can be maintained at an acceptable level. Meanwhile, economical water requirements can be met to a great extent.展开更多
In 2013, The Turkish Ministry of Environment and Urban Planning issued four thousand pages of a cut and paste Environmental Impact Assessment (EIA) report for the Akkuyu nuclear power plant and nuclear fuel fabricat...In 2013, The Turkish Ministry of Environment and Urban Planning issued four thousand pages of a cut and paste Environmental Impact Assessment (EIA) report for the Akkuyu nuclear power plant and nuclear fuel fabrication complex project located on Turkey's Mediterranean coastline, in the Mersin providence, which will be built on a build-own-operate basis by Russian company Rosatom. Numerous complaints have already been filed against the EIA, challenging the scientific integrity of the report on the following grounds: misrepresentation of failure to specify the radioactive inventory and of projected releases into the environment, omitting tritium and carbon-14; incomplete information about the toxic chemicals which will be injected into the cooling system throughout the nuclear complex; misleading information about the cooling water's temporal and chemical effects on marine life; lack of details on an emergency evacuation plan; lack of a comprehensive nuclear waste management plan; unspecified insurance coverage for the nuclear complex, noncompliance with third party liability requirements. Coupled with these complaints are allegations that signatures on some sensitive reports contained or referred to have been falsified.展开更多
The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because th...The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because that the height of wind power generator generally exceeds 100 m,and visual range in plain region is farther,it is necessary to scientifically and rationally evaluate and analyze landscape visual environment impact of wind power generator in plain region. One wind power farm project of Zhanjiang is located in typical plain region of Guangdong coast. Referring to traditional analytic method of landscape visual impact and comparing with actual situation for the same kind of project in the region,results show that it is " extremely sensitive" area at 0- 2. 5 km from wind power generator, " very sensitive" area at 2. 5- 5. 0 km, " sensitive" area at 5- 10 km, "generally sensitive" area at 10- 20 km,and non-sensitive area outside 20 km.展开更多
The anaerobic digestion(AD)disposal of stover and cattle manure is of great significance to the development of low-carbon economy and green energy in China,but it will also have an impact on the environment,and the de...The anaerobic digestion(AD)disposal of stover and cattle manure is of great significance to the development of low-carbon economy and green energy in China,but it will also have an impact on the environment,and the degree of influence is different for various raw materials.In this study,life cycle assessment(LCA)methods were applied to analyze and compare the impact of corn stovers biogas projects(CSBP)and dairy manure biogas projects(DMBP)on the environment during the whole operation stage.The results of inventory analysis were evaluated by ReCiPe2016 Hierarchy(H)mid-point(problem-oriented)and end-point(destruction-oriented)method,respectively.The results showed that the net energy efficiency of CSBP was higher(763.903 kW·h/FU)and the greenhouse gas(GHG)emission reduction of DMBP was more(5541.418 kg CO_(2)-eq/FU).The anaerobic digestion(AD)units have the greatest environmental impacts,and human carcinogenic toxicity is the largest environmental impact category(1.16-1.43 PE).The key to reducing environmental impact is reducing the input of chemical substances and the waste of electric energy.Both CSBP and DMBP have a favorable impact on ecosystem quality and resources,and CSBP is more beneficial to the environment(-10.297 Pt).Co-digestion is an important measure to reduce the environmental damage from biogas projects.These research results provide theoretical support for the selection of raw materials for large-scale biogas projects in China,provide technical basis for reducing the impact of actual operation on the environment,and promote the resource utilization of agricultural waste and carbon dioxide emission reduction and sequestration.展开更多
文摘Substituted plan in the environmental impact assessment (EIA) mainly means the treatment technology and the substituted site of plant, and it also includes the many kinds of environment protection measures. This paper will make detailed analysis on the treatment technology, the substituted site of plant, the purpose of discharged water and the dispose of sludge in the Yongchuan wastewater treatment project.
