The specialized equipment utilized in long-line tunnel engineering is evolving towards large-scale,multifunctional,and complex orientations.The vibration caused by the high-frequency units during regular operation is ...The specialized equipment utilized in long-line tunnel engineering is evolving towards large-scale,multifunctional,and complex orientations.The vibration caused by the high-frequency units during regular operation is supported by the foundation of the units,and the magnitude of vibration and the operating frequency fluctuate in different engineering contexts,leading to variations in the dynamic response of the foundation.The high-frequency units yield significantly diverse outcomes under different startup conditions and times,resulting in failure to meet operational requirements,influencing the normal function of the tunnel,and causing harm to the foundation structure,personnel,and property in severe cases.This article formulates a finite element numerical computation model for solid elements using three-dimensional elastic body theory and integrates field measurements to substantiate and ascertain the crucial parameter configurations of the finite element model.By proposing a comprehensive startup timing function for high-frequency dynamic machines under different startup conditions,simulating the frequency andmagnitude variations during the startup process,and suggesting functions for changes in frequency and magnitude,a simulated startup schedule function for high-frequency machines is created through coupling.Taking into account the selection of the transient dynamic analysis step length,the dynamic response results for the lower dynamic foundation during its fundamental frequency crossing process are obtained.The validation checks if the structural magnitude surpasses the safety threshold during the critical phase of unit startup traversing the structural resonance region.The design recommendations for high-frequency units’dynamic foundations are provided,taking into account the startup process of the machine and ensuring the safe operation of the tunnel.展开更多
Intensity modulated radiation therapy (IMRT) is a highly accurate technique that is usually implemented in either dynamic or step-and-shoot fashion with many segments each having low monitor units (MUs). The present s...Intensity modulated radiation therapy (IMRT) is a highly accurate technique that is usually implemented in either dynamic or step-and-shoot fashion with many segments each having low monitor units (MUs). The present study evaluated the effects of beam startup characteristics on the dose delivery accuracy for each segment at low MUs for step-and-shoot IMRT with an Elekta Precise accelerator at the highest dose rates. We used a two-dimensional semi-conductor detector for the dose measurements. The field size of each segment was assumed to be 20 ×20 cm2 and each segment was set to deliver 1 - 10 MUs. Our results show a variation in dose delivery accuracy between segments for the same IMRT beam, which can be attributed to the beam startup characteristics. This variability is attributed to the changes in the transient changes in the temperatures of the electron gun filament and the magnetron. That is, the transient increase in the temperature of the filament leads to increasing doses with time and that of the magnetron leads to decreasing doses with time during the first few MUs.展开更多
基金Smart Integration Key Technologies and Application Demonstrations of Large Scale Underground Space Disaster Prevention and Reduction in Guangzhou International Financial City([2021]–KJ058).
文摘The specialized equipment utilized in long-line tunnel engineering is evolving towards large-scale,multifunctional,and complex orientations.The vibration caused by the high-frequency units during regular operation is supported by the foundation of the units,and the magnitude of vibration and the operating frequency fluctuate in different engineering contexts,leading to variations in the dynamic response of the foundation.The high-frequency units yield significantly diverse outcomes under different startup conditions and times,resulting in failure to meet operational requirements,influencing the normal function of the tunnel,and causing harm to the foundation structure,personnel,and property in severe cases.This article formulates a finite element numerical computation model for solid elements using three-dimensional elastic body theory and integrates field measurements to substantiate and ascertain the crucial parameter configurations of the finite element model.By proposing a comprehensive startup timing function for high-frequency dynamic machines under different startup conditions,simulating the frequency andmagnitude variations during the startup process,and suggesting functions for changes in frequency and magnitude,a simulated startup schedule function for high-frequency machines is created through coupling.Taking into account the selection of the transient dynamic analysis step length,the dynamic response results for the lower dynamic foundation during its fundamental frequency crossing process are obtained.The validation checks if the structural magnitude surpasses the safety threshold during the critical phase of unit startup traversing the structural resonance region.The design recommendations for high-frequency units’dynamic foundations are provided,taking into account the startup process of the machine and ensuring the safe operation of the tunnel.
文摘Intensity modulated radiation therapy (IMRT) is a highly accurate technique that is usually implemented in either dynamic or step-and-shoot fashion with many segments each having low monitor units (MUs). The present study evaluated the effects of beam startup characteristics on the dose delivery accuracy for each segment at low MUs for step-and-shoot IMRT with an Elekta Precise accelerator at the highest dose rates. We used a two-dimensional semi-conductor detector for the dose measurements. The field size of each segment was assumed to be 20 ×20 cm2 and each segment was set to deliver 1 - 10 MUs. Our results show a variation in dose delivery accuracy between segments for the same IMRT beam, which can be attributed to the beam startup characteristics. This variability is attributed to the changes in the transient changes in the temperatures of the electron gun filament and the magnetron. That is, the transient increase in the temperature of the filament leads to increasing doses with time and that of the magnetron leads to decreasing doses with time during the first few MUs.