期刊文献+
共找到3篇文章
< 1 >
每页显示 20 50 100
Surface coal mine permit application for successful reclamation, semi-arid shortgrass prairie (Wyoming, USA) 被引量:3
1
作者 Anna Krzyszowska Waitkus 《International Journal of Coal Science & Technology》 EI 2018年第1期8-17,共10页
Approximately 40% of USA coal originates in an ecologically sensitive area of semi-arid shortgrass prairie in Wyoming. Before a surface coal mine can begin operation in the USA, it must secure a mining permit and comp... Approximately 40% of USA coal originates in an ecologically sensitive area of semi-arid shortgrass prairie in Wyoming. Before a surface coal mine can begin operation in the USA, it must secure a mining permit and comply with regulations and performance standards under the USA Surface Mining Control and Reclamation Act (SMCRA), other federal environmental acts, and state programs. The Wyoming Department of Environmental Quality (WDEQ)/Land Quality Division (LQD) administers Wyoming's coal regulatory program. The permit application and bonding process for the largest surface coal mine permit in the USA, North Antelope Rochelle Mine (NARM) located in short grassland prairie in the northeast Wyoming, is discussed. The permit application process begins with the collection of baseline environ- mental data that characterizes premining conditions of the permit area. The permit application includes adjudication information, baseline information, mine and operation plans, and reclamation plans. Fulfillment of permit commitments and requirements of rules and regulations are inspected monthly by the LQD' s representative in the field. Before a mine permit is issued, the mine operator must submit a reclamation bond to secure the performance of reclamation obligations that is later revised annually. In Wyoming, four reclamation bond release phases indicate the completion of various stages of the reclamatikon process. NARM's specific bond release verification cirteria, performance standards, and field verificatoins of bond release phases are discussed. The Bond Release Geodatabase (a GIS/GPS approach) was developed for this mine to monitor progress in meeting criteria and performance standards for incremental bond release. The Bond Release Geodatabase significantly reduces the time needed to track bond release progress, reach agreement between operator and regulator, and improve the state inspector's ability to assess reclamation adequacy and progress. 展开更多
关键词 Surface coal mine permitting Bonding RECLAMATION GIS/GPS geodatabase USA rules and regulations Inspections
下载PDF
PBRRI: A Hybrid Peer-to-Peer Communication Model in Distributed Systems
2
作者 张亚英 尤晋元 《Journal of Shanghai Jiaotong university(Science)》 EI 2003年第2期128-132,共5页
In distributed systems independent agents need to interact with each other to accomplish their task. Modern peer-to-peer computing technologies always concern with enabling interaction among agents and help them coope... In distributed systems independent agents need to interact with each other to accomplish their task. Modern peer-to-peer computing technologies always concern with enabling interaction among agents and help them cooperate with each other. But in fact, access control should also be considered to limit interaction to make it harmless. This paper proposed a proxy based rule regulated interaction (PBRRI) model. Role based access control is introduced for security concerns. Regulation rules are enforced in a distributed manner so that PBRRI can be applied to the open distributed systems such as Internet. 展开更多
关键词 PEER-TO-PEER interaction rules regulation GROUP role based access control
下载PDF
Eating at Ease New regulation details rules under the Food Safety Law
3
作者 YIN PUMIN 《Beijing Review》 2009年第31期22-23,共2页
The State Council, China’s cabinet,promulgated the Regulation on the Implementation of the Food Safety Law on July 8.
关键词 Eating at Ease New regulation details rules under the Food Safety Law MOH
原文传递
上一页 1 下一页 到第
使用帮助 返回顶部