基金supported by the National Natural Science Foundation of China (Grant No. 50879041)
文摘In arid regions, large-scale water diversion from rivers leads to significant changes in river flow regimes, which may have large impacts on ecological water uses of river-dependent ecosystems, such as river, lake, wetland, and riparian ecosystems. To assess the integrated impact of water diversion on ecological water uses, we proposed a hierarchy evaluation model composed of four layers representing the evaluation goal, sub-areas of the influenced region, evaluation criteria, and water diversion schemes, respectively. The evaluation criteria for different types of ecological water uses were proposed, and the analytical hierarchy process was used for the integrated assessment. For a river ecosystem, the percentage of mean annual flow was used to define the grade of environmental flow. For a lake ecosystem, water recharge to the lake to compensate the lake water losses was used to assess the ecological water use of a lake. The flooding level of the wetland and the groundwater level in the riparian plain were used to assess the wetland and riparian ecological water uses, respectively. The proposed model was applied to a basin in northern Xinjiang in northwest China, where both water diversion and inter-basin water transfer projects were planned to be carried out. Based on assessment results for the whole study area and two sub-areas, an appropriate scheme was recommended from four planning schemes. With the recommended scheme, ecological water uses of the influenced ecosystems can be maintained at an acceptable level. Meanwhile, economical water requirements can be met to a great extent.
文摘In 2013, The Turkish Ministry of Environment and Urban Planning issued four thousand pages of a cut and paste Environmental Impact Assessment (EIA) report for the Akkuyu nuclear power plant and nuclear fuel fabrication complex project located on Turkey's Mediterranean coastline, in the Mersin providence, which will be built on a build-own-operate basis by Russian company Rosatom. Numerous complaints have already been filed against the EIA, challenging the scientific integrity of the report on the following grounds: misrepresentation of failure to specify the radioactive inventory and of projected releases into the environment, omitting tritium and carbon-14; incomplete information about the toxic chemicals which will be injected into the cooling system throughout the nuclear complex; misleading information about the cooling water's temporal and chemical effects on marine life; lack of details on an emergency evacuation plan; lack of a comprehensive nuclear waste management plan; unspecified insurance coverage for the nuclear complex, noncompliance with third party liability requirements. Coupled with these complaints are allegations that signatures on some sensitive reports contained or referred to have been falsified.
文摘The construction of wind power project is conducive to saving energy,reducing emissions and regulating energy structure. But it inevitably causes some impacts on the environment in the construction process. Because that the height of wind power generator generally exceeds 100 m,and visual range in plain region is farther,it is necessary to scientifically and rationally evaluate and analyze landscape visual environment impact of wind power generator in plain region. One wind power farm project of Zhanjiang is located in typical plain region of Guangdong coast. Referring to traditional analytic method of landscape visual impact and comparing with actual situation for the same kind of project in the region,results show that it is " extremely sensitive" area at 0- 2. 5 km from wind power generator, " very sensitive" area at 2. 5- 5. 0 km, " sensitive" area at 5- 10 km, "generally sensitive" area at 10- 20 km,and non-sensitive area outside 20 km.
基金supported by the National Key Research and Development Program of China(Grant No.2023YFE0106000)the National Natural Science Foundation of China(Grant No.52206234).
文摘The anaerobic digestion(AD)disposal of stover and cattle manure is of great significance to the development of low-carbon economy and green energy in China,but it will also have an impact on the environment,and the degree of influence is different for various raw materials.In this study,life cycle assessment(LCA)methods were applied to analyze and compare the impact of corn stovers biogas projects(CSBP)and dairy manure biogas projects(DMBP)on the environment during the whole operation stage.The results of inventory analysis were evaluated by ReCiPe2016 Hierarchy(H)mid-point(problem-oriented)and end-point(destruction-oriented)method,respectively.The results showed that the net energy efficiency of CSBP was higher(763.903 kW·h/FU)and the greenhouse gas(GHG)emission reduction of DMBP was more(5541.418 kg CO_(2)-eq/FU).The anaerobic digestion(AD)units have the greatest environmental impacts,and human carcinogenic toxicity is the largest environmental impact category(1.16-1.43 PE).The key to reducing environmental impact is reducing the input of chemical substances and the waste of electric energy.Both CSBP and DMBP have a favorable impact on ecosystem quality and resources,and CSBP is more beneficial to the environment(-10.297 Pt).Co-digestion is an important measure to reduce the environmental damage from biogas projects.These research results provide theoretical support for the selection of raw materials for large-scale biogas projects in China,provide technical basis for reducing the impact of actual operation on the environment,and promote the resource utilization of agricultural waste and carbon dioxide emission reduction and sequestration.